Federal Register / Vol. 73, No.

30 / Wednesday, February 13, 2008 / Rules and Regulations 8187

‘‘Before opening doors:


• IF DEPRESS VALVE selected in MAN mode:
—DEPRESS VALVE MAN CLT ................................................................................................................. Full Open.
—DP (Diff press) ......................................................................................................................................... Check zero.
• If evacuation required:
—Evacuation .............................................................................................................................................. Initiate.
—BAT (before leaving A/C) ...................................................................................................................... OFF/R.
• If evacuation not required:
—CABIN CREW and PASSENGERS ......................................................................................................... Notify’’.

Note 1: When the information described in DEPARTMENT OF TRANSPORTATION ADDRESSES: You may send comments by
paragraphs (f)(1), (f)(2), or (f)(3) has been any of the following methods:
included in the general revisions of the AFM, Federal Aviation Administration • Federal eRulemaking Portal: Go to
the general revisions may be inserted in the
http://www.regulations.gov. Follow the
applicable AFM, and the copy of the AD may
14 CFR Part 39 instructions for submitting comments.
be removed from that AFM.
[Docket No. FAA–2008–0167; Directorate • Fax: (202) 493–2251.
FAA AD Differences Identifier 2008–NM–029–AD; Amendment • Mail: U.S. Department of
Note 2: This AD differs from the MCAI 39–15374; AD 2008–04–02] Transportation, Docket Operations, M–
and/or service information as follows: No 30, West Building, Ground Floor, Room
RIN 2120–AA64 W12–140, 1200 New Jersey Avenue, SE.,
differences.
Airworthiness Directives; Bombardier Washington, DC 20590.
Other FAA AD Provisions • Hand Delivery: U.S. Department of
Model DHC–8–400 Series Airplanes
(g) The following provisions also apply to Transportation, Docket Operations, M–
this AD: AGENCY: Federal Aviation 30, West Building, Ground Floor, Room
(1) Alternative Methods of Compliance Administration (FAA), Department of W12–140, 1200 New Jersey Avenue, SE.,
(AMOCs): The Manager, International Transportation (DOT). Washington, DC 20590, between 9 a.m.
Branch, ANM–116, FAA, has the authority to and 5 p.m., Monday through Friday,
approve AMOCs for this AD, if requested ACTION: Final rule; request for
using the procedures found in 14 CFR 39.19. comments. except Federal holidays.
Send information to ATTN: Tom Stafford, For service information identified in
Aerospace Engineer, International Branch, SUMMARY: The FAA is adopting a new this AD, contact Bombardier, Inc.,
ANM–116, Transport Airplane Directorate, airworthiness directive (AD) for certain Bombardier Regional Aircraft Division,
FAA, 1601 Lind Avenue, SW., Renton, Bombardier Model DHC–8–400 series 123 Garratt Boulevard, Downsview,
Washington 98057–3356; telephone (425) airplanes. This AD requires inspecting Ontario M3K 1Y5, Canada.
227–1622; fax (425) 227–1149. Before using all barrel nuts to determine if the barrel
any approved AMOC on any airplane to Examining the AD Docket
nuts have a certain marking, inspecting
which the AMOC applies, notify your affected bolts to determine if the bolts You may examine the AD docket on
appropriate principal inspector (PI) in the the Internet at http://
are pre-loaded correctly, and replacing
FAA Flight Standards District Office (FSDO),
all hardware if the pre-load is incorrect. www.regulations.gov; or in person at the
or lacking a PI, your local FSDO.
(2) Airworthy Product: For any requirement For airplanes on which the pre-load is Docket Management Facility between 9
in this AD to obtain corrective actions from correct, this AD requires doing a.m. and 5 p.m., Monday through
a manufacturer or other source, use these repetitive visual inspections for Friday, except Federal holidays. The AD
actions if they are FAA-approved. Corrective cracking of the barrel nuts and cradles docket contains this AD, the regulatory
actions are considered FAA-approved if they and replacing all hardware for all evaluation, any comments received, and
are approved by the State of Design Authority cracked barrel nuts. This AD also other information. The street address for
(or their delegated agent). You are required requires replacement of all hardware for the Docket Office (telephone 800–647–
to assure the product is airworthy before it 5527) is in the ADDRESSES section.
certain affected barrel nuts that do not
is returned to service.
have cracking, which would end the Comments will be available in the AD
(3) Reporting Requirements: For any
reporting requirement in this AD, under the repetitive inspections for those docket shortly after receipt.
provisions of the Paperwork Reduction Act, airplanes. This AD also provides an FOR FURTHER INFORMATION CONTACT:
the Office of Management and Budget (OMB) optional replacement for all affected Pong Lee, Aerospace Engineer, Airframe
has approved the information collection barrel nuts. This AD results from reports and Propulsion Branch, ANE–171, FAA,
requirements and has assigned OMB Control of cracking in the barrel nuts at the four New York Aircraft Certification Office,
Number 2120–0056. primary front spar wing-to-fuselage 1600 Stewart Avenue, Suite 410,
Related Information attachment joints. We are issuing this Westbury, New York 11590; telephone
(h) Refer to MCAI European Aviation AD to detect and correct cracking of the (516) 228–7324; fax (516) 794–5531.
Safety Agency (EASA) Airworthiness barrel nuts at the wing front spar wing- SUPPLEMENTARY INFORMATION:
Directive 2007–0093 R1, dated April 17, to-fuselage joints, which could result in
2007, for related information. reduced structural integrity of the wing- Discussion
to-fuselage attachments and consequent Transport Canada Civil Aviation
Material Incorporated by Reference
detachment of the wing. (TCCA), which is the airworthiness
(i) None.
DATES: This AD becomes effective authority for Canada, notified us that an
Issued in Renton, Washington, on February February 13, 2008. unsafe condition may exist on certain
4, 2008. The Director of the Federal Register Bombardier Model DHC–8–400 series
pwalker on PROD1PC71 with RULES

Kevin Hull, approved the incorporation by reference airplanes. TCCA advises that during
Acting Manager, Transport Airplane of a certain publication listed in the AD scheduled maintenance, an operator
Directorate, Aircraft Certification Service. as of February 13, 2008. found cracks in the barrel nut at one of
[FR Doc. E8–2587 Filed 2–12–08; 8:45 am] We must receive comments on this the four primary front spar wing-to-
BILLING CODE 4910–13–P AD by March 14, 2008. fuselage attachment joints. Investigation

VerDate Aug<31>2005 18:00 Feb 12, 2008 Jkt 214001 PO 00000 Frm 00003 Fmt 4700 Sfmt 4700 E:\FR\FM\13FER1.SGM 13FER1
8188 Federal Register / Vol. 73, No. 30 / Wednesday, February 13, 2008 / Rules and Regulations

determined that the cracks were due to marking of LH7940T SPS 01 (all barrel safe flight of civil aircraft and thus, the
hydrogen embrittlement and that the nuts with this marking will also have a critical need to assure the structural
problem is likely restricted to a batch of yellow dot identifier). integrity of the front spar wing-to-
166 barrel nuts from one supplier. In • Inspecting (repetitively) affected fuselage attachment joints and the short
addition, another operator has reported bolts to determine if the bolts are pre- compliance time involved with this
finding cracked barrel nuts at three of loaded correctly. action, this AD must be issued
the four wing front spar wing-to- • Replacing all hardware if the pre- immediately.
fuselage joints on one aircraft. All three load is incorrect. Because an unsafe condition exists
barrel nuts were from the suspect batch. • Doing repetitive visual inspections
that requires the immediate adoption of
Cracking of the barrel nuts, if not for cracking of the barrel nuts and
this AD, we find that notice and
detected and corrected, could result in cradles for airplanes on which the pre-
opportunity for prior public comment
reduced structural integrity of the wing- load is correct.
• Replacing all hardware for all hereon are impracticable and that good
to-fuselage attachments and consequent cause exists for making this amendment
detachment of the wing. cracked barrel nuts.
• Replacing all hardware for certain effective in less than 30 days.
Relevant Service Information affected barrel nuts that do not have Comments Invited
Bombardier has issued Alert Service cracking, which would end the
Bulletin A84–57–19, Revision A, dated repetitive inspections for those This AD is a final rule that involves
February 6, 2008. The service bulletin airplanes. This AD also provides an requirements affecting flight safety, and
describes the following procedures: optional replacement for all affected we did not provide you with notice and
• Determining whether the inboard barrel nuts. an opportunity to provide your
and outboard bolts are correctly pre- comments before it becomes effective.
Differences Between the AD and However, we invite you to send any
loaded. Canadian Emergency Airworthiness
• Replacing all hardware at locations written data, views, or arguments about
Directive this AD. Send your comments to an
where the pre-load is incorrect.
• Doing a visual inspection of the The Canadian emergency address listed under the ADDRESSES
barrel nut and cradle for cracking. airworthiness directive recommends section. Include ‘‘Docket No. FAA–
• Replacing cracked barrel nuts with accomplishing the inspection of the 2008–0167; Directorate Identifier 2008–
all new hardware. barrel nuts within 100 flight hours. We NM–029–AD’’ at the beginning of your
• Doing an inspection for certain have determined, however, that the comments. We specifically invite
markings of the barrel nuts. inspection must be done within 50 comments on the overall regulatory,
• Replacing barrel nuts having the flight hours to adequately address the economic, environmental, and energy
affected markings. unsafe condition. In developing an aspects of this AD. We will consider all
TCCA mandated the service bulletin appropriate compliance time for all comments received by the closing date
and issued Canadian emergency airplanes that are affected by this AD, and may amend this AD because of
airworthiness directive CF–2008–11, we considered not only the those comments.
dated February 5, 2008, to ensure the manufacturer’s recommendation, but We will post all comments we
continued airworthiness of these the degree of urgency associated with receive, without change, to http://
airplanes in Canada. addressing the subject unsafe condition, www.regulations.gov, including any
the average utilization of the affected personal information you provide. We
FAA’s Determination and Requirements fleet, and the time necessary to perform
of This AD will also post a report summarizing each
the required inspections. We have substantive verbal contact we receive
These airplanes are manufactured in coordinated this difference with TCCA. about this AD.
Canada and are type certificated for We consider this AD interim action.
operation in the United States under the We are currently considering requiring Authority for This Rulemaking
provisions of section 21.29 of the the replacement of all hardware for all
barrel nuts identified with a marking of Title 49 of the United States Code
Federal Aviation Regulations (14 CFR
LH7940T SPS 01, as required by the specifies the FAA’s authority to issue
21.29) and the applicable bilateral
Canadian emergency airworthiness rules on aviation safety. Subtitle I,
airworthiness agreement. Pursuant to
directive. However, the planned Section 106, describes the authority of
this bilateral airworthiness agreement,
compliance time for the replacement the FAA Administrator. Subtitle VII,
TCCA has kept the FAA informed of the
would allow enough time to provide Aviation Programs, describes in more
situation described above. We have
notice and opportunity for prior public detail the scope of the Agency’s
examined TCCA’s findings, evaluated
comment on the merits of the authority.
all pertinent information, and
determined that we need to issue an AD modification. In order to ensure We are issuing this rulemaking under
for products of this type design that are continued operational safety in the the authority described in Subtitle VII,
certificated for operation in the United interim, this AD requires repetitive Part A, Subpart III, Section 44701,
States. inspections for cracking of the suspect ‘‘General requirements.’’ Under that
Therefore, we are issuing this AD to barrel nuts every 100 flight hours until section, Congress charges the FAA with
detect and correct cracking of the barrel the replacement is done. promoting safe flight of civil aircraft in
nuts at the wing front spar wing-to- air commerce by prescribing regulations
FAA’s Justification and Determination for practices, methods, and procedures
fuselage joints, which could result in
of the Effective Date the Administrator finds necessary for
reduced structural integrity of the wing-
to-fuselage attachments and consequent Cracking of the barrel nuts at the wing safety in air commerce. This regulation
pwalker on PROD1PC71 with RULES

detachment of the wing. front spar wing-to-fuselage joints could is within the scope of that authority
This AD requires the following result in reduced structural integrity of because it addresses an unsafe condition
actions: the wing-to-fuselage attachments and that is likely to exist or develop on
• Inspecting all barrel nuts to consequent detachment of the wing. products identified in this rulemaking
determine if the barrel nuts have a Because of our requirement to promote action.

VerDate Aug<31>2005 16:56 Feb 12, 2008 Jkt 214001 PO 00000 Frm 00004 Fmt 4700 Sfmt 4700 E:\FR\FM\13FER1.SGM 13FER1
Federal Register / Vol. 73, No. 30 / Wednesday, February 13, 2008 / Rules and Regulations 8189

Regulatory Findings Unsafe Condition paragraph (f)(2) of this AD. Thereafter, repeat
(d) This AD results from reports of cracking the inspection at intervals not to exceed 50
We have determined that this AD will flight hours until the replacement specified
in the barrel nuts at the four primary front
not have federalism implications under spar wing-to-fuselage attachment joints. We in paragraph (g)(1)(ii) of this AD is done.
Executive Order 13132. This AD will are issuing this AD to detect and correct (ii) Within 100 flight hours after doing the
not have a substantial direct effect on cracking of the barrel nuts at the wing front inspection required by paragraph (f)(2)(ii) of
the States, on the relationship between spar wing-to-fuselage joints, which could this AD, replace all hardware at the left-hand
the national government and the States, result in reduced structural integrity of the outboard location and the right-hand
wing-to-fuselage attachments and consequent outboard location in accordance with the
or on the distribution of power and Accomplishment Instructions of Bombardier
responsibilities among the various detachment of the wing.
Alert Service Bulletin A84–57–19, Revision
levels of government. Compliance A, dated February 6, 2008. Replacing the
For the reasons discussed above, I (e) You are responsible for having the barrel nuts on the outboard locations
certify that the regulation: actions required by this AD performed within terminates the requirement to do the
1. Is not a ‘‘significant regulatory the compliance times specified, unless the repetitive inspections specified in paragraph
action’’ under Executive Order 12866; actions have already been done. (g)(1)(i) of this AD.
(iii) Within 100 flight hours after doing the
2. Is not a ‘‘significant rule’’ under the Inspections and Corrective Actions replacement required by paragraph (g)(1)(ii)
DOT Regulatory Policies and Procedures (f) Within 50 flight hours after the effective of this AD, repeat the inspection specified in
(44 FR 11034, February 26, 1979); and date of this AD, inspect all barrel nuts, part paragraph (f)(2) of this AD for the remaining
3. Will not have a significant number DSC228–16, to determine if the barrel nuts identified with a marking of
economic impact, positive or negative, barrel nuts are identified with a marking of LH7940T SPS 01. Thereafter, repeat the
on a substantial number of small entities LH7940T SPS 01. Inspect in accordance with inspection at intervals not to exceed 100
under the criteria of the Regulatory the Accomplishment Instructions of flight hours until the replacement of all
Bombardier Alert Service Bulletin A84–57– hardware at those locations is done. Do the
Flexibility Act. inspection and replacement in accordance
19, Revision A, dated February 6, 2008.
We prepared a regulatory evaluation (1) If no barrel nuts are identified with a with the Accomplishment Instructions of
of the estimated costs to comply with marking of LH7940T SPS 01, no further Bombardier Alert Service Bulletin A84–57–
this AD and placed it in the AD docket. actions are required by this paragraph. 19, Revision A, dated February 6, 2008.
See the ADDRESSES section for a location (2) If any barrel nut is found that is (2) If three barrel nuts having no cracking
to examine the regulatory evaluation. identified with a marking of LH7940T SPS are found, do the actions specified in
01, before further flight, inspect the inboard paragraphs (g)(2)(i), (g)(2)(ii), and (g)(2)(iii) of
List of Subjects in 14 CFR Part 39 and outboard bolts to determine if the bolts this AD.
are pre-loaded correctly. Inspect in (i) Within 50 flight hours after doing the
Air transportation, Aircraft, Aviation accordance with the Accomplishment inspection required by paragraph (f)(2)(ii) of
safety, Incorporation by reference, Instructions of Bombardier Alert Service this AD, repeat the inspection specified in
Safety. Bulletin A84–57–19, Revision A, dated paragraph (f)(2) of this AD. Thereafter, repeat
Adoption of the Amendment February 6, 2008. the inspection at intervals not to exceed 50
(i) If the pre-load is incorrect (i.e., the ring flight hours until the replacement specified
■ Accordingly, under the authority can be rotated), before further flight, replace in paragraph (g)(2)(ii) of this AD is done.
delegated to me by the Administrator, all hardware at that location in accordance (ii) Within 100 flight hours after doing the
with the Accomplishment Instructions of the inspection required by paragraph (f)(2)(ii) of
the FAA amends 14 CFR part 39 as
alert service bulletin. this AD, replace all hardware for one affected
follows: (ii) If the preload is correct, before further barrel nut at the outboard location, on the
flight, do a visual inspection for cracking of side with two affected barrel nuts, in
PART 39—AIRWORTHINESS the barrel nuts and cradles in accordance accordance with the Accomplishment
DIRECTIVES with the Accomplishment Instructions of the Instructions of Bombardier Alert Service
alert service bulletin. Bulletin A84–57–19, Revision A, dated
■ 1. The authority citation for part 39 (A) If no cracking of the barrel nut and February 6, 2008. Replacing the barrel nut on
continues to read as follows: cradle is found, do the applicable action the outboard location terminates the
Authority: 49 U.S.C. 106(g), 40113, 44701. required by paragraph (g) of this AD. requirement to do the repetitive inspections
(B) If no cracking of the barrel nut is found specified in paragraph (g)(2)(i) of this AD.
§ 39.13 [Amended] and only cracking of the cradle is found, no (iii) Within 100 flight hours after doing the
action is required by this paragraph provided replacement required by paragraph (g)(2)(ii)
■ 2. The Federal Aviation that the applicable corrective action specified of this AD, repeat the inspection specified in
Administration (FAA) amends § 39.13 in paragraph (g) of this AD is done. paragraph (f)(2) of this AD for the remaining
by adding the following new (C) If any cracking of the barrel nut is barrel nuts identified with a marking of
airworthiness directive (AD): found, before next flight, replace all LH7940T SPS 01. Thereafter, repeat the
2008–04–02 BOMBARDIER, INC. (FORMERLY DE hardware only at that location in accordance inspection at intervals not to exceed 100
HAVILLAND, INC.): Amendment 39–15374. with the Accomplishment Instructions of the flight hours until the replacement of all
Docket No. FAA–2008–0167; Directorate alert service bulletin. hardware at those locations is done. Do the
Identifier 2008–NM–029–AD. (g) For any barrel nuts on which no inspection and replacement in accordance
cracking of the barrel nut was found during with the Accomplishment Instructions of
Effective Date the inspection required by paragraph (f)(2)(ii) Bombardier Alert Service Bulletin A84–57–
(a) This AD becomes effective February 13, of this AD, do the applicable corrective 19, Revision A, dated February 6, 2008.
2008. action specified in paragraph (g)(1), (g)(2), (3) If two barrel nuts having no cracking
(g)(3), (g)(4), or (g)(5) of this AD at the are found and both nuts are on the same side,
Affected ADs compliance time specified in the applicable do the actions specified in paragraphs
(b) None. paragraph. (g)(3)(i), (g)(3)(ii), and (g)(3)(iii) of this AD.
(1) If four barrel nuts having no cracking (i) Within 100 flight hours after doing the
Applicability are found, do the actions specified in inspection required by paragraph (f)(2)(ii) of
pwalker on PROD1PC71 with RULES

(c) This AD applies to Bombardier Model paragraphs (g)(1)(i), (g)(1)(ii), and (g)(1)(iii) of this AD, repeat the inspection specified in
DHC–8–400, DHC–8–401, and DHC–8–402 this AD. paragraph (f)(2) of this AD. Thereafter, repeat
airplanes, certificated in any category; serial (i) Within 50 flight hours after doing the the inspection at intervals not to exceed 100
numbers 4001 and 4003 through 4176 inspection required by paragraph (f)(2)(ii) of flight hours until the replacement specified
inclusive. this AD, repeat the inspection specified in in paragraph (g)(3)(ii) of this AD is done.

VerDate Aug<31>2005 16:56 Feb 12, 2008 Jkt 214001 PO 00000 Frm 00005 Fmt 4700 Sfmt 4700 E:\FR\FM\13FER1.SGM 13FER1
8190 Federal Register / Vol. 73, No. 30 / Wednesday, February 13, 2008 / Rules and Regulations

(ii) Within 500 flight hours after doing the of this AD and on which no barrel nuts were Material Incorporated by Reference
inspection required by paragraph (f)(2)(ii) of found that were identified with a marking of (o) You must use Bombardier Alert Service
this AD, replace all hardware for one affected LH7940T SPS 01: No further action is
barrel nut at the outboard location that has Bulletin A84–57–19, Revision A, dated
required by this AD.
two affected barrel nuts in accordance with February 6, 2008, to perform the actions that
the Accomplishment Instructions of Parts Installation are required by this AD, unless the AD
Bombardier Alert Service Bulletin A84–57– (k) As of the effective date of this AD, no specifies otherwise. The Director of the
19, Revision A, dated February 6, 2008. person may install a barrel nut, part number Federal Register approved the incorporation
Replacing the barrel nut on the outboard DSC228–16, identified with a marking of by reference of this document in accordance
location terminates the requirement to do the LH7940T SPS 01, on any airplane. with 5 U.S.C. 552(a) and 1 CFR part 51.
repetitive inspections specified in paragraph Contact Bombardier, Inc., Bombardier
(g)(3)(i) of this AD. Special Flight Permit
Regional Aircraft Division, 123 Garratt
(iii) Within 100 flight hours after doing the (l) Special flight permits, as described in
replacement required by paragraph (g)(3)(ii) Boulevard, Downsview, Ontario M3K 1Y5,
Section 21.197 and Section 21.199 of the
of this AD, repeat the inspection specified in Canada, for a copy of this service
Federal Aviation Regulations (14 CFR 21.197
paragraph (f)(2) of this AD for the remaining and 21.199), may be issued to operate the information. You may review copies at the
barrel nut identified with a marking of airplane to a location where the requirements FAA, Transport Airplane Directorate, 1601
LH7940T SPS 01. Thereafter, repeat the of this AD can be accomplished but Lind Avenue, SW., Renton, Washington; or at
inspection at intervals not to exceed 100 concurrence by the Manager, New York the National Archives and Records
flight hours until the replacement of all Aircraft Certification Office, FAA, is required Administration (NARA). For information on
hardware at that location is done. Do the prior to issuance of the special flight permit. the availability of this material at NARA, call
inspection and replacement in accordance Before using any approved special flight 202–741–6030, or go to: http://
with the Accomplishment Instructions of permits, notify your appropriate principal www.archives.gov/federal-register/cfr/ibr-
Bombardier Alert Service Bulletin A84–57– inspector (PI) in the FAA Flight Standards
19, Revision A, dated February 6, 2008. locations.html.
District Office (FSDO), or lacking a PI, your
(4) If two barrel nuts having no cracking local FSDO. Special flight permits may be Issued in Renton, Washington, on February
are found and are on opposite sides, within permitted provided that the conditions 7, 2008.
100 flight hours after doing the inspection specified in paragraph (l)(1), (l)(2), (l)(3),
required by paragraph (f)(2)(ii) of this AD, Kevin Hull,
(l)(4), and (l)(5) of this AD are met.
repeat the inspection specified in paragraph Acting Manager, Transport Airplane
(1) Both the right-hand side and left-hand
(f)(2) of this AD. Thereafter, repeat the Directorate, Aircraft Certification Service.
side of the airplane must have at least one
inspection at intervals not to exceed 100 [FR Doc. E8–2747 Filed 2–12–08; 8:45 am]
barrel nut that is not within the suspect batch
flight hours until the replacement of all
(i.e., barrel nut is not identified with a BILLING CODE 4910–13–P
hardware at those locations is done. Do the
marking of LH7940T SPS 01). The barrel nuts
inspection and replacement in accordance
that are not within the suspect batch must be
with the Accomplishment Instructions of
in good working condition (i.e., no cracking
Bombardier Alert Service Bulletin A84–57–
of the barrel nut). DEPARTMENT OF ENERGY
19, Revision A, dated February 6, 2008.
(2) No passengers and no cargo are
(5) If one barrel nut having no cracking is
onboard.
found, within 100 flight hours after doing the Federal Energy Regulatory
inspection required by paragraph (f)(2)(ii) of (3) Airplane must operate in fair weather
conditions with a low risk of turbulence. Commission
this AD, repeat the inspection specified in
paragraph (f)(2) of this AD. Thereafter, repeat (4) Airplane must operate with reduced
the inspection at intervals not to exceed 100 airspeed. For further information, contact 18 CFR Part 157
flight hours until the replacement of all Bombardier, Q Series 24 Hour Service
hardware at that location is done. Do the Customer Response Center, at: Tel: 1–416–
[Docket No. RM81–19–000]
inspection and replacement in accordance 375–4000; Fax: 1–416–375–4539; E-mail:
with the Accomplishment Instructions of thd.qseries@aero.bombardier.com.
(5) All of the conditions specified in Natural Gas Pipelines; Project Cost
Bombardier Alert Service Bulletin A84–57– and Annual Limits
19, Revision A, dated February 6, 2008. paragraphs (l)(1), (l)(2), (l)(3), and (l)(4) of
this AD are on a case-by-case basis. Contact
Optional Replacement your appropriate principal inspector (PI) in February 5, 2008.
(h) Replacement of all hardware for all the FAA Flight Standards District Office AGENCY:Federal Energy Regulatory
barrel nuts, part number DSC228–16, (FSDO), or lacking a PI, your local FSDO, for Commission, DOE.
identified with a marking of LH7940T SPS assistance.
01, constitutes terminating action for this AD. ACTION: Final rule.
Alternative Methods of Compliance
Replacement must be done in accordance (AMOCs)
with the Accomplishment Instructions of SUMMARY: Pursuant to the authority
Bombardier Alert Service Bulletin A84–57– (m)(1) The Manager, New York Aircraft
Certification Office, FAA, has the authority to delegated by 18 CFR 375.308(x)(1), the
19, Revision A, dated February 6, 2008.
approve AMOCs for this AD, if requested in Director of the Office of Energy Projects
Actions Accomplished According to accordance with the procedures found in 14 (OEP) computes and publishes the
Previous Issue of Alert Service Bulletin CFR 39.19. project cost and annual limits for
(i) Actions accomplished before the (2) To request a different method of natural gas pipelines blanket
effective date of this AD in accordance with compliance or a different compliance time construction certificates for each
Bombardier Alert Service Bulletin A84–57– for this AD, follow the procedures in 14 CFR
19, dated February 1, 2008, are acceptable for 39.19. Before using any approved AMOC on calendar year.
compliance with the corresponding actions any airplane to which the AMOC applies, DATES: This final rule is effective
specified in this AD. notify your appropriate principal inspector February 13, 2008 and establishes cost
(PI) in the FAA Flight Standards District
Actions Accomplished According to Office (FSDO), or lacking a PI, your local limits applicable from January 1, 2008
Bombardier Alert Service Bulletin A84–57– FSDO. through December 31, 2008.
pwalker on PROD1PC71 with RULES

18
Related Information FOR FURTHER INFORMATION CONTACT:
(j) For airplanes on which the actions
specified in Bombardier Alert Service (n) Canadian emergency airworthiness Michael J. McGehee, Chief, Certificates
Bulletin A84–57–18, dated January 16, 2008, directive CF–2008–11, dated February 5, Branch 1, Division of Pipeline
were accomplished before the effective date 2008. Certificates, (202) 502–8962.

VerDate Aug<31>2005 16:56 Feb 12, 2008 Jkt 214001 PO 00000 Frm 00006 Fmt 4700 Sfmt 4700 E:\FR\FM\13FER1.SGM 13FER1