Вы находитесь на странице: 1из 3

A PROPOSED INDUSTRIAL PROCESSING PLANT

An export company has decided that its I-2 zoned property, with a Total Lot Area (TLA) of 3,600
square meters and located in an EPZA shall build an industrial processing plant.
The project site is a corner lot with a 60-meter wide frontage facing west. The project site
uniformly slopes at 2% towards the 30 meters wide street that is relatively flat and which has 5 meters
wide sidewalk (which includes 2 meters wide planting strip) at both sides.
To the north of the project site (as viewed from the main RROW) is a 16 meter wide RROW that
is also sloping towards the main RROW at 2% which has 2.4m wide sidewalk (with 0.5m wide planting
strip) at both sides. To the west side of the lot and across the east and north side of the project site are
also low-rise industrial facilities as prescribed in the deed restrictions of up to five (5) storeys only.
1. What is the allowable maximum building footprint (AMBF) for the project?
2. What is the allowable maximum building footprint (AMBF) for the project, if the building shall not
have a firewall?
3. What is the applicable percentage of site occupancy (PSO) for the project site?
4. What is the maximum impervious surface area (ISA) for the project? The answer should be in
square meters.
5. What is the applicable unpaved surface area (USA) for the project? The answer should be in
square meters.
6. For the project site, how much is the combined total maximum allowable ISA plus the minimum
USA (in square meters)?
7. What is the maximum gross floor area (GFA) for the project, if the building shall not have a
firewall?
8. Based on the NBCP and the allowable percentage of site occupancy (PSO), what shall be the total
gross floor area (TGFA) for the project, if the building shall not have a firewall?
9. Based on the maximum gross floor area (GFA), what shall be the total gross floor area (TGFA) for
the project?
10. Based on the allowable building height limit and the allowable maximum building footprint, what
shall be the allowable maximum volume of building (AMVB) for the project, if the building shall
not have a firewall?

18M RROW
5M

50M
30M RROW

60M

60M
8M

1.

47M

5M
5M

What is the allowable maximum building footprint (AMBF) for the project?
52 X 55 MTS. = 2,860 SQ.MTS.

2.

What is the allowable maximum building footprint (AMBF) for the project, if the building shall not

have a firewall?
47 X 50 MTS. = 2,350 SQ.MTS.
3.

What is the applicable percentage of site occupancy (PSO) for the project site?
3,600 SQ.MTS / 2,860 SQ.MTS = 0.7944 say 79.44% or 80%

4.

What is the maximum impervious surface area (ISA) for the project? The answer should be in

square meters.
5% of 3,600 = 180 SQ.MTS.
5.

What is the applicable unpaved surface area (USA) for the project? The answer should be in

square meters.
100 79.44 (PSO) = 20.56%
20.56 5 (ISA) = 15.56%
15.56% of 3,600 = 560.16 SQ.MTS.
6.

For the project site, how much is the combined total maximum allowable ISA plus the minimum

USA (in square meters)?


ISA + USA = TOSL
TOSL = TLA AMBF
3,600 2,860 = 740 SQ.MTS.
7.

What is the maximum gross floor area (GFA) for the project, if the building shall not have a

firewall?
GFA = TLA X FLARmax
3,600 x 3 = 10,800 SQ.MTS.

8.

Based on the NBCP and the allowable percentage of site occupancy (PSO), what shall be the total

gross floor area (TGFA) for the project, if the building shall not have a firewall?
TGFA = BHL X AMBF (no firewall)
5 floors x 2,350 = 11,750 SQ.MTS.
9.

Based on the maximum gross floor area (GFA), what shall be the total gross floor area (TGFA) for

the project?
TGFA = GFA X 1.5 (no firewall)
= 16,200 SQ.MTS.
10.

Based on the allowable building height limit and the allowable maximum building footprint, what

shall be the allowable maximum volume of building (AMVB) for the project, if the building shall not have
a firewall?
AMVB = BHL X AMBF (no firewall)
= 15 MTS. X 2,350 SQ.MTS.
= 35,250 SQ. MTS.