FOUNDATIONS .
THE CONSULTANT: SNOHETTA OVERSEASE ARCHITECTUREAL AS
THE MAIN CONTRACTOR: OMAN SHAPOORJI.
THE PILING CONTRACTOR: TMF EURO FOUNDATIONS.
Dubai:
P. O. Box 83834
Tel.: .+971 4 298 0942
Fax: +971 4 298 0953
E-mail: ama@tmfeuro.ae
Sharjah:
P. O. Box 95177
Tel. : +971 6 535 3390
Fax : +971 6 535 3391
E-mail : info@tmfeuro.ae
Egypt:
P192 Ismailia, Egypt
Tel.: +20 64 391 3343
Fax : +20 64 391 3344
Oman:
P. O. Box 211 Ruwi
P.C. 112 Muscat, Oman
Tel. : +968 2 458 2556
Fax : +968 2 458 2560
PROJECT
CLIENT
:MUSCAT MUNICIPALITY
CONSULTANT
PILING CONTRACTOR
Rev.
Sub. Date:
14 MARCH
2012
Dubai:
P. O. Box 83834
Tel.: .+971 4 298 0942
Fax: +971 4 298 0953
E-mail: ama@tmfeuro.ae
Amendment Details
Sharjah:
P. O. Box 95177
Tel. : +971 6 535 3390
Fax : +971 6 535 3391
E-mail : info@tmfeuro.ae
Egypt:
P192 Ismailia, Egypt
Tel.: +20 64 391 3343
Fax : +20 64 391 3344
Prepared By
Approved By
REEM M.
AMA
Oman:
P. O. Box 211 Ruwi
P.C. 112 Muscat, Oman
Tel. : +968 2 458 2556
Fax : +968 2 458 2560
1.0
GENERAL:
1.1
Introduction
This method statement is given as a general guidance for conducting the works
and their sequence. However, during their execution, variations may be adopted to
suit unforeseen conditions, within the framework of the Specifications, and in
accordance with the Engineers directions.
1.2
Scope of Works
This method statement outlines the procedures for construction of Stone Columns
using Rammed Aggregate Pier to enhance the soil shear strength and bearing
capacity. By introducing the rammed pier will increase the composite strength and
stuffiness of the compressible soil. The piers exhibit a high angle of internal friction
that increase the shearing resistance to control the stability of the structure.
1.2.1 Execution of the stone columns as per the designed approved Drawings and as
per project particular Specifications and standards.
1.2.2 Conducting four number of Plate Load tests.
1.2.3 Conducting Single Zone Load Test.
Separate method statements for items 1.2.2 &1.2.3 will be submitted upon
identifying the test location by the Engineer
Dubai:
P. O. Box 83834
Tel.: .+971 4 298 0942
Fax: +971 4 298 0953
E-mail: ama@tmfeuro.ae
Sharjah:
P. O. Box 95177
Tel. : +971 6 535 3390
Fax : +971 6 535 3391
E-mail : info@tmfeuro.ae
Egypt:
P192 Ismailia, Egypt
Tel.: +20 64 391 3343
Fax : +20 64 391 3344
Oman:
P. O. Box 211 Ruwi
P.C. 112 Muscat, Oman
Tel. : +968 2 458 2556
Fax : +968 2 458 2560
2.0
SITE PREPARATION:
2.1
2.2
Site Installation:
Site installations will be established in the allocated area. The allocated area will be
maintained in a dry neat and orderly condition.
2.3
Survey Works:
The provision of main grid lines & Bench marks at all stone columns location shall
be made by the Main Contractor
2.4
TMF will provide Main Contractor with a daily sequence for the stone column
installation sequence during the next day,
The installation will start from the inner column to the outer one, to ensure the whole
designated area compacted and the columns reach to the desired level, or the
ground reach to the refusal i.e. the ground is properly compacted for which the soil
bearing capacity, shear strength, and the settlement have been improved
Dubai:
P. O. Box 83834
Tel.: .+971 4 298 0942
Fax: +971 4 298 0953
E-mail: ama@tmfeuro.ae
Sharjah:
P. O. Box 95177
Tel. : +971 6 535 3390
Fax : +971 6 535 3391
E-mail : info@tmfeuro.ae
Egypt:
P192 Ismailia, Egypt
Tel.: +20 64 391 3343
Fax : +20 64 391 3344
Oman:
P. O. Box 211 Ruwi
P.C. 112 Muscat, Oman
Tel. : +968 2 458 2556
Fax : +968 2 458 2560
The unique installation process displaces soil during installation and utilizes vertical
impact ramming energy to construct vertical displacement RAPs, which exhibit
unsurpassed strength and stiffness. The installation procedure produces lateral
compaction and pre-stressing and pre-straining of the surrounding matrix soil. RAP
solutions are designed to provide total and differential settlement control and increase
bearing support to meet project requirements.
The Impact System Method
3.1 The cavity is created to full designed depth by pushing a specially designed
mandrel and tamper foot using a relatively large static force augmented by dynamic
impact energy. Tamper nominal foot diameters as per the design piers diameters and
design depth measured from the bench mark level or the ground refuse level ,
depending on design requirements. This method eliminates spoils as all penetrated
soils are displaced laterally. The bottom flappers prevents soil from entering to the
hollow stem pipe
3.2 After driving to design depth, the hollow mandrel serves as a conduit for the
placement of aggregate. The aggregate is placed inside the mandrel and the mandrel
is lifted, the bottom of the pier. The tamper foot is lifted approximately 1 meter and
then driven back down 0.7 meter, forming a 0.3 meter thick compacted lift.
The compaction is achieved through static force and dynamic impact energy from the
hammer. The Impact hammer densifay the aggregate vertically and the foot forces
aggregate laterally into cavity sidewalls. This results in excellent coupling with
surrounding soils and reliable settlement control and superior strength and stiffness.
Following installation, vertical displacement RAPs support shallow foundations,
The footing stresses are attracted to the stiff RAPs, resulting in engineered settlement
control.
Dubai:
P. O. Box 83834
Tel.: .+971 4 298 0942
Fax: +971 4 298 0953
E-mail: ama@tmfeuro.ae
Sharjah:
P. O. Box 95177
Tel. : +971 6 535 3390
Fax : +971 6 535 3391
E-mail : info@tmfeuro.ae
Egypt:
P192 Ismailia, Egypt
Tel.: +20 64 391 3343
Fax : +20 64 391 3344
Oman:
P. O. Box 211 Ruwi
P.C. 112 Muscat, Oman
Tel. : +968 2 458 2556
Fax : +968 2 458 2560
Dubai:
P. O. Box 83834
Tel.: .+971 4 298 0942
Fax: +971 4 298 0953
E-mail: ama@tmfeuro.ae
Sharjah:
P. O. Box 95177
Tel. : +971 6 535 3390
Fax : +971 6 535 3391
E-mail : info@tmfeuro.ae
Egypt:
P192 Ismailia, Egypt
Tel.: +20 64 391 3343
Fax : +20 64 391 3344
Oman:
P. O. Box 211 Ruwi
P.C. 112 Muscat, Oman
Tel. : +968 2 458 2556
Fax : +968 2 458 2560
4.0
5.00
SITE CLEANLINESS:
Care will be taken to keep the site in good condition. Any remaining aggregate for the
operation will be removed from the site by the main contractor
6.0
Dubai:
P. O. Box 83834
Tel.: .+971 4 298 0942
Fax: +971 4 298 0953
E-mail: ama@tmfeuro.ae
Sharjah:
P. O. Box 95177
Tel. : +971 6 535 3390
Fax : +971 6 535 3391
E-mail : info@tmfeuro.ae
Egypt:
P192 Ismailia, Egypt
Tel.: +20 64 391 3343
Fax : +20 64 391 3344
Oman:
P. O. Box 211 Ruwi
P.C. 112 Muscat, Oman
Tel. : +968 2 458 2556
Fax : +968 2 458 2560
has
over
25
year
of
exper
ence
n the
Middl
e
East
cover
ng
all
ange
of
work
s
elate
d to:
Piling
works
CFA
Syste
m,
Bento
nite
bored
Piles
and
Drivin
g
of
Preca
st
concr
ete
Piles)
7.0
WORKING HOURS
The site working hours will be from 07:00 to 19:00 daily, Fridays excluded. One hour rest
will be given for lunch each day.
If required, extended working hours will be with prior approval from the Project Manager.
8.00
SAFETY
TMF will comply with all the safety requirements of the contract and the internal (TMF)
safety manual including the requirements on training of the project. Lifting devices such as
Shackles etc. will be properly inspected and certified before use. All lifting equipment will
bear the correct safety color codes.
All persons will wear proper personal protective equipment (PPE), i.e., ear protection,
safety helmets, safety glasses, safety shoes, hand gloves, etc. PPE will be of approved
type.
Dubai:
P. O. Box 83834
Tel.: .+971 4 298 0942
Fax: +971 4 298 0953
E-mail: ama@tmfeuro.ae
Sharjah:
P. O. Box 95177
Tel. : +971 6 535 3390
Fax : +971 6 535 3391
E-mail : info@tmfeuro.ae
Egypt:
P192 Ismailia, Egypt
Tel.: +20 64 391 3343
Fax : +20 64 391 3344
Oman:
P. O. Box 211 Ruwi
P.C. 112 Muscat, Oman
Tel. : +968 2 458 2556
Fax : +968 2 458 2560