Вы находитесь на странице: 1из 5

JOB HAZARD ANALYSIS

PNCP MEG PROJECT, EPCC - 10.


PROJECT COMPANY RESIDENT SITE MANAGER
SITE ENGINEER / SUPERVISOR
PNCP MEG Project SECL Mr. Y. H. OH Mr. Song & Rizwan Ahmed M. Ramu, Sandeep Dahi
ya , Sanjeev Kumar. Confined Space
DATE EQUIPMENT INVOLVED PPE / SAFETY DEVICE REQUIRED TEAM MEMBER PERMIT REQUIRED
JHA NO.
7/18/2008
Helmet, shoe, Hand glove, Full body harness, Gas tester, exhaust fan, Blower, et
c. Supervisor, HSE, Workers, Fitter, welder, Others. Yes 7
HSE ENGINEER ACTIVITY DESCRIPTION
ACTIVITY
HAZARD
RISK CONTROL MEASURES
RESPONSIBILITY
* Lack of proper breathing * Prior to starting work, a confined space entry * Su
pervisor / HSE atmosphere or toxic substances - permit must be obtained from saf
ety department. asphyxiation * Gas test shall be done and ensure that oxygen 1.
Work in Confined Space Prior to * De-hydration level is meet with required 19.5%
which is ideal for start any work, work permit is human being breathing. requir
ed. * First person who is going inside must wear self breathing apparatus. * Fal
ling objects i.e. steel pipes / hanger, scaffold fittings,planks,etc. * Job supe
rvisor and other related persons at the * Scaffolding Supervisor / HSE / Rigger
work site. * All other persons not associated with the scaffold erection do not
enter in erection area. * Scaffold area to be cordoned off with barrier, etc and
warning sign provided i.e. "keep out". * No scaffold shall be erected, moved ac
cept under the supervision of competent scaffold. * All scaffold work done by ex
perienced and skilled scaffold crew only. * During assembly of scaffold tie of s
eparate ledger that are locked in to place. * Inspection made by competent scaff
old supervisor prior to use. If acceptable then use Green Tag, during erection u
se Red and same in dismantling. * Scaffold must not be use until the Green Scaff
Tag has been issued and displayed on scaffold. * Appropriate PPE to be worn at
all the time i.e. Helmet, safety shoe, Goggles, Full body harness, etc. and atta
ched to a strong fixing point.
2. Scaffold erection.

ACTIVITY
HAZARD
RISK CONTROL MEASURES
RESPONSIBILITY
3. Work procedure.
* Confined space entry permit system shall be followed strictly before entry int
o the work area. * Supervisor / HSE * Proper ventilation by blower and lighting
no less than 53 lux no shadows arrangement shall be provided. * All vessel must
be ventilated and have a constant flow of moving air before a permit issued. * G
as test limit for a normal vessel entry are oxygen 19.5% , combustible gas at 0%
, and Hydrogen Sulphide at 0 PPM. * Gas test are not in normal range and their u
rgent work, respirators, protective clothing and forced air ventilation shall be
required. * The result of gas test and special precautions must be recorded on
the vessel entry permit and gas test sheet. * Gas test required and provided by
safety department as necessary.
* For Lifting arrangement 24V (Flame Proof) power supply or lighting only allowe
d with proper * Supervisor / HSE / Rigger grounding system. No 240V power supply
allowed at any case inside the confined space. * All worker should have PPE acc
ording to entry permit, additional if required. * Daily specific task Tool box m
eeting shall be conduct prior to start. * Daily checking list shall be prepared
by job supervisor to ensure the safe working condition and share the counter mea
sures whicg is involved in day activity. * Rescue system etc. to be place during
confined space working. * Appropriate safety sign / signals board to be provide
d during work for clear understanding to all of them who are working at MEG site
and PNCP in confined space. * Assigned one guide men to maintain the in and out
record for all persons who are working inside. Frequancy should be maintained i
n ragister. * Working areas to display sign stating "Danger" "Work in Progress"

ACTIVITY
HAZARD
* Falling workers during scaffold dismantling * Falling objects like steel pipes
, clamps, tools and other materials * Struck by flying materials
RISK CONTROL MEASURES
RESPONSIBILITY
4. Scaffold Dismantling
* No scaffold shall be dismantled, or altered except * Scaffolding Supervisor /
Rigger under the supervision of competent person. * Install specific ladder and
other temporary facilities in accordance with the work safety plan and IOCL/EIL
Safety rule & regulations. * All scaffold material to be lowered to the ground b
y rope only, not thrown down. * Dismantle the scaffold don't demolish it. materi
al to be inspect prior to use. Every week inspection required by competent perso
n or job supervisor and fill the green tag with remarks. * During dismantling ti
e of to separate and secured ledger that are locked in place. * All scaffold wor
k done by experience and skilled scaffold only. * Scaffold must not be Red Scaff
Tag has been issued and displayed on scaffold during dismantling. * Appropriate
PPE to be worn at all the time i.e. Helmet, safety shoe, Goggles, Full body har
ness, etc. and attached to a strong fixing point.
* Fall of Material * Fall of Tools 5. Installation of Tray (Inside)
* All tools and tackles shall be inspected and approved by SECL Safety personnel
. * Hand tools must be tied-off with rope to prevent from falling down. * As the
installation sequence starting from bottom the lower level tray manhole must be
covered temporarily. * Drinking water, Toilet at near by area, etc. * First aid
box Job supervisor / HSE
6. Welfare / Medical Facility
* Drinking Water, Toilets, etc * Injury, Etc. * Incident / Accident, etc.
7. Emergency Response
* Rescue system etc to be place during confined space working. * Appropriate saf
ety sign / signals board to be provided during work for clear understanding to a
ll of them who are working at MEG site and PNCP in confined space. * Assigned on
e guide men to maintain the in and out record for all persons who are working in
side. Supervisor / HSE Frequency should be maintained in register. * Supervisor
should know the emergency contact numbers, assembly point and IOCL First aid cen
ter. * Standby vehicle required during working time.

ACTIVITY
Checked / Reviewed By:
HAZARD
RISK CONTROL MEASURES
RESPONSIBILITY

Вам также может понравиться