Академический Документы
Профессиональный Документы
Культура Документы
February 2011
Saskatchewans
160
140
GBN-V
With initial production underway at the rate of 400 tonnes per day
(tpd), for 45,000 ounces per year, we are moving toward building
additional production capacity from our Komis and EP deposits in
2011 to 700 tpd and up to 70,000 ounces gold per year. With a fourth
mine planned at Golden Heart in 2013, the production target is for up
to 100,000 ounces of gold per year (1,000 tpd).
120
100
80
60
40
20
source: Yahoo Finance
0
2010 Mar
Apr
May
Jun
Jul
Aug
Dec
Jan
Preparing the furance for the first gold pour, Jolu Mill, .
La Ronge Gold Project, January 12th, 2011.
GOLD Resources
Summary of Measured & Indicated, and Inferred Mineral Resources for Golden Band Owned Gold Deposits as at April 2010 (NI 43-101 compliant)
Deposit
Roy Lloyd Mine
(Bingo deposit)
EP
Komis
Golden Heart
Corner Lake
Birch Crossing
Memorial
Tower East
*Greywacke
Date
Author
Grade Capping
May 09
Nov 08
Dec 09
Dec 09
Mar 10
Dec 07
Mar 06
Dec 07
Apr 08
In-House
P&E
In-House
In-House
Simpson
Simpson
Simpson
In-House
Wardrop
cut off .
g/t Au
tonnes
grade .
g/t Au
resources
ounces Au
cut off .
g/t Au
40 g/t Au
115g/t Au
uncapped
30 g/t Au
120 g/t Au
30 g/t Au
15 g/t Au
33.15 g/t Au
Mineral resources are not mineral reserves and by definition do not demonstrate economic
viability. Does not include Golden Bands Niko/Kaslo or Decade gold deposits.
5.0
1.0
4.0
4.0
5.0
2.0
1.0
1.0
5.0
174,668
102,000
191,740
13.14
3.81
7.85
73,777
12,494
48,398
288,400
2.83
26,220
5,019,080
1.86
299,835
90,160
8.4
24,353
Measured + Indicated Resources
Total
5,866,048
485,077
* Golden Band owns 49% of the Greywacke gold deposit and only that portion is included in the table.
tonnes
grade .
g/t Au
resources
ounces Au
Inferred Resources
5.0
1.0
4.0
4.0
5.0
2.0
1.0
1.0
5.0
155,074
13.89
10,746
7.91
671,650
9.1
184,400
8.07
536,300
5.11
90,900
2.49
902,020
1.52
28,420
7.29
Inferred Resources
2,579,510
67,756
2,731
196,549
47,900
88,100
7,272
43,965
6,664
460,937
Change (%)
First Dor Gold Bar Roy Lloyd Mine, La Ronge Gold Project, .
January 12th, 2011. 15.9 Kilograms (approximately 500 troy ounces).
Our 100%-owned Komis deposit is a past gold producer, and now has
an updated geological model and corresponding mineral resource
estimate based on a high-grade, underground mining scenario. Komis
has the potential for near-term development and as importantly, the new
geological model clearly demonstrates that excellent potential exists for
these multiple high-grade zones to continue to depth and along strike.
Recent drilling has intersected grades of up to 120 g/t gold over 1.5 m.
Director
Community
Engagement
A. Robson Garden QC
Director
Investor Relations
Tony Perri 604.682.6852
Raju Wani 403.240.0555
info@goldenbandresources.com
Printed in Canada