Federal Register / Vol. 73, No.

73 / Tuesday, April 15, 2008 / Notices 20273

issue that may affect the responsibilities application. A competing license intervene must also be served upon each
of a particular resource agency, they application must conform with 18 CFR representative of the Applicant
must also serve a copy of the document 4.30(b) and 4.36. specified in the particular application.
on that resource agency. o. Notice of Intent—A notice of intent s. Agency Comments—Federal, state,
k. Description of Project: The must specify the exact name, business and local agencies are invited to file
proposed project would consist of: (1) address, and telephone number of the comments on the described application.
An existing 308-foot-long, 47-foot-high prospective applicant, and must include A copy of the application may be
Ohio Edison Gorge Dam, (2) an existing an unequivocal statement of intent to obtained by agencies directly from the
reservoir having a surface area of 34 submit, if such an application may be Applicant. If an agency does not file
acres, having a storage capacity of 589 filed, either a preliminary permit comments within the time specified for
acre-feet and normal water surface application or a development filing comments, it will be presumed to
elevation of 912 feet mean sea level, (3) application (specify which type of have no comments. One copy of an
a proposed 700-foot-long, 90-inch- application). A notice of intent must be agency’s comments must also be sent to
diameter penstock, (4) a proposed served on the applicant(s) named in this the Applicant’s representatives.
powerhouse containing two generating public notice.
units with a total installed capacity of p. Proposed Scope of Studies Under Kimberly D. Bose,
2.5 megawatts, (5) a proposed 0.5-mile- Permit—A preliminary permit, if issued, Secretary.
long 12.5 kilovolt transmission line, and does not authorize construction. The [FR Doc. E8–7921 Filed 4–14–08; 8:45 am]
(6) appurtenant facilities. The applicant term of the proposed preliminary permit BILLING CODE 6717–01–P
estimates that the average annual would be 36 months. The work
generation would be 11 gigawatt-hours, proposed under the preliminary permit
which would be sold to a local utility. would include economic analysis, DEPARTMENT OF ENERGY
l. This filing is available for review at preparation of preliminary engineering
the Commission in the Public Reference plans, and a study of environmental Federal Energy Regulatory
Room or may be viewed on the impacts. Based on the results of these Commission
Commission’s Web site at http:// studies, the Applicant would decide [Project No. 13138–000]
www.ferc.gov using the ‘‘eLibrary’’ link. whether to proceed with the preparation
Enter the docket number excluding the of a development application to Stoughton Water Power Company,
last three digits in the docket number construct and operate the project. LLC; Notice of Application Accepted
field to access the document. For q. Comments, Protests, or Motions to for Filing and Soliciting Motions To
assistance, call toll-free 1–866–208– Intervene—Anyone may submit Intervene, Protests, and Comments
3676 or e-mail comments, a protest, or a motion to
FERCONLINESUPPORT@FERC.GOV. intervene in accordance with the April 8, 2008.
For TTY, call (202) 502–8659. A copy is requirements of Rules of Practice and Take notice that the following
also available for inspection and Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed
reproduction at the address in item h In determining the appropriate action to with the Commission and is available
above. take, the Commission will consider all for public inspection:
m. Competing Preliminary Permit— protests or other comments filed, but a. Type of Application: Preliminary
Anyone desiring to file a competing only those who file a motion to Permit.
application for preliminary permit for a intervene in accordance with the b. Project No.: 13138–000.
proposed project must submit the Commission’s Rules may become a c. Date filed: March 3, 2008.
competing application itself, or a notice party to the proceeding. Any comments, d. Applicant: Stoughton Water Power
of intent to file such an application, to protests, or motions to intervene must Company, LLC.
the Commission on or before the be received on or before the specified e. Name of Project: Stoughton Project.
specified comment date for the comment date for the particular f. Location: On the Yahara River, in
particular application (see 18 CFR 4.36). application. Dane County, Wisconsin. The Dam is
Submission of a timely notice of intent r. Filing and Service of Responsive own by the City of Stoughton, WI.
allows an interested person to file the Documents—Any filings must bear in g. Filed Pursuant to: Federal Power
competing preliminary permit all capital letters the title Act, 16 U.S.C. 791(a)–825(r).
application no later than 30 days after ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT h. Applicant Contact: Mr. Thomas J.
the specified comment date for the TO FILE COMPETING APPLICATION’’, Reiss, Stoughton Water Power
particular application. A competing ‘‘COMPETING APPLICATION’’, Company, P.O. Box 553, 319 Hart Street,
preliminary permit application must ‘‘PROTEST’’, and ‘‘MOTION TO Watertown, WI 53094, (9206) 261–2139.
conform with 18 CFR 4.30(b) and 4.36. INTERVENE’’, as applicable, and the i. FERC Contact: Robert Bell, (202)
n. Competing Development Project Number of the particular 502–6062.
Application—Any qualified application to which the filing refers. j. Deadline for filing comments,
development applicant desiring to file a Any of the above-named documents protests, and motions to intervene: 60
competing development application must be filed by providing the original days from the issuance date of this
must submit to the Commission, on or and the number of copies provided by notice.
before a specified comment date for the the Commission’s regulations to: The All documents (original and eight
particular application, either a Secretary, Federal Energy Regulatory copies) should be filed with: Kimberly
competing development application or a Commission, 888 First Street, NE., D. Bose, Secretary, Federal Energy
notice of intent to file such an Washington, DC 20426. An additional Regulatory Commission, 888 First
application. Submission of a timely copy must be sent to Director, Division Street, NE., Washington, DC 20426.
jlentini on PROD1PC65 with NOTICES

notice of intent to file a development of Hydropower Administration and Comments, protests, and interventions
application allows an interested person Compliance, Federal Energy Regulatory may be filed electronically via the
to file the competing application no Commission, at the above-mentioned Internet in lieu of paper; see 18 CFR
later than 120 days after the specified address. A copy of any notice of intent, 385.2001(a)(1)(iii) and the instructions
comment date for the particular competing application or motion to on the Commission’s Web site under the

VerDate Aug<31>2005 17:31 Apr 14, 2008 Jkt 214001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\15APN1.SGM 15APN1
20274 Federal Register / Vol. 73, No. 73 / Tuesday, April 15, 2008 / Notices

‘‘e-Filing’’ link. The Commission particular application. A competing ‘‘COMPETING APPLICATION’’,


strongly encourages electronic filings. preliminary permit application must ‘‘PROTEST’’, and ‘‘MOTION TO
Please include the project number (P– conform with 18 CFR 4.30(b) and 4.36. INTERVENE’’, as applicable, and the
13138–000) on any comments or o. Competing Development Project Number of the particular
motions filed. Application—Any qualified application to which the filing refers.
The Commission’s Rules of Practice development applicant desiring to file a Any of the above-named documents
and Procedure require all intervenors competing development application must be filed by providing the original
filing documents with the Commission must submit to the Commission, on or and the number of copies provided by
to serve a copy of that document on before a specified comment date for the the Commission’s regulations to: The
each person in the official service list particular application, either a Secretary, Federal Energy Regulatory
for the project. Further, if an intervenor competing development application or a Commission, 888 First Street, NE.,
files comments or documents with the notice of intent to file such an Washington, DC 20426. An additional
Commission relating to the merits of an application. Submission of a timely copy must be sent to Director, Division
issue that may affect the responsibilities notice of intent to file a development of Hydropower Administration and
of a particular resource agency, they application allows an interested person Compliance, Federal Energy Regulatory
must also serve a copy of the document to file the competing application no Commission, at the above-mentioned
on that resource agency. later than 120 days after the specified address. A copy of any notice of intent,
k. Description of Project: The comment date for the particular competing application or motion to
proposed project would consist of: (1) application. A competing license intervene must also be served upon each
An existing 200-foot-long, 9-foot-high application must conform with 18 CFR representative of the Applicant
Stoughton Dam, (2) an existing 4.30(b) and 4.36. specified in the particular application.
impoundment having a surface area of p. Notice of Intent—A notice of intent t. Agency Comments—Federal, state,
11 acres, with a storage capacity of 80 must specify the exact name, business and local agencies are invited to file
acre-feet and normal water surface address, and telephone number of the comments on the described application.
elevation of 841.5 feet mean sea level, prospective applicant, and must include A copy of the application may be
(3) an existing 200-foot-long power an unequivocal statement of intent to obtained by agencies directly from the
canal, (4) a proposed power house submit, if such an application may be Applicant. If an agency does not file
containing two generating units having filed, either a preliminary permit comments within the time specified for
a total installed capacity of 192 application or a development filing comments, it will be presumed to
kilowatts, (5) a proposed 350-foot-long application (specify which type of have no comments. One copy of an
transmission line, and (6) appurtenant application). A notice of intent must be agency’s comments must also be sent to
facilities. The proposed project would served on the applicant(s) named in this the Applicant’s representatives.
have an estimated average annual public notice.
generation of 450 megawatt-hours, q. Proposed Scope of Studies Under Kimberly D. Bose,
which would be sold to a local utility. Permit—A preliminary permit, if issued, Secretary.
l. Location of Application: This filing does not authorize construction. The [FR Doc. E8–7925 Filed 4–14–08; 8:45 am]
is available for review at the term of the proposed preliminary permit BILLING CODE 6717–01–P
Commission in the Public Reference would be 36 months. The work
Room or may be viewed on the proposed under the preliminary permit
Commission’s Web site at http:// would include economic analysis, DEPARTMENT OF ENERGY
www.ferc.gov using the ‘‘eLibrary’’ link. preparation of preliminary engineering
Enter the docket number excluding the plans, and a study of environmental Federal Energy Regulatory
last three digits in the docket number impacts. Based on the results of these Commission
field to access the document. For studies, the Applicant would decide
[Project No. 12486–002]
assistance, call toll-free 1–866–208– whether to proceed with the preparation
3676 or e-mail of a development application to Twin Lakes Canal Company; Notice of
FERCONLINESUPPORT@FERC.GOV. construct and operate the project. Application Accepted for Filing and
For TTY, call (202) 502–8659. A copy is r. Comments, Protests, or Motions to Soliciting Motions To Intervene,
also available for inspection and Intervene—Anyone may submit Protests, and Comments
reproduction at the address in item h comments, a protest, or a motion to
above. intervene in accordance with the April 8, 2008.
m. Individuals desiring to be included requirements of Rules of Practice and Take notice that the following
on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed
so indicate by writing to the Secretary In determining the appropriate action to with the Commission and is available
of the Commission. take, the Commission will consider all for public inspection:
n. Competing Preliminary Permit— protests or other comments filed, but a. Type of Application: Preliminary
Anyone desiring to file a competing only those who file a motion to Permit.
application for preliminary permit for a intervene in accordance with the b. Project No.: 12486–002.
proposed project must submit the Commission’s Rules may become a c. Date filed: February 5, 2008.
competing application itself, or a notice party to the proceeding. Any comments, d. Applicant: Twin Lakes Canal
of intent to file such an application, to protests, or motions to intervene must Company.
the Commission on or before the be received on or before the specified e. Name of Project: Bear River
specified comment date for the comment date for the particular Narrows Project.
particular application (see 18 CFR 4.36). application. f. Location: On the Bear River, in
jlentini on PROD1PC65 with NOTICES

Submission of a timely notice of intent s. Filing and Service of Responsive Franklin County, Idaho.
allows an interested person to file the Documents—Any filings must bear in g. Filed Pursuant to: Federal Power
competing preliminary permit all capital letters the title Act, 16 U.S.C. 791(a)–825(r).
application no later than 30 days after ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT h. Applicant Contact: Nicholas Josten,
the specified comment date for the TO FILE COMPETING APPLICATION’’, Twin Lakes Canal Company Authority,

VerDate Aug<31>2005 17:31 Apr 14, 2008 Jkt 214001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\15APN1.SGM 15APN1