10302 Federal Register / Vol. 73, No.

38 / Tuesday, February 26, 2008 / Notices

action which is currently delineated in 1 and 2 Operating License and Nos. NPF–9 and NPF–17 for operation
administrative control TS 5.7.1. TS Technical Specifications necessary to of the McGuire Nuclear Station, Units 1
Section 1.3, Limiting Safety System implement the increased power level. and 2, located in Mecklenburg County,
Settings, was relocated to the currently Date of issuance: January 30, 2008. North Carolina.
unused TS Section 2.13 to be more Effective date: As of the date of The proposed amendment would
consistent with the content of the CE issuance and to be implemented in revise the Catawba Nuclear Station,
STS (i.e., the LSSS will be located in the accordance with the issued License Units 1 and 2, and the McGuire Nuclear
Limiting Conditions for Operation Conditions. Station, Units 1 and 2, Updated Final
(LCO) section of the FCS TS which is Amendment Nos.: 246 and 224. Safety Analysis Reports by requiring an
similar to the LCO/Surveillance Facility Operating License Nos. inspection of each ice condenser within
Requirements Section 3.0 of the STS). NPF–14 and NPF–22: The amendments 24 hours of experiencing a seismic event
As noted above, the administrative revised the License and Technical greater than or equal to an operating
control in TS 5.7.1, Safety Limit Specifications. basis earthquake within the five (5)
Violation, is relocated. Also, Date of initial notice in Federal week period after ice basket
administrative control TS 5.9.5, Core Register: March 13, 2007 (72 FR replenishment has been completed to
Operating Limits Report (COLR), 11392). The supplements dated October confirm that adverse ice fallout has not
item a., is revised to add TS 2.13, RPS 25, December 4 and 26, 2006, February occurred.
Limiting Safety System Settings, Table 13, March 14 and 22, April 13, 17, 23, Before issuance of the proposed
2–11, Items 6, 8, and 9, to the list of 26, and 27, May 3, 9, 14, and 21, June license amendment, the Commission
items that shall be documented in the 1, 4, 8, 14, 20, and 27, July 6, 12, 13, will have made findings required by the
COLR. The TS Table of Contents (TOC) 30, and 31, August 3, 13, 15, and 28, Atomic Energy Act of 1954, as amended
is also updated to reflect the deletion September 19, October 5, November 30, (the Act), and the Commission’s
and subsequent renumbering of Section December 10, 2007, and January 9, 24, regulations.
1.3 and Table 1–1 to TS 2.13 and Table and 29, 2008, provided additional The Commission has made a
2–11, respectively. The TOC is also information that clarified the proposed determination that the
updated to delineate the new TS application, did not expand the scope of amendment request involves no
subsections 1.1.1 and 1.1.2, provide the the application as originally noticed, significant hazards consideration. Under
revised titles for TS 1.0, 1.1, 1.2, and and did not change the staff’s original the Commission’s regulations in Title 10
2.13, and to reflect TS 5.7.1 as ‘‘Not proposed no significant hazards of the Code of Federal Regulations (10
used.’’ consideration determination. CFR), Section 50.92, this means that
Date of issuance: February 4, 2008. The Commission’s related evaluation
Effective date: As of its date of operation of the facility in accordance
of the amendments is contained in a with the proposed amendment would
issuance and prior to startup from the Safety Evaluation dated January 30,
2008 refueling outage. not (1) involve a significant increase in
2008. the probability or consequences of an
Amendment No.: 252. No significant hazards consideration
Renewed Facility Operating License accident previously evaluated; or (2)
comments received: No. create the possibility of a new or
No. DPR–40: The amendment revised
the Technical Specifications. Dated at Rockville, Maryland, this 15th day different kind of accident from any
Date of initial notice in Federal of February 2008. accident previously evaluated; or (3)
Register: November 6, 2007 (72 FR For The Nuclear Regulatory Commission. involve a significant reduction in a
62690). The Commission’s related Catherine Haney, margin of safety. As required by 10 CFR
evaluation of the amendment is Director, Division of Operating Reactor 50.91(a), the licensee has provided its
contained in a safety evaluation dated Licensing, Office of Nuclear Reactor analysis of the issue of no significant
February 4, 2008. Regulation. hazards consideration, which is
No significant hazards consideration [FR Doc. E8–3481 Filed 2–25–08; 8:45 am] presented below:
comments received: No. BILLING CODE 7590–01–P A. Does the proposed amendment involve
PPL Susquehanna, LLC, Docket No. 50– a significant increase in the probability or
consequences of an accident previously
387 and 50–388, Susquehanna Steam NUCLEAR REGULATORY evaluated?
Electric Station, Units 1 and 2 (SSES 1 COMMISSION Response: No.
and 2), Luzerne County, Pennsylvania The analyzed accidents of consideration in
Date of application for amendments: [Docket Nos. 50–413, 50–414, 50–369 and regard to changes potentially affecting the ice
50–370] condenser are a loss of coolant accident and
October 11, 2007, as supplemented on
October 25, December 4 and 26, 2006, a steam or feedwater line break inside
Duke Power Company LLC, et al.; Containment. The ice condenser is an
February 13, March 14 and 22, April 13, Notice of Consideration of Issuance of accident mitigator and is not postulated as
17, 23, 26, and 27, May 3, 9, 14, and 21, Amendments to Facility Operating being the initiator of a LOCA [loss-coolant-
June 1, 4, 8, 14, 20, and 27, July 6, 12, Licenses, Proposed No Significant accident] or HELB [high-energy line break].
13, 30, and 31, August 3, 13, 15, and 28, Hazards Consideration Determination, The ice condenser is structurally designed to
September 19, October 5, November 30, and Opportunity for a Hearing withstand a Safe Shutdown Earthquake plus
December 10, 2007, and January 9, 24, a Design Basis Accident and does not
and 29, 2008. The U.S. Nuclear Regulatory interconnect or interact with any systems
Brief description of amendments: The Commission (the Commission) is that interconnect or interact with the Reactor
amendments increase the SSES 1 and 2 considering issuance of an amendment Coolant, Main Steam or Feedwater systems.
mstockstill on PROD1PC66 with NOTICES

licensed thermal power to 3952 Mega- to Facility Operating License Nos. NPF– Because the proposed changes do not result
in, or require any physical change to the ice
watts thermal (MWt), which is 20% 35 and NPF–52 issued to Duke Power condenser that could introduce an
above the original rated thermal power Company LLC, et al., for operation of interaction with the Reactor Coolant, Main
(RTP) of 3293 MWt, and approximately the Catawba Nuclear Station, Units 1 Steam or Feedwater systems, there can be no
13% above the current RTP of 3489 and 2, located in York County, South change in the probability of an accident
MWt. The amendments revise the SSES Carolina, and Facility Operating License previously evaluated.

VerDate Aug<31>2005 19:29 Feb 25, 2008 Jkt 214001 PO 00000 Frm 00083 Fmt 4703 Sfmt 4703 E:\FR\FM\26FEN1.SGM 26FEN1
Federal Register / Vol. 73, No. 38 / Tuesday, February 26, 2008 / Notices 10303

Under the current licensing basis, the ice mechanisms. Therefore, there can be no new The NRC staff has reviewed the
condenser ice baskets would be considered or different accidents created from those licensee’s analysis and, based on this
fully fused prior to power ascension and the previously identified and evaluated. review, it appears that the three
ice condenser would perform its accident C. Does the proposed amendment involve standards of 10 CFR 50.92(c) are
mitigation function even if a safe shutdown a significant reduction in the margin of
seismic event occurred coincident with or satisfied. Therefore, the NRC staff
safety?
just preceding the accident. Under the Response: No.
proposes to determine that the
proposed change, there is some finite Margin of safety is related to the amendment request involves no
probability that, within 24 hours following a confidence in the ability of the fission significant hazards consideration.
seismic disturbance, a LOCA or HELB in product barriers to perform their design The Commission is seeking public
Containment could occur within five weeks functions during and following an accident comments on this proposed
of the completion of ice basket situation. These barriers include the fuel determination. Any comments received
replenishment. However, several factors cladding, the Reactor Coolant system, and the within 30 days after the date of
provide defense-in-depth and tend to Containment system. The performance of the publication of this notice will be
mitigate the potential consequences of the fuel cladding and the Reactor Coolant system considered in making any final
proposed change. will not be impacted by the proposed change.
Design basis accidents are not assumed to determination.
The requirement to inspect the ice Normally, the Commission will not
occur simultaneously with a seismic event. condensers within 24 hours of experiencing
Therefore, the coincident occurrence of a issue the amendment until the
seismic activity greater than or equal to an
LOCA or HELB with a seismic event is expiration of 60 days after the date of
OBE during the five (5) week period
strictly a function of the combined following the completion of ice basket
publication of this notice. The
probability of the occurrence of independent
replenishment will confirm that the ice Commission may issue the license
events, which in this case is very low. Based amendment before expiration of the 60-
condenser lower inlet doors are capable of
on the Probabilistic Risk Assessment model day period provided that its final
opening. This inspection will confirm that
and seismic hazard analysis, the combined determination is that the amendment
the ice condenser doors remain fully capable
probability of occurrence of a seismic
of performing their intended safety function involves no significant hazards
disturbance greater than or equal to an OBE
during the 5 week period following ice
under credible circumstances. consideration. In addition, the
The inherent redundancy of flow paths Commission may issue the amendment
replenishment coincident with or
into the ice condenser provides reasonable prior to the expiration of the 30-day
subsequently followed by a LOCA or HELB
assurance that it would perform its function comment period should circumstances
during the time required to perform the
even if some lower inlet doors were blocked change during the 30-day comment
proposed inspection (24 hours) and if
closed. As such, the ice condenser has
required by Technical Specifications, period such that failure to act in a
complete Unit shutdown (37 hours), is less reasonable assurance of performing its
intended function during the highly unlikely timely way would result, for example,
than 2.2E–09 for McGuire and Catawba. This in derating or shutdown of the facility.
probability is well below the threshold that scenario in which a postulated accident
(LOCA or HELB) occurs coincident with or Should the Commission take action
is typically considered credible.
subsequently following a seismic event. prior to the expiration of either the
Even if ice were to fall from ice baskets
during a seismic event occurring coincident The proposed change affects the assumed comment period or the notice period, it
with or subsequently followed by an timing of a postulated seismic and design will publish in the Federal Register a
accident, the ice condenser would be basis accident applied to the ice condenser notice of issuance. Should the
expected to perform its intended safety and provides an alternate methodology in Commission make a final No Significant
function. The design of the lower inlet doors confirming the ice condenser lower inlet Hazards Consideration Determination,
is such that complete blockage of flow into doors are capable of opening. As previously any hearing will take place after
the ice condenser is not credible during a discussed, the combined probability of
issuance. The Commission expects that
LOCA or HELB. The inherent redundancy of occurrence of a LOCA or HELB and a seismic
disturbance greater than or equal to an OBE
the need to take this action will occur
flow paths into the ice condenser provide very infrequently.
reasonable assurance that it would perform [operating basis earthquake] during the
‘‘period of potential exposure’’ is less than Written comments may be submitted
its function even if some lower inlet doors
were blocked closed. 2.2E–09 for McGuire and Catawba. This by mail to the Chief, Rulemaking,
Based on the above, the proposed changes probability is well below the threshold that Directives and Editing Branch, Division
do not involve a significant increase in the is considered credible. of Administrative Services, Office of
probability or consequences of an accident Therefore, the proposed change does not Administration, U.S. Nuclear Regulatory
previously evaluated. The ice condenser is involve a significant reduction in the margin Commission, Washington, DC 20555–
expected to perform its intended safety of safety. The McGuire and Catawba ice 0001, and should cite the publication
function under all circumstances following a condensers will perform their intended safety date and page number of this Federal
LOCA or HELB in Containment. function under credible circumstances.
Register notice. Written comments may
B. Does the proposed amendment create The changes proposed in this LAR do not
make any physical alteration to the ice
also be delivered to Room 6D59, Two
the possibility of a new or different kind of
accident from any accident previously condensers, nor does it affect the required White Flint North, 11545 Rockville
evaluated? functional capability of the ice condenser in Pike, Rockville, Maryland, from 7:30
Response: No. any way. The intent of the proposed change a.m. to 4:15 p.m. Federal workdays.
The proposed change affects the assumed to the UFSARs is to eliminate an overly Documents may be examined, and/or
timing of a postulated seismic and design restrictive waiting period prior to Unit ascent copied for a fee, at the NRC’s Public
basis accident applied to the ice condenser to power operations following the Document Room (PDR), located at One
and provides an alternate methodology to completion of ice basket replenishment. The White Flint North, Public File Area
confirm the ice condenser lower inlet doors required inspection of the ice condenser O1 F21, 11555 Rockville Pike (first
are capable of opening. As previously following a seismic event greater than or floor), Rockville, Maryland.
discussed, the ice condenser is not equal to an OBE will confirm that the ice
The filing of requests for hearing and
condenser lower inlet doors will continue to
mstockstill on PROD1PC66 with NOTICES

postulated as an initiator of any design basis


accident. The proposed change does not fully perform their safety function as
petitions for leave to intervene is
impact any plant system, structure or assumed in the McGuire and Catawba safety discussed below.
component that is an accident initiator. The analyses. Within 60 days after the date of
proposed change does not involve any Thus, it can be concluded that the publication of this notice, the person(s)
hardware changes to the ice condenser or proposed change does not involve a may file a request for a hearing with
other changes that could create new accident significant reduction in the margin of safety. respect to issuance of the amendment to

VerDate Aug<31>2005 19:29 Feb 25, 2008 Jkt 214001 PO 00000 Frm 00084 Fmt 4703 Sfmt 4703 E:\FR\FM\26FEN1.SGM 26FEN1
10304 Federal Register / Vol. 73, No. 38 / Tuesday, February 26, 2008 / Notices

the subject facility operating license and statement of the alleged facts or expert participant (or its counsel or
any person(s) whose interest may be opinion which support the contention representative) to digitally sign
affected by this proceeding and who and on which the petitioner intends to documents and access the E-Submittal
wishes to participate as a party in the rely in proving the contention at the server for any proceeding in which it is
proceeding must file a written request hearing. The petitioner/requestor must participating; and/or (2) creation of an
via electronic submission through the also provide references to those specific electronic docket for the proceeding
NRC E-filing system for a hearing and a sources and documents of which the (even in instances in which the
petition for leave to intervene. Requests petitioner is aware and on which the petitioner/requestor (or its counsel or
for a hearing and a petition for leave to petitioner intends to rely to establish representative) already holds an NRC-
intervene shall be filed in accordance those facts or expert opinion. The issued digital ID certificate). Each
with the Commission’s ‘‘Rules of petition must include sufficient petitioner/requestor will need to
Practice for Domestic Licensing information to show that a genuine download the Workplace Forms
Proceedings’’ in 10 CFR Part 2. dispute exists with the applicant on a ViewerTM to access the Electronic
Interested person(s) should consult a material issue of law or fact. Information Exchange (EIE), a
current copy of 10 CFR 2.309, which is Contentions shall be limited to matters component of the E-Filing system.
available at the Commission’s PDR, within the scope of the amendment The Workplace Forms ViewerTM is
located at One White Flint North, Public under consideration. The contention free and is available at http://
File Area O1F21, 11555 Rockville Pike must be one which, if proven, would www.nrc.gov/site-help/e-submittals/
(first floor), Rockville, Maryland. entitle the petitioner to relief. A install-viewer.html. Information about
Publicly available records will be petitioner/requestor who fails to satisfy applying for a digital ID certificate is
accessible from the Agencywide these requirements with respect to at available on NRC’s public Web site at
Documents Access and Management least one contention will not be http://www.nrc.gov/site-help/e-
System’s (ADAMS) Public Electronic permitted to participate as a party. submittals/apply-certificates.html. Once
Reading Room on the Internet at the Those permitted to intervene become a petitioner/requestor has obtained a
NRC Web site, http://www.nrc.gov/ parties to the proceeding, subject to any digital ID certificate, had a docket
reading-rm/doc-collections/cfr/. If a limitations in the order granting leave to created, and downloaded the EIE
request for a hearing or petition for intervene, and have the opportunity to viewer, it can then submit a request for
leave to intervene is filed by the above participate fully in the conduct of the hearing or petition for leave to
date, the Commission or a presiding hearing. intervene. Submissions should be in
officer designated by the Commission or If a hearing is requested, the Portable Document Format (PDF) in
by the Chief Administrative Judge of the Commission will make a final accordance with NRC guidance
Atomic Safety and Licensing Board determination on the issue of no available on the NRC public Web site at
Panel, will rule on the request and/or significant hazards consideration. The http://www.nrc.gov/site-help/e-
petition; and the Secretary or the Chief final determination will serve to decide submittals.html. A filing is considered
Administrative Judge of the Atomic when the hearing is held. If the final complete at the time the filer submits its
Safety and Licensing Board will issue a determination is that the amendment documents through EIE. To be timely,
notice of a hearing or an appropriate request involves no significant hazards an electronic filing must be submitted to
order. consideration, the Commission may the EIE system no later than 11:59 p.m.
As required by 10 CFR 2.309, a issue the amendment and make it Eastern Time on the due date. Upon
petition for leave to intervene shall set immediately effective, notwithstanding receipt of a transmission, the E-Filing
forth with particularity the interest of the request for a hearing. Any hearing system time-stamps the document and
the petitioner in the proceeding, and held would take place after issuance of sends the submitter an e-mail notice
how that interest may be affected by the the amendment. If the final confirming receipt of the document. The
results of the proceeding. The petition determination is that the amendment EIE system also distributes an e-mail
should specifically explain the reasons request involves a significant hazards notice that provides access to the
why intervention should be permitted consideration, any hearing held would document to the NRC Office of the
with particular reference to the take place before the issuance of any General Counsel and any others who
following general requirements: (1) The amendment. have advised the Office of the Secretary
name, address and telephone number of A request for hearing or a petition for that they wish to participate in the
the requestor or petitioner; (2) the leave to intervene must be filed in proceeding, so that the filer need not
nature of the requestor’s/petitioner’s accordance with the NRC E-Filing rule, serve the documents on those
right under the Act to be made a party which the NRC promulgated on August participants separately. Therefore,
to the proceeding; (3) the nature and 28, 2007 (72 FR 49139). The E-Filing applicants and other participants (or
extent of the requestor’s/petitioner’s process requires participants to submit their counsel or representative) must
property, financial, or other interest in and serve documents over the internet apply for and receive a digital ID
the proceeding; and (4) the possible or in some cases to mail copies on certificate before a hearing request/
effect of any decision or order which electronic storage media. Participants petition to intervene is filed so that they
may be entered in the proceeding on the may not submit paper copies of their can obtain access to the document via
requestors/petitioner’s interest. The filings unless they seek a waiver in the E-Filing system.
petition must also identify the specific accordance with the procedures A person filing electronically may
contentions which the petitioner/ described below. seek assistance through the ‘‘Contact
requestor seeks to have litigated at the To comply with the procedural Us’’ link located on the NRC Web site
proceeding. requirements of E-Filing, at least five (5) at http://www.nrc.gov/site-help/e-
mstockstill on PROD1PC66 with NOTICES

Each contention must consist of a days prior to the filing deadline, the submittals.html or by calling the NRC
specific statement of the issue of law or petitioner/requestor must contact the technical help line, which is available
fact to be raised or controverted. In Office of the Secretary by e-mail at between 8:30 a.m. and 4:15 p.m.,
addition, the petitioner/requestor shall HEARINGDOCKET@NRC.GOV, or by Eastern Time, Monday through Friday.
provide a brief explanation of the bases calling (301) 415–1677, to request (1) a The help line number is (800) 397–4209
for the contention and a concise digital ID certificate, which allows the or locally, (301) 415–4737. Participants

VerDate Aug<31>2005 19:29 Feb 25, 2008 Jkt 214001 PO 00000 Frm 00085 Fmt 4703 Sfmt 4703 E:\FR\FM\26FEN1.SGM 26FEN1
Federal Register / Vol. 73, No. 38 / Tuesday, February 26, 2008 / Notices 10305

who believe that they have a good cause Rockville, Maryland. Publicly available interim ARC that requires full-length
for not submitting documents records will be accessible electronically inspection of the tubes within the
electronically must file a motion, in from the Agencywide Documents tubesheet but does not require plugging
accordance with 10 CFR 2.302(g), with Access and Management System’s tubes if any axial or circumferential
their initial paper filing requesting (ADAMS) Public Electronic Reading cracking observed in the region greater
authorization to continue to submit Room on the Internet at the NRC Web than 17 inches below the top of the
documents in paper format. Such filings site, http://www.nrc.gov/reading-rm/ tubesheet (TTS) is less than a value
must be submitted by: adams.html. Persons who do not have sufficient to permit the remaining
(1) First class mail addressed to the access to ADAMS or who encounter circumferential ligament to transmit the
Office of the Secretary of the problems in accessing the documents limiting axial loads. These amendments
Commission, U.S. Nuclear Regulatory located in ADAMS, should contact the are required to preclude unnecessary
Commission, Washington, DC 20555– NRC PDR Reference staff by telephone plugging while still maintaining
0001, Attention: Rulemaking and at 1–800–397–4209, 301–415–4737, or structural and leakage integrity. These
Adjudications Staff; or (2) courier, by e-mail to pdr@nrc.gov. amendments also revise TS 5.6.10,
express mail, or expedited delivery Dated at Rockville, Maryland, this 20th day
‘‘Steam Generator Tube Inspection
service to the Office of the Secretary, of February 2008. Report,’’ where three new reporting
Sixteenth Floor, One White Flint North, For the Nuclear Regulatory Commission.
requirements are proposed to be added
11555 Rockville, Pike, Rockville, to the existing seven requirements. For
Maryland, 20852, Attention: John F. Stang, TS 5.5.9, the amendments would
Rulemaking and Adjudications Staff. Project Manager, Plant Licensing Branch II– replace the existing ARC in TS 5.5.9.c.1
Participants filing a document in this 1, Division of Operating Reactor Licensing, for SG tube inspections that were
manner are responsible for serving the Office of Nuclear Reactor Regulation. approved in Amendment Nos. 146 and
document on all other participants. [FR Doc. E8–3588 Filed 2–25–08; 8:45 am] 126 issued September 12, 2006, for
Filing is considered complete by first- BILLING CODE 7590–01–P refueling outage 13 and the subsequent
class mail as of the time of deposit in operating cycle for Vogtle 1, and for
the mail, or by courier, express mail, or refueling outage 12 and the subsequent
expedited delivery service upon NUCLEAR REGULATORY operating cycle for Vogtle 2.
depositing the document with the COMMISSION Before issuance of the proposed
provider of the service. [Docket Nos. 50–424 and 50–425] license amendment, the Commission
Non-timely requests and/or petitions will have made findings required by the
and contentions will not be entertained Vogtle Electric Generating Plant, Units Atomic Energy Act of 1954, as amended
absent a determination by the 1 and 2; Notice of Consideration of (the Act), and the Commission’s
Commission, the presiding officer, or Issuance of Amendments to Facility regulations.
the Atomic Safety and Licensing Board Operating Licenses, Proposed No The Commission has made a
that the petition and/or request should Significant Hazards; Consideration proposed determination that the
be granted and/or the contentions Determination, and Opportunity for a amendment request involves no
should be admitted, based on a Hearing significant hazards consideration. Under
balancing of the factors specified in 10 the Commission’s regulations in Title 10
CFR 2.309(c)(1)(i)–(viii). To be timely, The U.S. Nuclear Regulatory of the Code of Federal Regulations (10
filings must be submitted no later than Commission (the Commission, or the CFR), Section 50.92, this means that
11:59 p.m. Eastern Time on the due NRC) is considering issuance of an operation of the facility in accordance
date. amendment to Facility Operating with the proposed amendment would
Documents submitted in adjudicatory License Nos. NPF–68 and NPF–81 to not (1) involve a significant increase in
proceedings will appear in NRC’s Southern Nuclear Operating Company, the probability or consequences of an
electronic hearing docket which is Inc. (the licensee) for operation of the accident previously evaluated; or (2)
available to the public at http:// Vogtle Electric Generating Plant, Units 1 create the possibility of a new or
ehd.nrc.gov/EHD_Proceeding/home.asp, and 2 (Vogtle 1 and 2), which are different kind of accident from any
unless excluded pursuant to an order of located in Burke County, Georgia. accident previously evaluated; or (3)
the Commission, an Atomic Safety and The proposed amendments in the
involve a significant reduction in a
Licensing Board, or a Presiding Officer. licensee’s application dated February
margin of safety. As required by 10 CFR
Participants are requested not to include 13, 2008, propose a one-time steam
50.91(a), the licensee has provided its
personal privacy information, such as generator (SG) tubing eddy current
analysis of the issue of no significant
social security numbers, home inspection interval revision to the
hazards consideration, which is
addresses, or home phone numbers in Vogtle Electric Generating Plant, Units 1
presented below:
their filings. With respect to copyrighted and 2 (Vogtle 1 and 2) Technical
works, except for limited excerpts that Specifications (TSs) 5.5.9, ‘‘Steam (1) Does the proposed change involve a
Generator (SG) Program,’’ to incorporate significant increase in the probability or
serve the purpose of the adjudicatory
consequences of an accident previously
filings and would constitute a Fair Use an interim alternate repair criterion evaluated?
application, Participants are requested (ARC) in the provisions for SG tube Response: No.
not to include copyrighted materials in repair criteria during the Vogtle 1 Of the various accidents previously
their submissions. inspection performed in refueling evaluated, the proposed changes only affect
For further details with respect to this outage 14 and subsequent operating the steam generator tube rupture (SGTR)
license amendment application, see the cycle, and during the Vogtle 2 event evaluation and the postulated steam
mstockstill on PROD1PC66 with NOTICES

application for amendment dated inspection performed in refueling line break (SLB), locked rotor and control rod
February 15, 2008, which is available outage 13 and subsequent 18-month SG ejection accident evaluations. Loss-of-coolant
accident (LOCA) conditions cause a
for public inspection at the tubing eddy current inspection interval compressive axial load to act on the tube.
Commission’s PDR, located at One and subsequent 36-month SG tubing Therefore, since the LOCA tends to force the
White Flint North, File Public Area O1 eddy current inspection interval. These tube into the tubesheet rather than pull it out,
F21, 11555 Rockville Pike (first floor), amendments request approval of an it is not a factor in this licensing amendment