1 (5)
SITE ENGINEERING
DLS1262
SITE ID: ........................
Visit: .......................
Not correct
Infrastructure
Check point
Radio Site
GBT
RTT
ID/OD/POLE/WALL
INDOOR
Shelter
POLE
OUTDOOR
WALL
POLE
4
Equipment Room Floor
Space For
Equipments
(Sharing sites)
Floor
Levelled
grounding
Door
Sealing
ID LADDER
ID LADDER INSTALLED
Lighting
No. of fittings 2 2
Sockets operational
Earthing system
Antistatic Mat
Antistatic
Locking
NA
SPACE ON EXISTING LADDER
Operational
Earthing Bus
Bars
EP2
EP3
2 (5)
SITE ENGINEERING
11
PIU/ACDB
PIU/ACDB Installed
PIU/ACDB commissioned
12
Mains Incomer
Mains available
13
DC Power
Availability
DC Power Available
14
DG
DG installed
15
Air-conditioning
Installed
16
WFT
DG Commissioned
Tower
GBT
18
Type
19
Cable ladder
(OD)
No of Openings made
1
RTT
Tower Height 12 M
Tower Painting
Tower Type
20
Cable Ladder
lengths
8
Length of Vertcal ladder(above HCT till antenna mount)
mtrs.
21
Lightening
Protection
Lightening Rod
22
Aviation Light
Installation
in mtrs.
LA connected to Earthpit
COMMISSIONED
in
3 (5)
SITE ENGINEERING
23
Cable Inlet
24
Antenna Mount
25
GSM antenna
Mount hts.(as
per TND)
20
20
20
26
GSM antenna
Mount hts.
(existing)
20
20
27
MW Antenna
Mount ht.
Height of MW antennas
23
Height of MW antennas
23
MW Antenna
Mount ht.
(Existing)
29
GSM antenna
Azimuth(As per
TND)
120
240
30
GSM antenna
Azimuth
(existing)
120
240
31
MW Antenna
Azimuth(As per
TND)
112
32
MW Antenna
Azimuth
(Existing)
112
_________________________________________________________________________________
HCT Grouting is not done.
_________________________________________________________________________________
DG/PIU/SMPS Cabling is not done, DG not commissioned.
_________________________________________________________________________________
Access ladder for shelter is required.
_________________________________________________________________________________
Name:...
4 (5)
5 (5)
SITE ENGINEERING
Pls sketch whole Site Plan along with shelter/cage plan (including HCT routing)