DESIGN&CONSTRUCTABILITYOF
DIAPHRAGMWALLS:
QUALITYASSURANCE&QUALITYCONTROL
RAYMONDJ.POLETTO,PE
MUESERRUTLEDGECONSULTINGENGINEERS
W W W. M R C E . C O M
QUALITYASSURANCE&
QUALITYCONTROL:GOALS
1.LimitDefectsInPanel
Construction
2.GoodCooperation
NeededByOwners
Representative,Design
Engineer,SpecialtyAnd
GeneralContractors
3.ImplementDesignOr
WorkChangesIfField
ConditionsOrConstruction
MethodsShowProblems
4.AvoidLitigationBy
ProperCommunication
QUALITYASSURANCE&QUALITY
CONTROL:WORKPROCESS
1.SetOutConstruction
ProceduresWhichAre
ReasonableExpectationsOf
AchievingTheSlurryWall
Function.(LateralOrVertical
StructuralElementAndToLimit
TheFlowOfGroundwater)
2.ContractorProvidesThe
QualityControlOfTheSlurry
WallConstructionPerContract
RequirementsOrIndustry
Standards
3.InspectionsProvideThe
QualityAssuranceOfThe
ConstructedWallAndProvideA
RecordOfConstruction
Procedures
4.FieldConditionsandWork
ProceduresShouldBeCarefully
ReviewedByExperienced
Geotechnical&Structural
PersonnelRelatingCausesAnd
EffectsAsCloselyAsPossible
UNDERSTANDINGPROJECT
EXPECTATIONS&REQUIREMENTS
1.PanelTypesand
ConstructionMethods
(TemporaryorPermanentWalls)
4.Inspectionby
Contractorandby
OwnersTeam
2.ExpectLimited
SeepageofWatertight
Systems&Possible
NeedforInterior
Drainage
5.Address
ConstructionDefects
&Repairs
3.Expect
IrregularitiesinWall
Face
6.ReviewGoodorPoor
PracticesbyConstruction
Team
PANELCONSTRUCTIONMETHODS
PanelTypes
Post
Tensioned
Walls
Segmented
Concrete
Panels
Individual
LoadBearing
Elements
PrecastWalls
SoldierBeam
&Concrete
Walls(SPTC)
Reinforced
Concrete
Panels
FORMEDWALLJOINTS
1.RoundPipe
Joints
2.SteelBeam
Joint(SoldierPile
TremieConcrete)
3.KeyJoint
4.KeyJointwith
Waterstop
PANELJOINTS
SEMI
CIRCULAR
PANELJOINT
FORMEDBY
ENDSTOPPIPE
SPECIALEND
STOPDEVICE
WITHPVC
WATERSTOP
FORKEYIN
PANELJOINT
REINFORCEDCONCRETEPANEL
SEQUENCE
PANELMETHODWITHHYDROMILL
OVERCUTIN
PRIMARY
PANELBY
HYDROMILL
EXPECTWALLSEEPAGE&
MOISTURECONTROL
WatertightWall
SystemsAllow
MinorWall
Seepage
SomeWallPanels
MayHaveSeepage
TiebackSleeves&
AnchorHeadsMay
Leak
Seepage&
MoistureControl
MethodsAre
Needed
IDEALWATERTIGHTNESSOFJOINTS&
FACEOFPANELS
TYPICALWALLSEEPAGE
BEFOREFINALSEALING
WALLLEAKSBEFOREGROUTING
SEALINGOF
TIEBACK
SLEEVES&
HEADS
TREATEDWALL
WITHINTERIOR
DRAINAGE
COLLECTION
SYSTEM
IRREGULARITIESINWALLFACE
RemoveBentonite
orCementFillin
PanelJoint
FillWallVoidsin
PanelConcrete&
CutFloorSlabKeys
RemoveOverpours
ofPanelConcrete
TrimConcreteat
TopofWall
REMOVE
BENTONITE
FILLINPANEL
JOINT
10
FILLWALLVOIDSINPANELS
CUTFLOORSLABKEYS
REMOVE
CONCRETE
OVERPOURSIN
PANELS
11
TRIM
CONCRETEAT
TOPOFWALL
INSPECTORSROLEINCHECKINGWORK
QUALITY&MATERIALS
ProperInspectionbyaqualifiedgeotechnicalengineerand/or
inspectorfamiliarandexperiencedwithinstallationandtesting
slurryfluids,concreteandstructuralsteelisessentialtothe
successivecompletionofthisworkbecausetoalargeextent
problemsoccurwithinactionorinabilitytounderstandconstruction
procedures,sitegeologicalconditionsandtestresults.The
evaluationsoftheseelementsarecriticalinachievingqualitywork.
Theinspectorneedstoreviewthecontractorsworkincluding
samplingofallmaterialsandcarefullymonitoringandcollectingthe
requiredtestinformationforproperqualityassurance.Many
projectshaveexperiencedsevereproblems;costoverrunsand
delaysbecausetheprojectownersandconstructionmanagement
teamreliedonuntrained,inexperiencedandnon motivated
inspectors.
12
QUALITYASSURANCECHECKS
VerificationDrillingInKeyStratum(SometimesNeedIn
RockOrDenseAlluvialandGlacialDeposits)
VerticalityChecks
BentoniteTesting
ConcreteTesting
EndBearing:CheckforLooseSoilorRock
SiteMonitoring&Instrumentation
UponWallExposure:VisualChecksOfWallSeepage,
ConcreteFascia,PanelJointsAndKeys,SealingLeaksand
WallRepairs
IndustryPracticeStandardsandDFIPracticeGuidelines
ForStructuralWall
WALL
TOLERANCES
13
CONTROLPANELEXCAVATIONBY
CHECKINGBUCKETDEVIATIONWITHIN
GUIDEWALLS
TRENCH
SUPPORTBY
BENTONITE
SLURRYIN
VARIOUS
SOILS
14
SLURRYFLUID
INSPECTION
REPORTFORM
MAKESLURRYFLUIDCHECKSBEFORE
PLACEMENTOFCONCRETE
15
PANELCAGEFABRICATION
INSTALLATION
OFTYPICAL
REINFORCING
CAGE
16
SLURRYWALL
PANELREPORT
FORM
CHECKSDURINGTHE
PLACEMENTOFCONCRETE
17
POURINGTREMIECONCRETE
INTOPANEL
TREMIECONCRETEREPORTFORM
18
TROUBLESHOOTING&
PROBLEMSOLVING:
FIELDRECORDSCANREVEAL
POTENTIALCORRECTIVEWORK
ORDEFECTS
TREMIE
CONCRETE
POURCHART
19
MONITORWALLCONDITIONSDURING
EXCAVATIONSTAGES
MONITORTHEWALLMOVEMENTS&
CRACKSINPAVEMENTSWHILE
WAITINGFORLEAKREPAIRS
20
OBSERVECONSTRUCTIONDEFECTS,
REPAIRS&CORRECTIVEWORK
CONSEQUENCESOFPOOR
QUALITYCONTROLOR
INSPECTION
21
STOPPINGWALLORTIEBACK
ANCHORLEAKSISVERYIMPORTANT
WALLLEAKSUNATTENDED
WILLINTIMEBEAPROBLEM
22
SUMMARYOFGOOD
QA/QCPRACTICES
Good
Construction
Inspection&
QualityControl
MeasuresAssure
Better
Construction
AttendtoPanel
DefectsinTimely
Manner
Timely
Communication
BetweenParties
THANKYOU QUESTIONSWILLNOWBETAKEN
RAYMONDJ.POLETTO,PE
MUESERRUTLEDGECONSULTINGENGINEERS
W W W. M R C E . C O M
23