Вы находитесь на странице: 1из 3

Federal Register / Vol. 73, No.

69 / Wednesday, April 9, 2008 / Notices 19265

R14 Range DP Rev. 0, App. A, License II submit supporting safety analyses in


No. SMB–141, Am. 27— time to meet the conversion schedule.
ML073180578. Title 10, Section 50.64, ‘‘Limitations Paragraph 50.64(c)(2)(iii) also requires
on the Use of Highly Enriched Uranium the Director to review the licensee
R14 Range DP Rev. 0, App. B, (HEU) in Domestic Non-Power
Characterization Report— proposal, to confirm the status of
Reactors,’’ of the Code of Federal Federal Government funding, and to
ML073180594. Regulations (10 CFR 50.64), limits the determine a final schedule, if the
R14 Range DP Rev. 0, App. C, use of high-enriched uranium (HEU) licensee has submitted a schedule for
Determination of DCGLs— fuel in domestic non-power reactors conversion.
ML073180601. (research and test reactors) (see 51 FR Paragraph 50.64(c)(3) requires the
R14 Range DP Rev. 0, App. D, Final 6514). The regulation, which became Director to review the supporting safety
Status Survey Plan—ML073180603. effective on March 27, 1986, requires analyses and to issue an appropriate
that if Federal Government funding for enforcement order directing both the
If you do not have access to ADAMS conversion-related costs is available, conversion and, to the extent consistent
or if there are problems in accessing the each licensee of a non-power reactor with the protection of public health and
documents located in ADAMS, contact authorized to use HEU fuel shall replace safety, any necessary changes to the
the NRC Public Document Room (PDR) it with low-enriched uranium (LEU) fuel license, the facility, and licensee
Reference staff at 1–800–397–4209, 301– acceptable to the Commission unless the procedures. In the Federal Register
415–4737, or by e-mail to pdr@nrc.gov. Commission has determined that the notice of the final rule (51 FR 6514), the
These documents may also be viewed reactor has a unique purpose. The Commission explained that in most, if
electronically on the public computers Commission’s stated purpose for these not all, cases, the enforcement order
located at the NRC’s PDR, O 1 F21, One requirements was to reduce, to the would be an order to modify the license
White Flint North, 11555 Rockville maximum extent possible, the use of under 10 CFR 2.204 (now 10 CFR 2.202,
Pike, Rockville, MD 20852. The PDR HEU fuel in order to reduce the risk of ‘‘Orders’’).
reproduction contractor will copy theft and diversion of HEU fuel used in Any person, other than the licensee,
documents for a fee. non-power reactors. whose interest may be affected by this
Dated at 475 Allendale Road, King of Paragraphs 50.64(b)(2)(i) and (ii) proceeding and who desires to
Prussia, PA, this 2nd day of April, 2008. require that a licensee of a non-power participate as a party must file a written
For the Nuclear Regulatory Commission. reactor (1) not acquire more HEU fuel if request for hearing or petition for leave
James P. Dwyer, LEU fuel that is acceptable to the to intervene meeting the requirements of
Chief, Commercial and R&D Branch, Division Commission for that reactor is available 10 CFR 2.309, ‘‘Hearing Requests,
of Nuclear Materials Safety, Region I. when the licensee proposes to acquire Petitions to Intervene, Requirements for
HEU fuel and (2) replace all HEU fuel Standing, and Contentions.’’
[FR Doc. E8–7449 Filed 4–8–08; 8:45 am]
BILLING CODE 7590–01–P in its possession with available LEU fuel III
acceptable to the Commission for that
The U.S. Nuclear Regulatory
reactor in accordance with a schedule
Commission (NRC) maintains the
NUCLEAR REGULATORY determined pursuant to 10 CFR Agencywide Documents Access and
COMMISSION 50.64(c)(2). Management System (ADAMS), which
Paragraph 50.64(c)(2)(i) requires, provides text and image files of the
[Docket No. 50–243; EA–08–099] among other things, that each licensee NRC’s public documents. On November
of a non-power reactor authorized to 6, 2007, the licensee submitted its
In the Matter of Oregon State possess and use HEU fuel develop and conversion proposal (ADAMS
University (Oregon State University submit to the Director of the Office of Accession No. ML080420546), which
TRIGA Reactor); Order Modifying Nuclear Reactor Regulation (the was supplemented on February 11, 2008
Amended Facility Operating License Director) by March 27, 1987, and at 12- (ADAMS Accession No. ML080730057).
No. R–106 month intervals thereafter, a written The NRC staff is in the process of
proposal for meeting the requirements reviewing the conversion proposal. The
I
of the rule. The licensee shall include in licensee indicated that an order,
Oregon State University (the licensee) its proposal a certification that Federal separate from the order for converting
is the holder of Amended Facility Government funding for conversion is the reactor to LEU fuel, is needed that
Operating License No. R–106 (the available through the U.S. Department increases the uranium-235 possession
license), originally issued on March 7, of Energy or other appropriate Federal limit because of a constraint on the
1967, by the U.S. Atomic Energy agency. The proposal should also timing of the shipment of replacement
Commission. The license authorizes provide a schedule for conversion, LEU fuel. The certification of the
operation of the Oregon State University based upon the availability of shipping containers used to transfer the
TRIGA Reactor (the facility) at a power replacement fuel acceptable to the LEU fuel from the manufacturer in
level up to 1100 kilowatts thermal and Commission for that reactor and upon France to the licensee will expire in
in the pulse mode, with reactivity consideration of other factors such as June 2008, before the NRC can issue the
insertions not to exceed 2.55$, and to the availability of shipping casks, order for reactor conversion. Therefore,
receive, possess, and use special nuclear implementation of arrangements for the licensee requires the receipt and
material associated with facility available financial support, and reactor possession, but not use in the reactor, of
operation. The facility is a research usage. the LEU fuel at this time to allow the
mstockstill on PROD1PC66 with NOTICES

reactor located on the campus of Oregon Paragraph 50.64(c)(2)(iii) requires the fuel to be received before the shipping
State University, in the city of Corvallis, licensee to include in the proposal, to container loses its certification. The
Benton County, Oregon. The mailing the extent required to effect conversion, LEU fuel contains the uranium-235
address is Radiation Center, Oregon all necessary changes to the license, the isotope at an enrichment of less than 20
State University, 100 Radiation Center, facility, and licensee procedures. This percent. The NRC staff reviewed the
Corvallis, Oregon 97331–5903. paragraph also requires the licensee to licensee’s proposal and the

VerDate Aug<31>2005 18:06 Apr 08, 2008 Jkt 214001 PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 E:\FR\FM\09APN1.SGM 09APN1
19266 Federal Register / Vol. 73, No. 69 / Wednesday, April 9, 2008 / Notices

requirements of 10 CFR 50.64 and has To comply with the procedural at http://www.nrc.gov/site-help/e-
determined that public health and safety requirements associated with E-Filing, submittals.html or by calling the NRC
and the common defense and security at least 5 days before the filing deadline, technical help line, which is available
require the licensee to receive and the requestor must contact the Office of between 8:30 a.m. and 4:15 p.m., eastern
possess the LEU fuel before conversion. the Secretary by e-mail at time, Monday through Friday. The help
This is necessary so that the hearingdocket@nrc.gov, or by calling line number is (800) 397–4209 or,
manufacturer can ship the LEU fuel to (301) 415–1677, to request (1) a digital locally, (301) 415–4737.
the licensee before the shipping identification (ID) certificate, which Participants who believe that they
container certification expires, to allows the participant (or its counsel or have good cause for not submitting
support conversion in accordance with representative) to digitally sign documents electronically must file a
the schedules planned by the U.S. documents and access the E-Submittal motion, in accordance with 10 CFR
Department of Energy to support U.S. server for any NRC proceeding in which 2.302(g), with their initial paper filing
nonproliferation policies and by the it is participating, and/or (2) creation of requesting authorization to continue to
licensee to support its academic an electronic docket for the proceeding submit documents in paper format.
mission. (even in instances when the requestor Such filings must be submitted by (1)
(or its counsel or representative) already first-class mail addressed to the Office
IV of the Secretary of the Commission, U.S.
holds an NRC-issued digital ID
Accordingly, pursuant to Sections 51, certificate). Each requestor will need to Nuclear Regulatory Commission,
53, 57, 101, 104, 161b, 161i, and 161o download the Workplace Forms Washington, DC 20555–0001, Attention:
of the Atomic Energy Act of 1954, as ViewerTM to access the Electronic Rulemaking and Adjudications Staff; or
amended, and to Commission Information Exchange (EIE), a (2) courier, express mail, or expedited
regulations in 10 CFR 2.202 and 10 CFR component of the E-Filing system. The delivery service to the Office of the
50.64, It is hereby ordered that: Workplace Forms ViewerTM is free and Secretary, Sixteenth Floor, One White
Amended Facility Operating License is available at http://www.nrc.gov/site- Flint North, 11555 Rockville Pike,
No. R–106 is modified by adding the help/e-submittals/install-viewer.html. Rockville, Maryland, 20852, Attention:
following license condition: Information about applying for a digital Rulemaking and Adjudications Staff.
2.B.(5) Pursuant to the Act and 10 CFR ID certificate also is available on the Participants filing a document in this
Part 70, ‘‘Domestic Licensing of Special NRC’s public Web site at http:// manner are responsible for serving the
Nuclear Material,’’ to receive and possess but www.nrc.gov/site-help/e-submittals/ document on all other participants.
not use up to 16.30 kilograms of contained apply-certificates.html. Filing is considered complete by first-
uranium-235 at enrichment less than 20 Once a requestor has obtained a class mail as of the time of deposit in
percent in the form of non-power reactor
digital ID certificate, had a docket the mail, or by courier, express mail, or
fuel.
created, and downloaded the EIE expedited delivery service upon
This Order will be effective 20 days viewer, he or she can then submit a depositing the document with the
after the date of publication of this request for a hearing through EIE. provider of the service.
Order in the Federal Register. Submissions should be in portable Documents submitted in adjudicatory
document format (PDF) in accordance proceedings will appear in the NRC’s
V with NRC guidance available on the electronic hearing docket at http://
Pursuant to 10 CFR 2.309, any NRC public Web site at http:// ehd.nrc.gov/EHD_Proceeding/home.asp,
person(s) whose interest may be affected www.nrc.gov/site-help/e- unless excluded pursuant to an order of
by this proceeding, other than the submittals.html. A filing is considered the Commission, an Atomic Safety and
licensee, and who wishes to participate complete at the time the filer submits Licensing Board, or a Presiding Officer.
as a party in the proceeding must file a the document through EIE. To be timely, Participants are requested not to include
written request within 20 days after the electronic filings must be submitted to personal privacy information, such as
date of publication of this Order, setting the EIE system no later than 11:59 p.m. social security numbers, home
forth with particularity the manner in eastern time on the due date. Upon addresses, or home phone numbers, in
which this Order adversely affects his or receipt of a transmission, the E-Filing their filings. With respect to copyrighted
her interest and addressing the criteria system time-stamps the document and works, except for limited excerpts that
set forth in 10 CFR 2.309. If a hearing sends the submitter an e-mail notice serve the purpose of the adjudicatory
is held, the issue to be considered at confirming receipt of the document. The filings and would constitute a fair use
such hearing shall be whether this EIE system also distributes an e-mail application, participants are requested
Order should be sustained. notice that provides access to the not to include copyrighted materials in
A request for a hearing must be filed document to the NRC Office of the their works.
in accordance with the NRC E-Filing General Counsel and any others who If a hearing is requested, the NRC will
rule, which became effective on October have advised the Office of the Secretary issue an order designating the time and
15, 2007. The NRC issued the E-Filing that they wish to participate in the place of any hearing.
final rule on August 28, 2007 (72 FR proceeding, so that the filer need not In the absence of any request for
49139) and codified it in pertinent part serve the document on those hearing, the provisions as specified in
at 10 CFR Part 2, ‘‘Rules of Practice for participants separately. Therefore, any Section IV shall be final 20 days after
Domestic Licensing Proceedings and others who wish to participate in the the date of publication of this Order in
Issuance of Orders,’’ Subpart B. The E- proceeding (or their counsel or the Federal Register.
Filing process requires participants to representative) must apply for and In accordance with 10 CFR 51.10(d),
submit and serve documents over the receive a digital ID certificate before a this Order is not subject to Section
mstockstill on PROD1PC66 with NOTICES

Internet or, in some cases, to mail copies hearing request is filed so that they may 102(2) of the National Environmental
on electronic optical storage media. obtain access to the document via the E- Policy Act, as amended. The NRC staff
Participants may not submit paper Filing system. notes, however, that with respect to the
copies of their filings unless they seek A person filing electronically may environmental impacts associated with
a waiver in accordance with the seek assistance through the ‘‘Contact the changes imposed by this Order as
procedures described below. Us’’ link located on the NRC Web site described in the safety evaluation, the

VerDate Aug<31>2005 18:06 Apr 08, 2008 Jkt 214001 PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 E:\FR\FM\09APN1.SGM 09APN1
Federal Register / Vol. 73, No. 69 / Wednesday, April 9, 2008 / Notices 19267

changes would, if imposed by other Place: Offices of the Corporation, OVERSEAS PRIVATE INVESTMENT
than an order, meet the definition of a Twelfth Floor Board Room, 1100 New CORPORATION
categorical exclusion in accordance York Avenue, NW., Washington, DC.
with 10 CFR 51.22(c)(9). Thus, pursuant April 17, 2008 Board of Directors
Status: Hearing Open to the Public at
to either 10 CFR 51.10(d) or 10 CFR Meeting
2 p.m.
51.22(c)(9), no environmental
Purpose: Public Hearing in Time and Date: Thursday, April 17,
assessment or environmental impact
conjunction with each meeting of 2008, 10 a.m. (Open Portion); 10:15 a.m.
statement is required.
OPIC’s Board of Directors, to afford an (Closed Portion).
Detailed guidance that the NRC uses Place: Offices of the Corporation,
to review applications from research opportunity for any person to present
Twelfth Floor Board Room, 1100 New
reactor licensees appears in NUREG– views regarding the activities of the
York Avenue, NW., Washington, DC.
1537, ‘‘Guidelines for Preparing and Corporation. Status: Meeting Open to the Public
Reviewing Applications for the Procedures from 10 a.m. to 10:15 a.m. Closed
Licensing of Non-Power Reactors,’’ portion will commence at 10:15 a.m.
February 1996, which can be obtained Individuals wishing to address the (approx.).
from the Commission’s Public hearing orally must provide advance
Document Room (PDR). The public may notice to OPIC’s Corporate Secretary no Matters To Be Considered
also access NUREG–1537 through the later than 5 p.m. Friday, April 11, 2008. 1. President’s Report.
NRC’s Public Electronic Reading Room The notice must include the 2. Approval of January 31, 2008
on the Internet at http://www.nrc.gov/ individual’s name, title, organization, Minutes (Open Portion).
reading-rm/adams.html under ADAMS address, and telephone number, and a Further Matters To Be Considered
Accession Nos. ML042430055 for part 1 concise summary of the subject matter (Closed to the Public 10:15 a.m.)
and ML042430048 for part 2. to be presented.
1. Report from Audit Committee.
For further information, see the Oral presentations may not exceed ten 2. Finance Project—Jordan.
application from the licensee dated (10) minutes. The time for individual 3. Finance Project—Iraq.
November 6, 2007 (ADAMS Accession presentations may be reduced 4. Finance Project—Afghanistan.
No. ML080420546), as supplemented on proportionately, if necessary, to afford 5. Finance Project—Turkey.
February 11, 2008 (ADAMS Accession all participants who have submitted a 6. Finance Project—Mexico.
No. ML080730057); the NRC staff’s 7. Finance Project—Africa.
timely request to participate an
request for additional information 8. Finance Project—Africa.
opportunity to be heard.
(ADAMS Accession No. ML080090308); 9. Approval of January 31, 2008
and the cover letter to the licensee and Participants wishing to submit a Minutes (Closed Portion).
the staff’s safety evaluation dated April written statement for the record must 10. Approval of the March 21, 2008
4, 2008 (ADAMS Accession No. submit a copy of such statement to Minutes (Closed Portion).
ML080730395), available for public OPIC’s Corporate Secretary no later than 11. Pending Major Projects.
inspection at the Commission’s PDR, 5 p.m. Friday, April 11, 2008. Such 12. Reports.
located at One White Flint North, Public statements must be typewritten, double- Contact Person for Information:
File Area O1 F21, 11555 Rockville Pike spaced, and may not exceed twenty-five Information on the meeting may be
(first floor), Rockville, Maryland. (25) pages. obtained from Connie M. Downs at (202)
Publicly available records will be Upon receipt of the required notice, 336–8438.
accessible electronically from the Public
OPIC will prepare an agenda for the Dated: April 3, 2008.
Electronic Reading Room at http://
hearing identifying speakers, setting Connie M. Downs,
www.nrc.gov/reading-rm/adams.html.
forth the subject on which each Corporate Secretary, Overseas Private
Persons who do not have access to
ADAMS or who have problems participant will speak, and the time Investment Corporation.
accessing the documents in ADAMS allotted for each presentation. The [FR Doc. E8–7378 Filed 4–8–08; 8:45 am]
should contact the NRC PDR reference agenda will be available at the hearing. BILLING CODE 3210–01–P

staff by telephone at (800) 397–4209 or A written summary of the hearing will


(301) 415–4737 or by e-mail to be compiled, and such summary will be
pdr@nrc.gov. made available, upon written request to SECURITIES AND EXCHANGE
OPIC’s Corporate Secretary, at the cost COMMISSION
Dated this 4th day of April, 2008.
For the Nuclear Regulatory Commission. of reproduction.
Submission for OMB Review;
James T. Wiggins, Contact Person for Information: Comment Request
Deputy Director, Office of Nuclear Reactor Information on the hearing may be
obtained from Connie M. Downs at (202) Upon written request, copies available
Regulation.
336–8438, via facsimile at (202) 218– from: Securities and Exchange
[FR Doc. E8–7589 Filed 4–8–08; 8:45 am]
0136, or via e-mail at Commission, Office of Investor
BILLING CODE 7590–01–P Education and Advocacy,
connie.downs@opic.gov.
Washington, DC 20549–0213.
Dated: April 3, 2008.
Extension:
Connie M. Downs, Rule 27d–1 and Form N–27D–1, SEC File
OVERSEAS PRIVATE INVESTMENT
mstockstill on PROD1PC66 with NOTICES

OPIC Corporate Secretary. No. 270–499, OMB Control No. 3235–


CORPORATION 0560.
[FR Doc. E8–7377 Filed 4–8–08; 8:45 am]
April 15, 2008 Public Hearing BILLING CODE 3210–01–M Notice is hereby given that, pursuant
to the Paperwork Reduction Act of 1995
Time and Date: 2 p.m., Tuesday, (44 U.S.C. 3501 et seq.), the Securities
April 15, 2008. and Exchange Commission (the

VerDate Aug<31>2005 18:06 Apr 08, 2008 Jkt 214001 PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 E:\FR\FM\09APN1.SGM 09APN1

Вам также может понравиться