Federal Register / Vol. 72, No.

214 / Tuesday, November 6, 2007 / Notices 62671

DEPARTMENT OF THE INTERIOR media, newspapers and BLM Web site 100 mega-watts (MW) (Ivanpah 1), 100
(http://www.ca.blm.gov/needles) at least MW (Ivanpah 2) and 200 MW (Ivanpah
Bureau of Land Management 15 days prior to the event. Comments on 3). The site is located in Townships 16
[CACA 48668; CA–690–07–5101–ER–B240] issues, potential impacts, or suggestions and 17 North, Range 14 East, San
for additional alternatives may also be Bernardino Meridian, and is
Notice of Intent to Prepare a Joint submitted in writing to the address approximately 4.5 miles southwest of
Environmental Impact Statement and listed below. In order to be included in Primm, Nevada. It is anticipated that the
Final Staff Assessment, and Amend the Draft EIS all comments must be energy output of the plants will serve
the California Desert Conservation received prior to the close of the scoping California and assist the state in meeting
Area Plan; California period or 15 days after the last public its renewable energy portfolio standards
meeting, whichever is later. Additional and goals. These concentrating solar
AGENCY: Bureau of Land Management, opportunities for public participation plants would utilize distributed power
Interior. and formal comment will occur when tower and heliostat (mirror) technology,
ACTION: Notice of Intent. the Draft EIS/Preliminary Staff in which heliostat fields focus solar
Assessment is issued. energy on power tower receivers near
SUMMARY: In compliance with the
ADDRESSES: Comments and other the center of each heliostat array. The
National Environmental Policy Act of
correspondence should be sent to the total 400 MW project would incorporate
1969 (NEPA), as amended, and the
BLM Needles Office, attention George R. 13 power towers and approximately
California Environmental Quality Act
Meckfessel, Planning and 272,000 heliostats (each is 7 square
(CEQA), the Department of the Interior,
Environmental Coordinator, Needles meters in size). Each of the three
Bureau of Land Management (BLM),
Field Office, 1303 South U.S. Highway proposed plants would have an
together with the California Energy
95, Needles, California, 92363–4228, or individual power block with steam
Commission (CA EC), intend to prepare
by fax at (760) 326–7099 or by e-mail at turbine, an air-cooled condenser,
an Environmental Impact Statement/
690@ca.blm.gov attention Ivanpah switchyard, and a generation tie-line.
Final Staff Assessment (EIS/FSA), on
SEGS. Documents pertinent to this The three plants would share access
the impacts of the Ivanpah Solar Electric
proposal, including comments of roads, two groundwater wells and water
Generating System (Ivanpah SEGS),
respondents, will be available for public lines, an administrative/maintenance
consisting of three concentrating solar-
review at the BLM Needles Field Office complex, a new substation, and a new
powered steam/electricity generating
during regular business hours of 7:30 5.3 mile natural gas pipeline. The
plants and related facilities, and a
a.m. to 4 p.m., Monday through Friday, shared facilities would be constructed
proposed land use plan amendment to
excluding holidays. Before including in the first phase. The plants would be
the 1980 California Desert Conservation
your address, telephone number, e-mail interconnected to the Southern
Area (CDCA) Plan, as amended. The
address, or other personal identifying California Edison (SCE) grid by SCE
Ivanpah SEGS is proposed by Solar
information in your comment, you through upgrades to SCE’s 115 kV line
Partners I, LLC; Solar Partners, II, LLC;
should be aware that your entire passing through the site and a new
Solar Partners IV, LLC; Solar Partners
comment—including your personal substation. The three plants would take
VIII,LLC; collectively the Applicants.
identifying information—may be made approximately 4 years to construct, and
The Applicants have requested a right-
publicly available at any time. While are expected to operate at last 50 years.
of-way (ROW) for each of three solar
you can ask us in your comment to Construction of the project is
power plants and a ROW for related
withhold your personal identifying anticipated to begin in the first quarter
shared facilities on approximately 3,400
information from public review, we of 2009, with construction being
contiguous acres of public lands in San
cannot guarantee that we will be able to completed in the last quarter of 2012.
Bernardino County, approximately 4.5 BLM will consider approval of the
miles southwest of Primm, Nevada. The do so. All submissions from
proposed Project in a manner that avoid
EIS will analyze the site-specific organizations, businesses, and from
or reduces impacts to public lands. This
impacts to the environment from the individuals identifying themselves as
action responds to federal law and
proposed grant of the ROWs and amend representatives or officials of
BLM’s policy allowing the use of public
the CDCA Plan to permit this site- organizations or businesses will be
lands for renewable energy, specifically
specific use of the CDCA. The CA EC is made available for public inspection in
section 211 of the Energy Policy Act of
the lead State of California agency for their entirety.
2005 (119 Stat. 594, 660) and BLM’s
the licensing of thermal power plants FOR FURTHER INFORMATION CONTACT: For Solar Energy Development Policy,
over 50 MW and compliance with the further information and/or to have your which was issued on April 4, 2007, and
requirements of CEQA. name added to our mailing list, contact established a framework to process
DATES: This notice initiates the public George R. Meckfessel, Planning and applications for ROWs and directs the
participation and scoping processes for Environmental Coordinator, Needles BLM to be responsive to solar energy
the EIS. A public scoping period of at Field Office, 1303 South U.S. Highway project applicants while protecting the
least 30 days and at least one public 95, Needles, California 92363–4228, environment. The CDCA Plan and the
meeting will be announced through the (760) 326–7008, fax (760) 326–7099, or Federal Land Policy Management Act of
local news media, newspapers, and e-mail George_Meckfessel@ca.blm.gov. 1976 (FLPMA) both recognize that the
BLM’s Web page (http:// SUPPLEMENTARY INFORMATION: Solar CDCA will be managed for multiple
www.ca.blm.gov/needles). During the Partners I, LLC, Solar Partners II, LLC, uses, including solar energy.
public scoping period the BLM will Solar Partners IV, LLC and Solar BLM must take into consideration
solicit public comment on issues, Partners VIII, LLC have applied for state law when granting ROWs. Current
mstockstill on PROD1PC66 with NOTICES

concerns and opportunities that should individual ROWs on public lands to California state laws and policy require
be considered in the analysis of the develop three solar thermal power the increased use of renewable energy
proposed action. The BLM expects to plants and related shared facilities in and established the California
hold at least one public meeting and close proximity on approximately 3,400 Renewable Portfolio Standard Program,
information about that meeting will be acres. The proposed projects would be under which the percentage of
announced through the local news constructed in three phases, as follows, electricity generated by publicly owned

VerDate Aug<31>2005 16:55 Nov 05, 2007 Jkt 214001 PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 E:\FR\FM\06NON1.SGM 06NON1
62672 Federal Register / Vol. 72, No. 214 / Tuesday, November 6, 2007 / Notices

utilities in California must increase to ACTION: Notice of Availability (NOA) of for ‘‘energy-related purposes or for other
20% by 2010 and 33% by 2017. the Final Programmatic Environmental authorized marine-related purposes,’’ to
The site selection study for the Impact Statement (EIS). the extent such activities are not
proposed solar plants and related otherwise authorized by other
SUMMARY: The MMS has prepared a final applicable law. Such activities may
facilities was conducted in 2006–07. programmatic EIS in support of the include, but are not limited to: Offshore
Several sites were identified as being establishment of a program for aquaculture, research, education,
suitable for this form of concentrating authorizing alternative energy and recreation, and support for offshore
solar technology. The EIS/FSA will alternate use activities on the Outer operations and facilities.
describe and analyze the proposed Continental Shelf (OCS), as authorized This programmatic EIS analyzes the
project as proposed and will include: (1) by Section 388 of the Energy Policy Act environmental impacts from potential
BLM measures to avoid, minimize, or of 2005 (EPAct), and codified in activities that may arise from the
mitigate impacts on the environment; subsection 8(p) of the Outer Continental establishment of an alternative energy
(2) A smaller plant alternative; (3) The Shelf Lands Act (OCSLA). Pursuant to and alternate use program on the OCS
‘‘No Action’’ alternative (no new solar the regulations implementing the in the reasonably foreseeable future,
power generation facility); and (4) National Environmental Policy Act defined in the EIS as 5–7 years. The
Alternative site locations for (NEPA), the MMS is announcing the MMS chose to prepare this
constructing and operating Ivanpah availability of this final programmatic programmatic EIS to assist its efforts to
SEGS. Through public scoping BLM EIS. As part of its efforts to develop a develop a comprehensive program and
expects to identify various issues, regulatory program for alternative to complete the proposed rule. The
potential impacts and mitigation energy and alternate use activities, this programmatic EIS analyzes the potential
measures. As proposed, the solar plants final programmatic EIS examines the environmental impacts that could result
have been sited to take advantage of potential environmental effects of the from the development of alternative
high solarity, to be located in areas program on the OCS and identifies energy and alternative use projects on
identified in the CDCA Plan as suitable policies and best management practices the OCS and identifies potential
for wind and solar development, and to that may be adopted for the program. mitigation measures. As such, the
avoid special status species habitat. The Several alternatives available to the programmatic EIS process:
plants are dry-cooled to reduce water MMS for implementing an alternative (1) Provides for public input, through
consumption and would be located near energy and alternate use program on the scoping meetings, hearings, and written
OCS are analyzed in this final comments, concerning the scope of
existing gas and electric transmission
programmatic EIS, including the ‘‘no national issues associated with offshore
facilities to reduce land disturbance.
action’’ alternative. alternative energy and alternate use
BLM has identified a potential list of The MMS intends to prepare a
issues that will need to be addressed in activities;
separate NEPA analysis, tiered from this (2) Identifies, defines, and assesses
this analysis including but not limited EIS, to evaluate the environmental generic environmental impacts
to: Air quality; social and economic impacts of the proposed rule for associated with potential offshore
impacts, including impacts to the public alternative energy and alternate use alternative energy and alternate use
from traffic; ground and surface water activities on the OCS. Further, separate activities to increase the agency
quantity and quality impacts; plant and lease sale, activity-specific, and understanding of the environmental
animal species including special status proposal-specific NEPA analyses will be consequences of future actions;
species; cultural resources; visual prepared as appropriate. (3) Evaluates and proposes policies
resource impacts; and land tenure and best management practices that may
Authority: The NOA is published pursuant
adjustment (grazing and mining). If to the regulations (40 CFR 1506.6) be adopted for any rulemaking by MMS;
approved, these solar energy projects on implementing the provisions of the National and,
public lands would be authorized in Environmental Policy Act (NEPA) of 1969 as (4) Establishes a foundation for future
accordance with the FLMPA and the amended (42 U.S.C. 4321 et seq. (1988)). NEPA analyses required for the
federal regulations at Title 43 Code of SUPPLEMENTARY INFORMATION: Section implementation of the alternative
Federal Regulations 2800. 388 of the EPAct, granted the Secretary energy and alternate use program.
(Authority: 43 CFR part 1712 and 43 CFR of the U.S. Department of the Interior The preferred alternative of this final
Part 1761). (Secretary) discretionary authority to programmatic EIS combines elements of
issue leases, easements, or rights-of-way the proposed action and the ‘‘case-by-
Dated: October 31, 2007. for activities on the OCS that produce or case’’ alternative. This combination
J. Anthony Danna, support production, transportation, or provides MMS flexibility to issue and
Deputy State Director, Natural Resources transmission of energy from sources manage leases, easements, or rights-of-
(CA–930). other than oil and gas, and are not way on the OCS for alternative energy
[FR Doc. E7–21762 Filed 11–5–07; 8:45 am] otherwise authorized by other and alternate use activities during the
BILLING CODE 4310–40–P applicable law. The Secretary delegated rulemaking process. Areas of the OCS
this authority to the MMS. Examples of that are assessed in this programmatic
the general types of alternative energy EIS are limited to those not expressly
DEPARTMENT OF THE INTERIOR project activities that MMS has the excluded under Section 388 of the
discretion to authorize may include, but EPAct, such as any areas on the OCS
Minerals Management Service are not limited to: Wind energy, wave within the exterior boundaries of any
energy, ocean current energy, solar unit of the National Park System,
mstockstill on PROD1PC66 with NOTICES

Alternative Energy and Alternate Use energy, and hydrogen production. National Wildlife Refuge System,
Final Programmatic Environmental The MMS has also been delegated National Marine Sanctuary System, or
Impact Statement discretionary authority to issue leases, any National Monument.
easements, or rights-of-way for other EIS Availability: To obtain a single
AGENCY: Minerals Management Service OCS project activities that make printed or CD–ROM copy of the final
(MMS), Interior. alternate use of existing OCS facilities programmatic EIS, you may contact the