Вы находитесь на странице: 1из 1

Concept Engineering to Turnkey Contracts

Complete Development
of Offshore Oil & Gas Fields

CAMFORCE and MARS Two Powerful


Names In Subsea Processing

MORE INNOVATIVE
THAN EVER
DORIS Engineering -

Cameron quality, experience and reliability come together with technology to create CAMFORCE
Subsea Processing Systems. Representing a unique culmination of strategic planning an Cameron
quality, experience and reliability come together to create two powerful names in subsea processing
CAMFORCE and MARS. CAMFORCE represents the future in boosting and separation technologies

CAMFORCE Boosting

CAMFORCE Separation

MARS Enabling

while MARS (Multiple Application Reinjection System) provides the enabling technology to adapt

www.doris-engineering.com

to a variety of systems.

CAMFORCE and MARS visit www.c-a-m.com/camforce to nd out more.


TC9964

Platform/Floater
Exploration
Subsea
Denotes Current World Record

10,000

E
Water Depth Feet/(m)

Two Leaders
are now

(3,352.6 m)

THE Leader in

Topsides Design

8,000

6,000
5,000
4,000

2,000

(609.6 m)

1,000

(304.8 m)

2012

1950

1960

1970

1980

1990

2000

10.0 (16.1 km)


4,393' (1,339 m)

11.2 (18 Km)


7,960' (2,427 m)

Record Water Depth


for Gas SS Tieback
Shells Tobago

Shells Silvertip

9,627'
9,627'

0 Miles
Short

Oil Subsea Tiebacks:

5.0

10.0

47.0 (75.6 km)


4,200' (1,280 m)

56.0 (90.1 km)


6,750' (2,057 m)

Anadarkos Vortex

44.7 (72.0 km)


9,014' (2,748 m)

43.4

35.0

40.0

Oveng
2007

Snorre A
1992

Heidrun
1995

Prince
2001

Okume/Ebano
2007

Morpeth
1998

Jolliet
1989

Typhoon
2001

Matterhorn
2003

Mars
1996

Auger
1994

Brutus
2001

Mars B/
Olympus
2015

Marlin
1999

Ram Powell
1997

Spars

(2,743.2 m)
2,934 m
89.0

2,934 m

45.0

50.0

Conventional

55.0

60.0

65.0

70.0

75.0

80.0

85.0

Dry Tree
Wet Tree

(3,048.0 m)

90.0

95.0

Semi-FPUs

100.0

Conventional

Long Distance Tieback (LDT)


Conventional

Deep Draft Wet Tree

Long Distance Tieback (LDT)

Deep Draft Dry Tree

Tieback Distance Miles (km)

Subsea Tiebacks

COURTESY:

West Seno A
2003

Allegheny
2003

Ursa
1999

Kizomba A
2004

Papa Terra P-61

Kizomba B
2005

Neptune
2007

Shenzi
2009

Marco Polo
2004

Magnolia
2005

Who Dat
2011

Innovator Gomez Hub


2006

P-18
1994

P-19
1997

Big Foot
2014

P-55
2009

P-56
2010

Gumusut
Kakap
2012

P-40
2004

Thunder Hawk
2009

P-52
2012

Thunder Horse
2008

H HH H
H HH H
HH
HH
HHHHH
HHHHH
HHHHHH
HH HH
HHHHHHH

HHH
HHH

HHHH
HHHH

HHH
HHH
HHH
H

HHHHH
HHHHHH
HHHHH H
HHH

GAS REINJECTION

GAS PIPELINE

SHUTTLING APPLICATION

OIL PIPELINE EXPORT APPLICATION

EXPORT

TOP TENSIONED RISER

FLEXIBLE PIPE CAPABLE

STEEL CATENARY RISER (SCR) CAPABLE

HARSH

AREA WITH HURRICANES/TYPHOONS

CALM

SMALL FOOTPRINT (Mooring System)

REMOTE

NEARBY INFRASTRUCTURE

RISERS

H HHHHHH HHHH
H HHHHHH H HH
HH HH HHH HHH
H H
HH
HHH
H
HHHH
HHH
HHHHHHHHHHHH
HHHHHHHHHHHHH
HHHHHHHHHHHHH
HHHHHHHHHHHHH
HHHHHHHHHHHHH
H
HHH H H HH
HHHHHHHHHHHHH
HHHHHHHHHHHHH
H
HHH

Deepwater Growth

Semi-FPS/FPUs 16 Deepest Facilities Sanctioned, Installed or Operating

4/4/12 5:15 PM
Hutton (1)
1984

Proprietary TLPs

Anadarkos Cheyenne

24.9 (40.1 km)


9,005' (2,745 m)

30.0

Conventional TLPs

(2,438.4 m)

TLPs Sanctioned, Installed, Operating or Decommissioned


MusEng_OSmaps_1205 1

Turret Moored
Unconventional*

57.0 (91.7 km)


7,210' (2,198 m)

Shells Coulomb
27.0 (43.5 km)
7,570' (2,307 m)

24.5 (39.4 km)


8,381' (2,555 m)

HH H
HH H
HHHH
HHH
HHH

Spread Moored

Totals Canyon Express

34.0 (54.7 km)


7,868' (2,399 m)

25.0

FPSOs

(1,828.8 m)

Anadarkos Atlas

20.0

Compliant Towers

(2,133.6 m)
Dominion Expl.s San Jacinto

HHH
HHH
HHHH

FDPSOs

Anadarkos Jubilee

15.0

* Unconventional FPSOs include Sevan SSP, Petrobras MonoBR,


Global SSP SSP320 & SSP PLUS.

(1,524.0 m)

Anadarkos Spiderman
24.0 (38.6 km)
8,113' (2,473 m)

H
H

Conventional Fixed Platform (>1,000')

Oil Subsea Tiebacks


Future Oil Subsea Tiebacks
Gas Subsea Tiebacks
Future Gas Subsea Tiebacks
Oil Subsea Tieback Experience Limit
Gas Subsea Tieback Experience Limit
Denotes Current World Record for Installed Tiebacks

Legend:

Mariners Bass Lite

20.6 (33.1 km)


7,868' (2,675 m)

Qualified

ARIAL
EXTENT

DRY TREE

Pioneers Harrier

Notes: 1. Assistance from Quest Offshore Resources, Inc. (www.questdf.com) 2. This chart does not include all non-record-holding subsea tiebacks.

COURTESY:

Legend:

(1,219.2 m)

68.0 (109.4 km)


5,300' (1,615 m)

22.0 (35.4 km)


8,856' (2,700 m)

Record Water Depth


for Oil SS Tieback

(609.60 m)

88.9 (143 km)


1,980' (603.5 m)

Shells Mensa

Anadarkos Atlas NW

Short

Gas Subsea Tiebacks:

Totals Laggan-Tormore

74.6 (120.0 km)


3,609' (1,100 m)

29.0 (46.67 km)


4,350' (1,326 m)

16.8 (27.1 km)


6,950' (2,118.2m)

12.0 (19.3 Km)


8,340' (2,542 m)

9.0 (14.4 km)


9,356' (2,852 m)

(304.80 m)

Norsk Hydros Ormen Lange

40.0 (64.4 km)


3,500' (1,067 m)

Shells Herschel

Anadarkos Mondo

6.0 (9.6 km)


9,627' (2,934 m)

10,000'

Pioneers Raptor

ExxonMobils Mica

Shells Fourier

14.7 (23.7 km)


7,934' (2,418 m)

Statoils Q

9,000'

35.0 (53.1 km)


3,500' (1,067 m)

Shells East Anstey

Anadarkos Merganser

COURTESY:

(0' m)

Field Proven

12.8 (20.7 km)


6,739' (2,054 m)

7,000'

(160.9 km)

(914.40 m)

17.0 (27.4 km)


5,334' (1,626 m)
11.0 (17.77 km)
6,590' (2,009 m)

(152.9 km)

Pioneers Tomahawk

BPs King

11.8 (18.96 km)


5,759' (1,755 m)

8,000'

30.0 (48.3 km)


3,400' (1,036 m)

20.0 (32.2 km)


3,900' (1,189 m)

4.74 (7.628 km)


6,240' (1,902 m)

2020

Year

7.0 (11.26 km)


4,851' (1,479 m)

(144.8 km)
143 km

70.8 (114.0 km)


2,133' (650 m)

Shells Crosby

Shells Ariel

2010

ExxonMobils Madison

(136.8 km)

BG Internationals Simian/Sienna

Pioneers Falcon

Shells Europa

11.8 (19.0 km)


3,685' (1,123 m)

6,000'

(1,219.1 m)
(914.4 m)

7.0 (11.26 km)


4,356' (1,328 m)

(128.7 km)

89.0 (143 Km)


1,131.9' (345 m)

55.9 (90.0 km)


2,040' (622 m)

28.0 (45.1 km)


3,488' (1,063 m)

Shells Macaroni

(120.7 km)

BG Internationals Scarab/Saffron

Chevrons Gemini

Shells Keppler

(1,523.9 m)

3,000

ExxonMobils Marshall

(112.7 km)

Mariners Pluto

Nobles Lost Ark

BPs Aspen

(104.6 km)

Record Distance for


Gas SS Tieback

28.6 (46.0 km)


2,900' (884 m)

16.0 (25.8 km)


3,150' (960 m)

(96.6 km)

Statoils Snhvit

22.0 (35.3 km)


738.1' (225 m)

27.0 (43.5 km)


2,700' (823 m)

Shells Oregano

5,000'

(1,828.7 m)

World Record
Deepest Floating Facility
8,200' (2,500m) US GOM
BW Pioneer FPSO
(Cascade/Chinook)
Operator: Petrobras

11.5 (18.5 km)


2,015' (614 m)

8.0 (12.9 km)


3,400' (1,036 m)

(2,438.3 m)

7,000

Notes: 1. Assistance from Quest Offshore Resources, Inc. (www.questdf.com)

www.alliance-engineering.com

(2,743.1 m)

BPs Machar

17.0 (27.4 km)


1,940' (591 m)

Shells Habanero

(88.5 km)

43.4 (69.8 km)


574' (175 m)

Record Distance for


Oil SS Tieback

Shells Manatee

4,000'

(2,133.5 m)

0
1940

www.mustangeng.com

(3,047.9 m)

World Record
Deepest Subsea Tree
9,627' (2,934 m)
US GOM, Tobago
Operator: Shell

9,000

1455 West Loop South, Suite 400


Houston, TX 77027
Tel: 713-963-6200; Fax: 713-963-6296
www.offshore-mag.com

18.0 (29.0 km)


1,355' (413 m)

(80.5 km)

Shells Penguin A-E

24.3 (39.2 km)


738' (225 m)

ATPs Ladybug

3,000'

Ultra Deepwater

World Record DP Drilling


10,194' (3,107m) Offshore India
Rig: Transoceans Dhirubhai
Deepwater KG2
Operator: Reliance Industries

Legend:

11,000

(3,657.4 m)

(72.4 km)
69.8 km

LOCATION
ENVIR.
APPLICATION CONDITIONS

See Well Capability by Deepwater Production Type Graph WELL COUNT

Present

12,000

(64.4 km)

WET TREE

Worldwide Progression of Water Depth Capabilities for Offshore Drilling & Production (As of March 2012)

(56.3 km)

TREE
TYPE

LARGE AREA

Subsea
Tieback

Control
Buoy

(48.3 km)

SMALL AREA

Cell
Spar

Classic Spar

(40.2 km)

DECK/HULL MATING @ FABRICATION YARD

MinDOC

Subsea Manifold

COURTESY:

(32.2 km)

MAJOR
CAPABILITY

DECK/HULL MATING OFFSHORE

Truss
Spar

Deepwater Field Development


Concept Selection Matrix

PAYLOAD SENSITIVE

Semi-FPU

4/7/11 3:31 PM

RESERINSTALL VOIR
INFO.

STORAGE

Conventional
TLP

Deepwater

Assistance by: E. Kurt Albaugh, P.E. of Repsol E & P USA


Graphics by: Chris Jones of Xenon Group | www.xenongroupdesign.com
For additional copies or comments, e-mail: posters@mustangeng.com or posters@pennwell.com

New Generation
TLP

(24.1 km)

Statoils Mikkel

2,000'
Compliant
Tower

(16.1 km)

1,000'

Water Depth Feet/(m)

Prepared by: Christopher N. Mahoney and Chad Supan of Wood Group Mustang

(8.05 km)

0'

US MMS Definitions:
Shallow

FPSO

Fixed
Platform

Cameron_OSmaps_1105 1

World Record Subsea Tiebacks Sanctioned, Installed, Operating or Future Tiebacks (Water Depth vs. Tieback Distance) As of March 2012
(0 km)

Going Deeper with Production Technology May 2012

3/28/06 4:54:26 PM

See Water Depth Range Comparison Graph WATER DEPTH RATING

2012 DEEPWATER SOLUTIONS &


RECORDS FOR CONCEPT SELECTION

Doris_OSmaps_0605 1

4/4/12 11:16 AM

DRILLING

ABS_OSmaps_1205 1

PRODUCTION

4/7/11 2:51 PM

Deepwater System Types

FIELD APPLICATION EXPERIENCE

Floatec_OSmaps_1105 1

Blind Faith
2008

Na Kika
2003

Jack/St. Malo
2014

Atlantis
2007

120

Independence
Hub
2007

Legend:

110

Compliant Towers
Spar/DDCVs
TLPs
Semi-FPUs
FPSOs

100
90
80

China

North Sea

1 Semi FPS/FPU
17 FPSOs

15 Semi FPS/FPUs
23 FPSOs
2 TLPs

271 m
889 ft
Equatorial Guinea

335 m
1,100 ft
Norway

345 m
1,132 ft
Norway

454 m
1,490 ft
US GOM

503 m
1,650 ft
Equatorial Guinea

518 m
1,699 ft
US GOM

536 m
1,759 ft
US GOM

Southeast Asia

5 FPSOs

Gulf of Mexico
10 Semi FPS/FPUs
3 FPSOs (1 - US, 2 - Mexico)
18 Spar/DDCVs
15 TLPs
3 Compliant Towers

India

Boomvang
2002

Front Runner
2004

Nansen
2002

50

945 m
3,100 ft
US GOM

30

980 m
3,216 ft
US GOM

987 m
3,236 ft
US GOM

1,009 m
3,310 ft
US GOM

1,021 m
3,349 ft
Indonesia

1,159 m
3,800 ft
US GOM

1,178 m
3,863 ft
Angola

1,178 m
3,863 ft
Angola

1,200 m
3,937 ft
Brazil

Tahiti
2009

Titan
2010

Tubular Bells
2014

Holstein
2004

1,700 m
5,576 ft
Brazil

World Records:
1,280 m
4,200 ft
US GOM

1,311 m
4,300 ft
US GOM

1,333 m
4,373 ft
US GOM

Hoover/Diana
2000

Mad Dog
2005

Constitution
2006

Red Hawk
2004

Horn Mountain
2002

Lucius
2014

Devils Tower
2004

Perdido
2010

Lena Guyed Tower


1983

1,425 m
4,674 ft
US GOM

1,581 m
5,187 ft
US GOM

BBLT
2005

Tombua Landana
2009

Petronius
1998

Baldpate
1998

Final Authorization

1 FPSO

Semi-FPU

792 m
2,599 ft
US GOM

Notes

DDCV

Deep Draft Caisson Vessel

1. Though referenced throughout the poster, Hutton and Typhoon TLPs have been decommissioned.

DDF

Deep Draft Floater

2. World Records (noted in red throughout the poster) refer only to operating or installed vessels.

DDS

Deep Draft Semi

3. Water Depth Capability, Throughput Capacity and Well Capability charts contain a sampling

FDPSO

Floating Drilling, Production, Storage and Offloading System

of vessels to demonstrate the capability range for each concept. The chart is not inclusive of all

FPSO

Floating Production, Storage and Offloading System

operating vessels.

MinDOC

Cross between a semisubmersible and a truss spar

4. Throughput Capacity Chart Gas processing capacity is converted to BOE by dividing by 6.

MODU

Mobil Offshore Drilling Unit

5. The Moss Maritime Octabuoy is qualified for two locations: the UK North Sea and the Gulf

Semi-FPU

Semi-Submersible Floating Production Unit

TLP

Tension Leg Platform

POSTER

98

of Mexico. Well capability for the Cheviot facility is noted for both locations.
6. Canyon Express subsea tieback well capability is based on the same flow line loop.

Classic
Spar

Truss
Spar

Cell
Spar

10

20

1. Conventional Fixed Platform

30

40
35

Virgo

10

2. Compliant Tower
2

50

60

40

Amberjack

18
Baldpate

10

Tombua Landana

70

BBLT

80

90

28
Sendje Ceiba

13

10

16

UltraDeep, MODEC Moses, FloaTEC ETlp)

13

A. Dry Tree
B. Wet Tree
7. Spar/DDCV (Technip, FloaTEC)
A. Dry Tree

11

16

Hoover/Diana

Mirage
2

8
Red Hawk

2
P-14

Canyon Express

Lena,
Petronius

40

Baldpate

Atlantis

Asgard

P-19, P-25

Thunder Horse

21

Tombua Landana

Independence
Hub

30

Piranema,
Goliat,
Hummingbird
43

(Sevan SSP, Petrobras MonoBR,


Global SSP SSP320 & SSP PLUS)

10

5. Conventional TLP

P-48

37

Brutus

71

Ormen Lange
Scarab Saffron

Girassol

Field Proven
Qualified
Conceptual

Dalia

Indicates Installed Facility (Proven)


Indicates Sanctioned Facility (Qualified)
Not Sanctioned/Sanction Pending
Decommissioned Facility

Neptune

76

10

20

30

40

50

60

70

80

90

100

Number of Well Slots or Wells

COURTESY:

Mars

Heidrun

Snorre A

www.mcdermott.com Email: business.development@mcdermott.com

P-26

181

Kristin
156

Jack/St. Malo

209

Na Kika
167

P-36

230

Atlantis

245

Troll C

293

Thunder Horse
Troll B

Falcon

80'

7,000'

8,000'

9,000'

(Sevan SSP, Petrobras MonoBR,


Global SSP SSP320 & SSP PLUS)

Mensa

Canyon Express

10,000'

50

100

150

200

250

300

350

400

for Offshore Oil and Gas Operations

24.1

Kikeh

25.4

26.4 52.6

29.5 53.6
36.5

Holstein

61.9

31.0

38.8 69.8
37.6

34.9

72.5

40.1

44.6 84.7
55.6

41.0 96.6
85.3

26.8 112.1

78.2

39.8 118.0

80.2

44.4 124.6

31.1 126.8

95.7

12

Typhoon (1)

Indicates Installed Facility (Proven)


Indicates Sanctioned Facility (Qualified)
Not Sanctioned/Sanction Pending
Decommissioned Facility

24

2,862'

36

48

60

72

84

96

Parque das Conchas

Tupi Nordeste

Pioneer

108

120

132

Neptune
1,116'

3,863'

Matterhorn

45.2 59.5

14.3

3,678'

Genesis
3,353'

Innovator

Magnolia

SBM Atlantia UltraDeep

Constitution

5,610'

Neptune

P-51

10,000'

6,298'

P-52

7,072'

Thunder Horse

7,920'

12,000'

Independence Hub

P-51
1,000'
Horton Wison MCF
5,300'

738'

9. Subsea Tiebacks

6,750'

Mensa

Bass Lite

7,570'

8,381'

Coulomb

Vortex

SBM DDS, Horton Wison MCF,


Moss Octabuoy
12,000'
SBM DTS, Horton Wison MCF,
Moss Octabuoy
9,627'
9,014'
Cheyenne

Tobago

1,000'

2,000'

3,000'

4,000'

5,000'

6,000'

7,000'

8,000'

9,000'

10,000'

(304.8 m)

(609.6 m)

(914.4 m)

(1,219.1 m)

(1,523.9 m)

(1,828.7 m)

(2,133.5 m)

(2,438.3 m)

(2,743.1 m)

(3,047.9 m)

US MMS Definitions:
Shallow

POSTER Ad 6 10 1 i dd 1

Deepwater

Ultra Deepwater

FPSO Solutions | THE KBR WAY


www.deepwater.com

36.8

33.6 75.9

42.3

Marlin

43.2

Auger

108.1 Months
TOTAL TIME AVERAGE:
Discovery to Sanction:
67.9 Months
Sanction to First Production: 40.2 Months

34.1 77.3
51.9 77.4

25.5

Kizomba B

35.6 85.6

50.0

Prince

16.8 85.7

68.9

33.7 86.6

52.9
49.1

39.9 89.0
20.3 94.2

73.9

Big Foot

59.2

36.5 95.7
45.3 99.7

54.4

31.7 100.0

68.3

Heidrun
Hutton

74.8

39.0 75.5

36.5

Ursa

Atlantis

1,223'

Cheviot

38.0

Okume/Ebano

Jolliet

Perdido
5,904'

4,101'

P-40

36.2 70.6

34.4

Allegheny

7,816'

Devils Tower

31.0 68.0

37.0

Papa Terra P-61

4,970'

Nansen

36.6 67.6

31.0

Mars

8,000'

4,674'

Kizomba A,
Kizomba B

2,599'

2,986'

Troll C

Sevan Global SSP

Discovery to Sanction
Estimated Sanction to First Production
Sanction to First Production

27.7 55.5

27.8

Oveng

>11,000'

Legend:

31.0 50.4

Shenzi

Ursa

2,816'

Morpeth

Oveng

Moss Octabuoy

17.1 41.5

19.4

West Seno A

>10,000'

3,800'

Auger
1,699'

Janice A

8,200'

Piranema

(SBM Atlantia SeaStar, FourStar

262'

6,890'

5,838'

3,575'

Heidrun
889'

6. Proprietary TLP

24.4

Matterhorn

>10,000'

Seillean

Xikomba

Goliat

Hutton(1)

Agbami
4,856'

P-48

1,132'

482'

5. Conventional TLP

6,500'

Ormen Lange

Scarab Saffron

66.8 Months
34.4 Months
32.4 Months

33.6 49.6

Lucius

10,000'

Azurite
4,797'

3,396'

1,312'

Hummingbird

Sevan

(SBM Atlantia DTS, FloaTEC Truss Semi & E-Semi,


Aker Solutions DDP, Technip EDP, Moss Maritime Octabuoy,
Horton Wison Multi-Column Floater)

412

32.3 48.9
26.2

Marco Polo

C. Dry Tree Deep Draft

133

16.0

Magnolia

Fluminense

394'

C. Unconventional

53.1 124.2

71.1
91.8

(1)

Olympus*

47.6 139.4

95.6

51.0 146.6

Ram/Powell

31.6 147.4

115.8

Brutus

117.3

Snorre A

30.2 147.5
50.5 151.5

101.0

Morpeth

20.8 207.9

187.1

12

24

36

48

60

72

84

96

Note: Olympus is the second TLP in the Mars Field and the discovery to first oil
time period is not a representative comparison to the rest of the chart.

RELIABILITY

108

120

132

144

156

168

180

Months

INNOVATION

KBR is a leading FPSO solutions provider. We offer


a wide spectrum of capabilities, including:
 Concept Design & Feasibility
 Basic Design
 FEED and Detailed Engineering
 Project Management
 Procurement
 Construction Management
 Integrity Management
We apply our experience and knowledge to deliver
better solutions. The KBR Way.

INGENUITY

192

204

216

COURTESY:

SAFETY

www.kbr.com

6/21/10 9 44 23 AM
KBR_OSmaps_1205 1

3/28/12 9:11 AM
Trans_OSmaps_1007 1

0512OS_DeepwaterPoster040512Ads.indd 1

Abandon

4,526'

2,198'

500' 557'

Horton Wison MCF

Devils Tower

Kizomba A

(SBM Atlantia DeepDraft Semi, Aker Solutions DDP,

Independence Hub

16.6

Tubular Bells

Petronius

CNOOC 102

TO 426 ? Off h
McDerm_OSmaps_1205 1

6,000'

3,000'

Kizomba A

B. Wet Tree Deep Draft

sgard B

190

86

B. Conversion

8. Semi-FPU
A. Wet Tree Conventional

360

317

Medusa

COURTESY:

Field Proven
Qualified
Conceptual

Chang Qing Hao

Exmar OPTI-EX, FloaTEC DeepDraft Semi, Moss Maritime


Octabuoy, Horton Wison Multi-Column Floater)

World Trends and Technology


2012 McDermott International, Inc. All rights reserved.

1,742'

BBLT

7. Spar/DDCV (Technip, FloaTEC)

OCEANS COVER 285 BILLION BARRELS OF THE WORLDS KNOWN OIL RESERVES OFFSHORE COVERS THEM ALL.

Available 2012

5,000'

Mikkel
King Kong

Operate

Bullwinkle

Mad Dog

Horton Wison MCF


52

Ursa

366

251

TOTAL TIME AVERAGE:


Discovery to Sanction:
Sanction to First Production:

34.7 46.4

Titan

Legend:

1,930'

91

Cheviot

231

MBOE/D Throughput

Delivering integrated SURF


& Floating Production Systems
from concept to commissioning.

4,000'

3,937'

0'
0

3,000'

66'

UltraDeep, MODEC Moses, FloaTEC ETlp)

OPTI-EX

33

9. Subsea Tiebacks

Holstein

85

Thunder Hawk

217

Ram/Powell

118 126

72

193

Sevan

118 124

Front Runner Constitution

Innovator
35

400

Marco Polo

37

26 32

Execute

1,700'

66'

120

75 80

63

Blind Faith

(SBM Atlantia DTS, FloaTEC Truss Semi & E-Semi,


Aker Solutions DDP, Technip EDP, Moss Maritime Octabuoy,
Horton Wison Multi-Column Floater)

Legend:
35

23 24
Kizomba

P-14

1,353'

2. Compliant Tower

P-13

P-54

155

Big Foot
Matterhorn Neptune Prince Magnolia

10

2,000'

1,000' 1,280'

Erha,
Kizomba A

25.5 42.5

11.7

TLP Cycle Time Analysis Discovery to First Production (shown in months)

1,000'

Cognac

4. FPSO
A. New Build

Sevan

Marlin
58 63

Akpo

216

17.0

Gunnison
Front Runner

Neptune

By Deepwater Facility Type

1. Conventional Fixed Platform

317

32.9 40.4

Months
(2, 3)

1,025'

200

90

42

UltraDeep, MODEC Moses, FloaTEC ETlp)

Schiehallion

Voyageur

Jolliet

6. Proprietary TLP (SBM Atlantia SeaStar, FourStar

Define

Project Phases and Gates

Lena

287

197

120

30

C. Unconventional

C. Dry Tree Deep Draft


SBM DTS,
FloaTEC

Horton Wison MCF

277

25.1 39.7

7.5

Genesis

0'

Indicates Installed Facility (Proven)


Indicates Sanctioned Facility (Qualified)
Not Sanctioned/Sanction Pending
Decommissioned Facility

Discovery to Sanction
Estimated Sanction to First Production
Sanction to First Production

24.2 35.1

14.6

Hoover/Diana

Concepts/Cases/Options

1,000'

203

169
Brasil

(SBM Atlantia DeepDraft Semi, Aker Solutions DDP,


Exmar OPTI-EX, FloaTEC DeepDraft Semi, Moss Maritime
Octabuoy, Horton Wison Multi-Column Floater)

Horton Wison MCF

Field Proven
Qualified
Conceptual

10.9

Red Hawk

Gates

Select

COURTESY:

23.7 31.6

Horn Mountain

Legend:

COURTESY:

400

Legend:

7.9

Constitution

531 m
1,742 ft
US GOM

Planning

2010-2015(e)

2005-2009

Legend:

Perdido

First Compliant Tower: Baldpate


Worlds Deepest Compliant Tower: Petronius

350

2000-2004

22.4 28.0

Tahiti

World Records:

2,383 m
7,817 ft
US GOM

1995-1999

Note: Year indicates first oil on current field. Assistance from Quest Offshore Resources, Inc. (www.questdf.com)

5.6

Boomvang

Spar

BBLT

Usan
108

10

390 m
1,280 ft
Angola

1990-1994

1980-1989
2,415 m
7,920 ft
US GOM

Mad Dog

Compliant Tower

1,710m
5,610 ft
US GOM

Nansen

3. FDPSO (SBM, Prosafe, OPE SSP)


160

New Orleans

B. Wet Tree Deep Draft

24

300

200

B. Conversion

8. Semi-FPS
A. Wet Tree Conventional

Na Kika

1,653 m
5,423 ft
US GOM

250

165

Azurite

Red Hawk
48

Coulomb

94

77

7. Spar/DDCV (Technip, FloaTEC)

Genesis

29

200

Bullwinkle

20

24

Cheviot (UKNS)
10
16

150

Amberjack

20

20

Cheviot (GOM)
9 10

9. Subsea Tiebacks

Neptune
17

16

(SBM Atlantia DTS, FloaTEC Truss Semi & E-Semi,


Aker Solutions DDP, Technip EDP, Moss Maritime Octabuoy,
Horton Wison Multi-Column Floater)

Kizomba A

12

C. Dry Tree Deep Draft

Kizomba B

36

Perdido

Tahiti

Blind Faith

Snorre A
34

1,616 m
5,300 ft
US GOM

Water Depth Range Comparison

San Jacinto

Shenzi

Allegheny

Hutton(1)

West Seno A
20

Morpeth

Jolliet

1,515 m
4,970 ft
US GOM

253

13

46

20

Okume/Ebano

Prince
5

28

20

1,463 m
4,800 ft
US GOM

366 m
1,200 ft
Angola

502 m
1,648 ft
US GOM

27

13

Kizomba B

Sevan

Marlin Heidrun Auger

(SBM Atlantia DeepDraft Semi, Aker Solutions DDP,


Exmar OPTI-EX, FloaTEC DeepDraft Semi, Moss Maritime
Octabuoy, Horton Wison Multi-Column Floater)

Dalia

Piranema

6. Proprietary TLP (SBM Atlantia SeaStar, FourStar

B. Wet Tree Deep Draft

Agbami

75

No Limit

5. Conventional TLP

8. Semi-FPS
A. Wet Tree Conventional

71

4. FPSO
A. New Build

Hummingbird

B. Wet Tree

37

1,348 m
4,420 ft
US GOM

3. FDPSO (SBM, Prosafe, OPE SSP)

100

Asgard A

1,330 m
4,364 ft
Malaysia

100

2. Compliant Tower

Deepwater Facility Type

(Sevan SSP, Petrobras MonoBR,


Global SSP SSP320 & SSP PLUS)

50

1. Conventional Fixed Platform

57
Kizomba C

1,324 m
4,344 ft
US GOM

By Deepwater Facility Type

10

Global Producer III

1,311 m
4,300 ft
US GOM

2,165 m
7,100 ft
US GOM

100

Petronius,
Lena

50

1,250 m
4,100 ft
US GOM

COURTESY:

Cognac

58

36

Jamestown
2

1,220 m
4,000 ft
US GOM

61
Pompano
42

38

14
Woollybutt
3

C. Unconventional

1,121 m
3,678 ft
US GOM

First Spar - Neptune (Deep Oil Technology Classic Spar)


First Truss Spar - Nansen (Technip)
First Cell Spar - Red Hawk (Technip)
First Drilling/Production Spar - Genesis (Technip)
World's Deepest Spar - Perdido (Technip)

Azurite
2

B. Spread Moored

1,053 m
3,453 ft
US GOM

Total MBOE/D Production Throughput Capacity


14

4. FPSO
A. Single Point Moored

1,015 m
3,330 ft
US GOM

World Records:

By Deepwater Production Type

3. FDPSO (SBM, Prosafe, OPE SSP)

MinDoc

(Bennett & Assoc.)

960 m
3,150 ft
US GOM

305 m
1,000 ft
US GOM

(3, 4)

Deepwater Facility Type

Information Accuracy: Every attempt has been made to identify, locate, and establish
the most current and correct information for all the various types of deepwater
production solutions either operating, installed, or sanctioned worldwide. No facility
was intentionally excluded from this poster. In some cases the most current information
was not included because information was not supplied in time or the project was
not sanctioned at press time. We make no guarantee that this list is all inclusive.
We have summarized the capability and operating experience by acting as a neutral
party and integrator of information. We have collected the information from company
brochures, interviews, press releases, industry publications,
contractor supplied information, and websites. Neither Mustang
Engineering, L.P., nor Offshore Magazine guarantees or assumes
any responsibility or liability for any reference on the information
presented. If any information is found to be incorrect, not
current, or needs to be added, please send your comments to
posters@mustangeng.com.

2012 Offshore

Industry Acronyms

1 Concept

K12038 2012 KBR. All Rights Reserved

COURTESY:

Deepwater Facility Type

253

2,156 m
7,072 ft
US GOM

Project

Sanction

Fixed Platform

678 m
2,223 ft
US GOM

2,134 m
7,000 ft
US GOM

Spar Cycle Time Analysis Discovery to First Production (shown in months)

FEL (Front End Loading)

17 FPSOs

588 m
1,930 ft
US GOM

10

1,980 m
6,494 ft
US GOM

TLP

Evolution of Spars

Well Capability

1,933 m
6,340 ft
US GOM

FEED (Front End Engineering Design)

Multiple Concepts Considered

(3, 5)

20

1,849 m
6,065 ft
US GOM

Influence on Project Expenditures & Concepts

FPSO

Total Number of Operating/Installed Vessels:

1,845 m
6,050 ft
US GOM

COURTESY:

Australasia
South Africa

1,795 m
5,888 ft
Brazil

First Semi-FPU - Argyll (Converted MODU)


First Wet Tree DDS - P-51 (Aker DDS)
First Dry Tree DDS - Cheviot (Moss Octabuoy)
Worlds Deepest Semi-FPU and FPS - Independence Hub (SBM Atlantia DDS)

Compliant Towers Sanctioned, Installed or Operating

Kikeh
2007

1,707 m
5,599 ft
Brazil

Last Production

1 Semi FPS/FPU
37 FPSOs
4 TLPs
2 Compliant Towers

Gunnison
2003

Genesis
1999

1,189 m
3,900 ft
Malaysia

First Production

21 Semi FPS/FPUs
31 FPSOs

910 m
2,985 ft
US GOM

Spars, DDFs, DDCVs Sanctioned, Installed or Operating


Medusa
2003

60

1,080 m
3,542 ft
Brazil

Cumulative Expenditures

West Africa

894 m
2,933 ft
US GOM

COURTESY:

Neptune
1997

Brazil

873 m
2,862 ft
US GOM

First TLP - Hutton (Brown & Root)


First New Generation Wet Tree TLP - Morpeth (SBM Atlantia SeaStar)
First New Generation Dry Tree TLP - Prince (WorleyParsons Sea/MODEC)
Worlds Deepest TLP - Magnolia (ABB ETLP)

1 Semi FPS/FPU
1 FPSO

945 m
3,100 ft
US GOM

40

World Records:

1 Semi FPS/FPU
20 FPSOs
1 Spar
1 TLP

915 m
3,000 ft
US GOM

639 m
2,097 ft
US GOM
859 m
2,816 ft
US GOM

North Africa

70

910 m
2,986 ft
Brazil

Project

2 FPSOs

770 m
2,526 ft
Brazil

Influence

147 m
482 ft
UK

Canada

4/4/12 2:43 PM

6/21/10 9:52 AM
4/5/12 5:10 PM

Вам также может понравиться