Вы находитесь на странице: 1из 2

12780 Federal Register / Vol. 73, No.

47 / Monday, March 10, 2008 / Notices

The proposed action is in accordance process for ANO–2 reloads with For further details with respect to the
with the licensee’s application dated Optimized ZIRLOTM. proposed action, see the licensee’s letter
April 24, 2007 (Agencywide Documents If the exemption is issued details of dated April 24, 2007. Documents may
Access and Management System the staff’s safety evaluation will be be examined, and/or copied for a fee, at
(ADAMS) Accession No. provided in the exemption. the NRC’s Public Document Room
ML071220267). The proposed action will not (PDR), located at One White Flint North,
significantly increase the probability or Public File Area O1 F21, 11555
The Need for the Proposed Action
consequences of accidents. No changes Rockville Pike (first floor), Rockville,
The proposed action is needed so that are being made in the types of effluents Maryland. Publicly available records
Entergy can use Optimized ZIRLOTM, an that may be released off site. There is no will be accessible electronically from
advanced alloy for fuel rod cladding and significant increase in the amount of the Agencywide Documents Access and
other assembly structural components at any effluent released off site. There is no Management System (ADAMS) Public
the ANO–2. significant increase in occupational or Electronic Reading Room on the Internet
Section 50.46 of 10 CFR and 10 CFR public radiation exposure. Therefore, at the NRC Web site, http://
Part 50, Appendix K, make no there are no significant radiological www.nrc.gov/reading-rm/adams.html.
provisions for use of fuel rods clad in a environmental impacts associated with Persons who do not have access to
material other than zircaloy or ZIRLO. the proposed action. ADAMS or who encounter problems in
Since the chemical composition of the With regard to potential non- accessing the documents located in
Optimized ZIRLOTM alloy differs from radiological impacts, the proposed ADAMS should contact the NRC PDR
the specifications for zircaloy or ZIRLO, action does not have a potential to affect Reference staff by telephone at 1–800–
a plant-specific exemption is required to any historic sites. It does not affect non- 397–4209 or 301–415–4737, or send an
allow the use of the Optimized radiological plant effluents and has no e-mail to pdr@nrc.gov.
ZIRLOTM alloy as a cladding material or other environmental impact. Therefore,
in other assembly structural Dated at Rockville, Maryland, this 3rd day
there are no significant non-radiological of March, 2008.
components at the ANO–2. environmental impacts associated with
For the Nuclear Regulatory Commission.
Environmental Impacts of the Proposed the proposed action.
Accordingly, the NRC concludes that Alan B. Wang,
Action
there are no significant environmental Project Manager, Plant Licensing Branch IV,
The underlying purposes of 10 CFR Division of Operating Reactor Licensing,
impacts associated with the proposed
50.46 and 10 CFR Part 50, Appendix K, Office of Nuclear Reactor Regulation.
action.
are to ensure that facilities have [FR Doc. E8–4691 Filed 3–7–08; 8:45 am]
adequate acceptance criteria for the Environmental Impacts of the BILLING CODE 7590–01–P
emergency core cooling system (ECCS), Alternatives to the Proposed Action
and to ensure that cladding oxidation As an alternative to the proposed
and hydrogen generation are action, the staff considered denial of the NUCLEAR REGULATORY
appropriately limited during a loss-of- proposed action (i.e., the ‘‘no-action’’ COMMISSION
coolant accident (LOCA) and alternative). Denial of the application [Docket No. 52–021]
conservatively accounted for in the would result in no change in current
ECCS evaluation model, respectively. environmental impacts. The Mitsubishi Heavy Industries, Ltd.;
Neither 10 CFR 50.46 nor 10 CFR Part environmental impacts of the proposed Acceptance for Docketing of an
50, Appendix K, explicitly allows the action and the alternative action are Application for Standard Design
use of Optimized ZIRLOTM as a fuel rod similar. Certification of the US–APWR
cladding material or for other assembly
structural components. Topical Report Alternative Use of Resources On December 31, 2007, the U.S.
WCAP–12610–P–A and CENPD–404–P– The action does not involve the use of Nuclear Regulatory Commission (NRC,
A, Addendum 1–A, ‘‘Optimized any different resources than those the Commission) received a design
ZIRLOTM,’’ which was approved by the previously considered in the Final certification application from
NRC in July 2006 (ADAMS Accession Environmental Statement for the Mitsubishi Heavy Industries (MHI), Ltd.,
No. ML062080569), demonstrated that ANO–2 dated June 16, 1977. dated December 31, 2007, filed pursuant
the effectiveness of the ECCS will not be to Section 103 of the Atomic Energy Act
affected by a change from zircaloy to Agencies and Persons Consulted and Subpart B, ‘‘Standard Design
Optimized ZIRLOTM. In addition, as a In accordance with its stated policy, Certification,’’ of Title 10 of the Code of
condition for the approval of WCAP– on January 27, 2008, the staff consulted Federal Regulations (10 CFR) Part 52, al
12610–P–A and CENPD–404–P–A, with the Arkansas State official, Mr. Regulations (10 CFR) Part 52, ‘‘Licenses,
Addendum 1–A, additional data was Bernard Beville of the Department of Certifications, and Approvals for
provided by Westinghouse by letters Radiation Control, regarding the Nuclear Power Plants.’’ A notice of
dated January 4, and November 6, 2007, environmental impact of the proposed receipt and availability of this
and February 5, 2008, that demonstrated action. The State official had no application was previously published in
that the Baker-Just equation (used in the comments. the Federal Register (73 FR 3495) on
ECCS evaluation model to determine the January 18, 2008.
rate of energy release, cladding Finding of No Significant Impact The NRC staff has determined that
oxidation, and hydrogen generation) is On the basis of the environmental MHI has submitted information in
conservative in all post-LOCA scenarios assessment, the NRC concludes that the accordance with 10 CFR Part 2, ‘‘Rules
with respect to Optimized ZIRLOTM proposed action will not have a of Practice for Domestic Licensing
pwalker on PROD1PC71 with NOTICES

advanced alloy as a fuel rod cladding significant effect on the quality of the Proceedings and Issuance of Orders,’’
material or in other assembly structural human environment. Accordingly, the and 10 CFR Part 52 that is acceptable for
components. The licensee currently NRC has determined not to prepare an docketing. The docket number
uses and will continue to use NRC- environmental impact statement for the established for this application is 52–
approved methods for the reload design proposed action. 021.

VerDate Aug<31>2005 16:39 Mar 07, 2008 Jkt 214001 PO 00000 Frm 00079 Fmt 4703 Sfmt 4703 E:\FR\FM\10MRN1.SGM 10MRN1
Federal Register / Vol. 73, No. 47 / Monday, March 10, 2008 / Notices 12781

The NRC staff will perform a detailed NUCLEAR REGULATORY The proposed amendment would
technical review of the design COMMISSION have revised the refueling water storage
certification application. Docketing of tank low-low level alarm setpoint.
the design certification application does [Docket Nos. 110–05711 (Import); 110– The Commission had previously
not preclude the NRC from requesting 05710 (Export)] issued a Notice of Consideration of
additional information from the Issuance of Amendment published in
Requests for Licenses To Import and the Federal Register on December 4,
applicant as the review proceeds, nor
Export Radioactive Waste; Extension 2007 (72 FR 68212). However, by letter
does it predict whether the Commission
of Time for Comment and Intervention dated February 8, 2008, the licensee
will grant or deny the application. A
notice relating to the rulemaking On February 11, 2008, the withdrew the proposed change.
pursuant to 10 CFR 52.51 for design Commission issued notices on a Request For further details with respect to this
certification, including provisions for for a License to Import Radioactive action, see the application for
Waste and a Request for a License to amendment dated October 24, 2007, and
participation of the public and other
Export Radioactive Waste. 73 FR 7764– the licensee’s letter dated February 8,
parties, will be published in the future.
7766. The import/export applications 2008, which withdrew the application
The US–APWR design is an for a license amendment. Documents
were filed by EnergySolutions, Inc. The
approximately 1,700 megawatts electric, may be examined, and/or copied for a
notices stated that any written
four loop, advanced pressurized water comments and requests for hearing or fee, at the NRC’s Public Document
reactor (APWR). MHI developed the intervention on the import/export Room (PDR), located at One White Flint
US–APWR based on technologies for a applications should be submitted within North, Public File Area O1 F21, 11555
1,538 megawatts electric APWR planned 30 days after publication of the notices Rockville Pike (first floor), Rockville,
for use in Japan. The US–APWR is in the Federal Register. Maryland. Publicly available records
based on the latest technologies to In response to a number of requests will be accessible electronically from
improve plant efficiency, reduce plant for an extension of this time period, the the Agencywide Documents Access and
building volume, and provide a 24- Commission is issuing a Notice Management Systems (ADAMS) Public
month fuel cycle. The US–APWR Extending the Period of Time to Electronic Reading Room on the internet
application includes the entire power Comment and Request a Hearing or at the NRC Web site, http://
generation complex, except those Intervention on the import/export www.nrc.gov/reading-rm.html. Persons
elements and features considered site- applications filed by EnergySolutions, who do not have access to ADAMS or
specific. Inc. Written comments and a request for who encounter problems in accessing
a hearing or petition for leave to the documents located in ADAMS
Documents may be examined, and/or should contact the NRC PDR Reference
copied for a fee, at the NRC’s Public intervene may be filed by June 10, 2008.
Requests for hearing must be filed in staff by telephone at 1–800–397–4209,
Document Room (PDR), located at One or 301–415–4737 or by e-mail to
accordance with the procedures set
White Flint North, Public File Area O1 pdr@nrc.gov.
forth in 10 CFR part 110, subpart H.
F21, 11555 Rockville Pike (first floor),
This Notice is issued pursuant to my Dated at Rockville, Maryland, this 28th day
Rockville, Maryland 20852, and will be authority under 10 CFR 110.88. of February 2008.
accessible electronically through the For the Nuclear Regulatory Commission.
Agencywide Documents Access and Dated at Rockville, Maryland this 4th day
of March, 2008. John P. Boska,
Management System (ADAMS) Public
For the Nuclear Regulatory Commission. Senior Project Manager, Plant Licensing
Electronic Reading Room link at the Branch I–1, Division of Operating Reactor
NRC Web site http://www.nrc.gov/ Annette L. Vietti-Cook,
Licensing, Office of Nuclear Reactor
reading-rm/adams.html. Persons who Secretary of the Commission. Regulation.
do not have access to ADAMS or who [FR Doc. E8–4752 Filed 3–7–08; 8:45 am] [FR Doc. E8–4689 Filed 3–7–08; 8:45 am]
encounter problems in accessing BILLING CODE 7590–01–P
BILLING CODE 7590–01–P
documents located in ADAMS should
contact the NRC PDR Reference staff by
NUCLEAR REGULATORY NUCLEAR REGULATORY
telephone at 1–800–4209, 301–415–
COMMISSION COMMISSION
4737, or by e-mail to pdr@nrc.gov. The
application is also available at http:// [Docket No. 50–286] [Docket No. 50–82]
www.nrc.gov/reactors/new-licensing/
design-cert.html. Entergy Nuclear Indian Point 3, LLC; Wolf Creek Nuclear Operating
Dated at Rockville, Maryland, this 29th day Entergy Nuclear Operations, Inc.; Corporation; Notice of Withdrawal of
of February 2008. Notice of Withdrawal of Application for Application for Amendment to Facility
Amendment to Facility Operating Operating License
For the Nuclear Regulatory Commission.
License No. DPR–64, Indian Point
Jeffrey A. Ciocco, Nuclear Generating Unit No. 3 The U.S. Nuclear Regulatory
Sr. Project Manager, US–APWR Projects Commission (the Commission) has
Branch, Division of New Reactor Licensing, The U.S. Nuclear Regulatory granted the request of Wolf Creek
Office of New Reactors. Commission (the Commission) has Nuclear Operating Corporation (the
[FR Doc. E8–4718 Filed 3–7–08; 8:45 am] granted the request of Entergy Nuclear licensee) to withdraw its application
BILLING CODE 7590–01–P
Operations, Inc. (the licensee), to dated February 21, 2006, with
withdraw its October 24, 2007, supplemental letters dated May 3 and
pwalker on PROD1PC71 with NOTICES

application for proposed amendment to September 27, 2007, and January 25,
Facility Operating License No. DPR–64 2008, for proposed amendment to
for Indian Point Nuclear Generating Facility Operating License No. NPF–42
Unit No. 3, located in Westchester for the Wolf Creek Generating Station,
County, New York. located in Coffey County, Kansas.

VerDate Aug<31>2005 16:39 Mar 07, 2008 Jkt 214001 PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 E:\FR\FM\10MRN1.SGM 10MRN1