13540 Federal Register / Vol. 73, No.

50 / Thursday, March 13, 2008 / Notices

DEPARTMENT OF ENERGY g. Filed Pursuant to: Federal Power available for inspection and
Act, 16 U.S.C. 791a–825r. reproduction at the address in item h
Federal Energy Regulatory h. Applicant Contact: Mr. Kenneth D. above.
Commission Bickner, Midriver Power L.L.C., 539 m. Individuals desiring to be included
[Docket No. OR07–5–000, Docket No. OR07–
Kimball Road, Iowa City, IA 52245 (319) on the Commission’s mailing list should
7–000, Docket No. OR07–18–000, Docket 337–5645. so indicate by writing to the Secretary
No. OR07–19–000, Docket No. OR07–22– i. FERC Contact: Patricia W. Gillis, of the Commission.
000] (202) 502–8735. n. Competing Preliminary Permit—
j. Deadline for filing comments, Anyone desiring to file a competing
ExxonMobil Oil Corporation v. Calnev protests, and motions to intervene: 60 application for preliminary permit for a
Pipe Line LLC; Tesoro Refining and days from the issuance date of this proposed project must submit the
Marketing Company v. Calnev Pipe notice. competing application itself, or a notice
Line LLC; America West Airlines, Inc. All documents (original and eight
of intent to file such an application, to
and U.S. Airways, Inc., Chevron copies) should be filed with: Kimberly
the Commission on or before the
Products Company, Continental D. Bose, Secretary, Federal Energy
specified comment date for the
Airlines, Inc., Northwest Airlines, Inc., Regulatory Commission, 888 First
particular application (see 18 CFR 4.36).
Southwest Airlines Co., and Valero Street, NE., Washington, DC 20426.
Submission of a timely notice of intent
Marketing and Supply Company v. Comments, protests, and interventions
allows an interested person to file the
Calnev Pipe Line LLC; ConocoPhillips may be filed electronically via the
competing preliminary permit
Company v. Calnev Pipe Line LLC; BP Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions application no later than 30 days after
West Coast Products LLC v. Calnev the specified comment date for the
Pipe Line LLC; Notice Permitting on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission particular application. A competing
Futher Answers preliminary permit application must
strongly encourages electronic filings.
March 6, 2008. Please include the project number conform with 18 CFR 4.30 and 4.36.
On March 3, 2008, Calnev Pipe Line (P–13100–000) on any comments or o. Competing Development
LLC (Calnev) filed a combined answer motions filed. Application—Any qualified
to the complaints listed in the caption The Commission’s Rules of Practice development applicant desiring to file a
of this order. Given the novelty of some and Procedure require all intervenors competing development application
of the issues, notice is hereby given that filing documents with the Commission must submit to the Commission, on or
the complainants may file answers to to serve a copy of that document on before a specified comment date for the
Calnev’s March 3, 2008 filing no later each person in the official service list particular application, either a
than March 18, 2008. Any factual for the project. Further, if an intervenor competing development application or a
assertions in those answers shall be files comments or documents with the notice of intent to file such an
supported by sworn affidavits. Commission relating to the merits of an application. Submission of a timely
issue that may affect the responsibilities notice of intent to file a development
Kimberly D. Bose, application allows an interested person
of a particular resource agency, they
Secretary. must also serve a copy of the document to file the competing application no
[FR Doc. E8–5030 Filed 3–12–08; 8:45 am] on that resource agency. later than 120 days after the specified
BILLING CODE 6717–01–P k. Description of Project: The comment date for the particular
proposed project would utilize the application. A competing license
existing U. S. Army Corps of Engineers’ application must conform with 18 CFR
DEPARTMENT OF ENERGY Coralville Lake Dam and would consist 4.30 and 4.36.
of: (1) Two 70-foot-long, 180-inch p. Notice of Intent—A notice of intent
Federal Energy Regulatory must specify the exact name, business
diameter proposed penstocks; (2) a
Commission address, and telephone number of the
proposed powerhouse containing two
[Project No. 13100–000] generating units with a total installed prospective applicant, and must include
capacity of 5.7-megawatts; (3) a an unequivocal statement of intent to
Midriver Power L.L.C.; Notice of proposed transmission line; and (4) submit, if such an application may be
Application Accepted for Filing and appurtenant facilities. The proposed filed, either a preliminary permit
Soliciting Comments, Motions To project would have an estimated annual application or a development
Intervene, and Protests generation of 50-gigawatts and would be application (specify which type of
sold to a local utility. application). A notice of intent must be
March 6, 2008.
l. Location of Application: A copy of served on the applicant(s) named in this
Take notice that the following
the application is available for public notice.
hydroelectric applications have been
inspection and reproduction at the q. Proposed Scope of Studies Under
filed with the Commission and are
Commission in the Public Reference Permit—A preliminary permit, if issued,
available for public inspection:
a. Type of Application: Preliminary Room, located at 888 First Street, NE., does not authorize construction. The
Permit. Room 2A, Washington, DC 20426, or by term of the proposed preliminary permit
b. Project No.: P–13100–000. calling (202) 502–8371. This filing may would be 36 months. The work
c. Date Filed: January 23, 2008. also be viewed on the Commission’s proposed under the preliminary permit
d. Applicant: Midriver Power L.L.C. Web site at http://www.ferc.gov using would include economic analysis,
e. Name of the Project: Coralville Lake the ‘‘eLibrary’’ link. Enter the docket preparation of preliminary engineering
mstockstill on PROD1PC66 with NOTICES

Hydropower Project. number excluding the last three digits in plans, and a study of environmental
f. Location: The project would be the docket number field to access the impacts. Based on the results of these
located on the Iowa River in Johnson document. For assistance, call toll-free studies, the Applicant would decide
County, Iowa. The Coralville Lake Dam 1–866–208–3676 or e-mail whether to proceed with the preparation
is owned and maintained by the U.S. FERCOnlineSupport@ferc.gov. For TTY, of a development application to
Army Corps of Engineers. call (202) 502–8659. A copy is also construct and operate the project.

VerDate Aug<31>2005 16:19 Mar 12, 2008 Jkt 214001 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 E:\FR\FM\13MRN1.SGM 13MRN1