5538 Federal Register / Vol. 73, No.

20 / Wednesday, January 30, 2008 / Notices

to serve a copy of that document on must submit to the Commission, on or ‘‘PROTEST’’, and ‘‘MOTION TO
each person in the official service list before a specified comment date for the INTERVENE’’, as applicable, and the
for the project. Further, if an intervenor particular application, either a Project Number of the particular
files comments or documents with the competing development application or a application to which the filing refers.
Commission relating to the merits of an notice of intent to file such an Any of the above-named documents
issue that may affect the responsibilities application. Submission of a timely must be filed by providing the original
of a particular resource agency, they notice of intent to file a development and the number of copies provided by
must also serve a copy of the document application allows an interested person the Commission’s regulations to: The
on that resource agency. to file the competing application no Secretary, Federal Energy Regulatory
k. Description of Project: The later than 120 days after the specified Commission, 888 First Street, NE.,
proposed project would utilize the comment date for the particular Washington, DC 20426. An additional
existing U.S. Army Corps of Engineers’ application. A competing license copy must be sent to Director, Division
Wright Patman Dam and would consist application must conform with 18 CFR of Hydropower Administration and
of: (1) A proposed 339-foot-long, 144- 4.30 and 4.36. Compliance, Federal Energy Regulatory
inch-diameter steel penstock; (2) a p. Notice of Intent—A notice of intent Commission, at the above-mentioned
proposed powerhouse containing one must specify the exact name, business address. A copy of any notice of intent,
generating unit with an installed address, and telephone number of the competing application or motion to
capacity of 5-megawatts; (3) a prospective applicant, and must include intervene must also be served upon each
switchyard; (4) a proposed 2-mile-long, an unequivocal statement of intent to representative of the Applicant
25-kV transmission line; and (5) submit, if such an application may be specified in the particular application.
appurtenant facilities. The proposed filed, either a preliminary permit t. Agency Comments—Federal, state,
project would have an estimated annual application or a development and local agencies are invited to file
generation of approximately 16- application (specify which type of comments on the described application.
gigawatts and would be sold to a local application). A notice of intent must be A copy of the application may be
utility. served on the applicant(s) named in this obtained by agencies directly from the
l. Location of Application: A copy of public notice. Applicant. If an agency does not file
the application is available for q. Proposed Scope of Studies Under comments within the time specified for
inspection and reproduction at the Permit—A preliminary permit, if issued, filing comments, it will be presumed to
Commission in the Public Reference does not authorize construction. The have no comments. One copy of an
Room, located at 888 First Street, NE., term of the proposed preliminary permit agency’s comments must also be sent to
Room 2A, Washington, DC 20426, or by would be 36 months. The work the Applicant’s representatives.
calling (202) 502–8371. This filing may proposed under the preliminary permit
also be viewed on the Commission’s would include economic analysis, Kimberly D. Bose,
Web site at http://www.ferc.gov using preparation of preliminary engineering Secretary.
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental [FR Doc. E8–1631 Filed 1–29–08; 8:45 am]
number excluding the last three digits in impacts. Based on the results of these BILLING CODE 6717–01–P
the docket number field to access the studies, the Applicant would decide
document. For assistance, call toll-free whether to proceed with the preparation
1–866–208–3676 or e-mail of a development application to DEPARTMENT OF ENERGY
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.
call (202) 502–8659. A copy is also r. Comments, Protests, or Motions To Federal Energy Regulatory
available for inspection and Intervene—Anyone may submit Commission
reproduction at the address in item h comments, a protest, or a motion to [Docket No. CP08–52–000]
above. intervene in accordance with the
m. Individuals desiring to be included requirements of Rules of Practice and Caledonia Energy Partners, L.L.C.;
on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214. Notice of Application
so indicate by writing to the Secretary In determining the appropriate action to
of the Commission. take, the Commission will consider all January 24, 2008.
n. Competing Preliminary Permit— protests or other comments filed, but Take notice that on January 14, 2008,
Anyone desiring to file a competing only those who file a motion to Caledonia Energy Partners, L.L.C.
application for preliminary permit for a intervene in accordance with the (Caledonia), 2001 Timber Creek Road,
proposed project must submit the Commission’s Rules may become a Flower Mound, TX 75028, filed in
competing application itself, or a notice party to the proceeding. Any comments, Docket No. CP08–52–000, an
of intent to file such an application, to protests, or motions to intervene must application under section 7(c) of the
the Commission on or before the be received on or before the specified Natural Gas Act (NGA), to expand the
specified comment date for the comment date for the particular Caledonia Storage Facility by
particular application (see 18 CFR 4.36). application. developing a depleted production
Submission of a timely notice of intent Comments, protests and interventions reservoir as an additional gas storage
allows an interested person to file the may be filed electronically via the field; constructing a pipeline lateral to
competing preliminary permit Internet in lieu of paper. See 18 CFR connect the new field with the existing
application no later than 30 days after 385.2001(a)(1)(iii) and the instructions storage facility; and installation of a
the specified comment date for the on the Commission’s Web site at http:// total of 10,000 Hp of additional
particular application. A competing www.ferc.gov under the ‘‘e-Filing’’ link. compression which will allow
mstockstill on PROD1PC66 with NOTICES

preliminary permit application must s. Filing and Service of Responsive Caledonia to increase its maximum
conform with 18 CFR 4.30 and 4.36. Documents—Any filings must bear in allowable operating pressure to 2,518
o. Competing Development all capital letters the title psia. The expanded facilities will
Application—Any qualified ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT increase Caledonia’s maximum total
development applicant desiring to file a TO FILE COMPETING APPLICATION’’, storage capacity from 11.7 Bcf to 16.9
competing development application ‘‘COMPETING APPLICATION’’, Bcf and its maximum daily withdrawal

VerDate Aug<31>2005 18:49 Jan 29, 2008 Jkt 214001 PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 E:\FR\FM\30JAN1.SGM 30JAN1
Federal Register / Vol. 73, No. 20 / Wednesday, January 30, 2008 / Notices 5539

rate from 330 MMcf/d to 477 MMcf/d, the applicant and to every other party in Comment Date: February 14, 2008.
all as more fully set forth in the the proceeding. Only parties to the
Kimberly D. Bose,
application which is on file with the proceeding can ask for court review of
Commission and open to public Commission orders in the proceeding. Secretary.
inspection. This filing may also be However, a person does not have to [FR Doc. E8–1623 Filed 1–29–08; 8:45 am]
viewed on the Commission’s Web site at intervene in order to have comments BILLING CODE 6717–01–P
http://www.ferc.gov using the considered. The second way to
‘‘eLibrary’’ link. Enter the docket participate is by filing with the
number, excluding the last three digits, Secretary of the Commission, as soon as DEPARTMENT OF ENERGY
in the docket number field to access the possible, an original and two copies of
comments in support of or in opposition Federal Energy Regulatory
document. For assistance, call (202)
to this project. The Commission will Commission
502–8659 or TTY, (202) 208–3676.
Any questions regarding this consider these comments in [Docket No. DI08–1–000]
application should be directed to Jim determining the appropriate action to be
Goetz, Caledonia Energy Partners, taken, but the filing of a comment alone City of Aspen; Notice of Declaration of
L.L.C., 2001 Timber Creek Road, Flower will not serve to make the filer a party Intention and Soliciting Comments,
Mound, Texas 75028, at (972) 691–3332, to the proceeding. The Commission’s Protests, and/or Motions To Intervene
or by fax at (972) 874–8743, or rules require that persons filing
January 24, 2008.
Christopher A. Schindler, Hogan & comments in opposition to the project
Hartson L.L.P., 555 Thirteenth Street, provide copies of their protests only to Take notice that the following
NW., Washington, DC 20004, at (202) the party or parties directly involved in application has been filed with the
637–5723, or by fax at (202) 637–5910. the protest. Commission and is available for public
Pursuant to Section 157.9 of the Persons who wish to comment only inspection:
Commission’s rules, 18 CFR 157.9, on the environmental review of this a. Application Type: Declaration of
within 90 days of this Notice the project should submit an original and Intention.
Commission staff will either: Complete two copies of their comments to the b. Docket No: DI08–1–000.
its environmental assessment (EA) and Secretary of the Commission. c. Date Filed: January 7, 2008.
place it into the Commission’s public Environmental commentors will be d. Applicant: City of Aspen, CO.
record (eLibrary) for this proceeding; or placed on the Commission’s e. Name of Project: Castle Creek
issue a Notice of Schedule for environmental mailing list, will receive Hydroelectric Project.
Environmental Review. If a Notice of copies of the environmental documents, f. Location: The proposed Castle
Schedule for Environmental Review is and will be notified of meetings Creek Hydroelectric Project will be
issued, it will indicate, among other associated with the Commission’s located on Castle Creek within the city
milestones, the anticipated date for the environmental review process. of Aspen’s existing water transmission
Commission staff’s issuance of the final Environmental commentors will not be system, in Pitkin County, in Aspen,
environmental impact statement (FEIS) required to serve copies of filed Colorado.
or EA for this proposal. The filing of the documents on all other parties. g. Filed Pursuant to: Section 23(b)(1)
EA in the Commission’s public record However, the non-party commentors of the Federal Power Act, 16 U.S.C.
for this proceeding or the issuance of a will not receive copies of all documents 817(b).
Notice of Schedule for Environmental filed by other parties or issued by the h. Applicant Contact: Richard Smart,
Review will serve to notify federal and Commission (except for the mailing of Community Hydropower Consulting,
state agencies of the timing for the environmental documents issued by the LLC, P. O. Box 1091, Fort Collins, CO
completion of all necessary reviews, and Commission) and will not have the right 80522; telephone: (970) 221–4474; fax:
the subsequent need to complete all to seek court review of the (970) 221–0095; e-mail: http://www.r_
federal authorizations within 90 days of Commission’s final order. smart@communityhydro.com.
the date of issuance of the Commission The Commission strongly encourages i. FERC Contact: Any questions on
staff’s FEIS or EA. electronic filings of comments, protests this notice should be addressed to
There are two ways to become and interventions in lieu of paper using Henry Ecton, (202) 502–8768, or E-mail
involved in the Commission’s review of the ‘‘eFiling’’ link at http:// address: henry.ecton@ferc.gov.
this project. First, any person wishing to www.ferc.gov. Persons unable to file j. Deadline for filing comments,
obtain legal status by becoming a party electronically should submit an original protests, and/or motions: February 25,
to the proceedings for this project and 14 copies of the protest or 2008.
should, on or before the comment date intervention to the Federal Energy All documents (original and eight
stated below, file with the Federal Regulatory Commission, 888 First copies) should be filed with: Kimberly
Energy Regulatory Commission, 888 Street, NE., Washington, DC 20426. D. Bose, Secretary, Federal Energy
First Street, NE., Washington, DC 20426, This filing is accessible on-line at Regulatory Commission, 888 First
a motion to intervene in accordance http://www.ferc.gov, using the Street, NE., Washington, DC 20426.
with the requirements of the ‘‘eLibrary’’ link and is available for Comments, protests, and/or
Commission’s Rules of Practice and review in the Commission’s Public interventions may be filed electronically
Procedure (18 CFR 385.214 or 385.211) Reference Room in Washington, DC. via the Internet in lieu of paper. See, 18
and the Regulations under the NGA (18 There is an ‘‘eSubscription’’ link on the CFR 385.2001(a)(1)(iii) and the
CFR 157.10). A person obtaining party Web site that enables subscribers to instructions on the Commission’s Web
status will be placed on the service list receive e-mail notification when a site at http://www.ferc.gov under the ‘‘e-
mstockstill on PROD1PC66 with NOTICES

maintained by the Secretary of the document is added to a subscribed Filing link. Please include the docket
Commission and will receive copies of docket(s). For assistance with any FERC number (DI08–1–000) on any comments,
all documents filed by the applicant and Online service, please e-mail protests, and/or motions filed.
by all other parties. A party must submit FERCOnlineSupport@ferc.gov, or call k. Description of Project: The
14 copies of filings made with the (866) 208–3676 (toll free). For TTY, call proposed Castle Creek Hydroelectric
Commission and must mail a copy to (202) 502–8659. Project will include: (1) A run-of-river