Академический Документы
Профессиональный Документы
Культура Документы
petition was granted on October 31, Environmental Protection, Office of or surface disturbance is required to
2000 (ML003765068). Federal and State Materials and implement this action. Furthermore, the
Copies of the license amendments Environmental Management Programs, licensee will not open any new
approving Cabot’s proposed U.S. Nuclear Regulatory Commission, wellfields as a result of this licensing
decommissioning plan are available for Washington, DC 20555–0001. action, beyond those currently
public inspection at the Commission’s Telephone: (301) 415–7182; fax number: addressed by its license. The staff,
Public Document Room (PDR), located (301) 415–5369; e-mail: sjc7@nrc.gov. therefore, does not expect the proposed
at One White Flint North, 11555 SUPPLEMENTARY INFORMATION: action to impact geology, surface water,
Rockville Pike (first floor), Rockville, endangered and threatened fauna and
Maryland 20855–2738. The NRC I. Introduction
flora, transportation, and historic and
maintains ADAMS, which provides text The U.S. Nuclear Regulatory cultural resources.
and image files of NRC’s public Commission (NRC) is issuing a license
documents. The amendment may be amendment to Material License No. NRC staff also does not expect
accessed electronically from the SUA–1534, issued to Crow Butte significant environmental impacts to
ADAMS Public Electronic Reading Resources, Inc. (the licensee), to groundwater, socio-economic
Room on the Internet at the NRC Web authorize an upgrade to the central conditions, soil, air quality, and public
site, http://www.nrc.gov/reading-rm/ processing plant (CPP) and an increase and occupational exposures. The use of
adams.html under ADAMS accession in the CPP flow rate at its main in situ pressurized downflow columns
number ML072420136. Persons who do leach (ISL) facility near Crawford, minimizes the releases of radon, thus,
not have access to ADAMS, or have Nebraska. NRC has prepared an no significant impacts to air quality or
problems in accessing the documents Environmental Assessment (EA) in public and occupational exposures are
located in ADAMS, may contact the support of this amendment in expected. Also, the licensee maintains
NRC PDR Reference staff by phone at 1– accordance with the requirements of 10 procedures for cataloging and
800–397–4209, 301–415–4737, or by e- CFR Part 51. Based on the EA, the NRC addressing system leaks, which
mail to pdr@nrc.gov. has concluded that a Finding of No minimizes the impacts of such
Dated at Rockville, Maryland, this 24th day Significant Impact is appropriate. The occurrences; therefore, no significant
of October, 2007. amendment will be issued following the impacts to groundwater and soils are
For the Nuclear Regulatory Commission publication of this Notice. expected. No significant impacts to
Andrew Persinko,
socio-economic conditions are expected
II. EA Summary because implementing this action would
Branch Chief, Reactor Decommissioning The purpose of the proposed
Branch, Division of Waste Management and not result in significant staff increases.
Environmental Protection, Office of Federal amendment is to authorize an upgrade
to the CPP and increase the plant flow III. Finding of No Significant Impact
and State Materials and Environmental
Management Programs. rate at the licensee’s Crawford, On the basis of the EA, NRC has
[FR Doc. E7–21428 Filed 10–30–07; 8:45 am] Nebraska, facility. Specifically, the
concluded that there are no significant
licensee is authorized to install a
BILLING CODE 7590–01–P environmental impacts from the
maximum of six ion exchange columns
proposed amendment and has
and four ancillary tanks that would
determined not to prepare an
NUCLEAR REGULATORY support a plant flow rate increase of
environmental impact statement.
COMMISSION 4,000 gallons per minute (gpm). The
total allowable plant flow rate will IV. Further Information
[Docket No. 40–8943] increase to 9,000 gpm. On October 17,
2006, the licensee requested that NRC Documents related to this action,
Notice of Availability of Environmental including the application for
approve the proposed amendment.
Assessment and Finding of No amendment and supporting
The staff has prepared the EA in
Significant Impact for License documentation, are available
support of the proposed license
Amendment for Crow Butte Resources, electronically at the NRC’s Electronic
amendment. The staff considered
Inc., Crawford, NE Reading Room at http://www.nrc.gov/
impacts to water resources, public and
AGENCY: U.S. Nuclear Regulatory occupational exposures, socio-economic reading-rm/adams.html. From this site,
Commission. conditions, endangered and threatened you can access the NRC’s Agencywide
ACTION: Notice of availability. fauna and flora, historic and cultural Document Access and Management
resources, geology, soils, transportation, System (ADAMS), which provides text
FOR FURTHER INFORMATION CONTACT: and air quality. This licensing action and image files of NRC(s public
Stephen J. Cohen, Project Manager, involves installing new equipment documents. The ADAMS accession
Uranium Recovery Licensing Branch, within the existing footprint of the CPP. numbers for the documents related to
Division of Waste Management and Consequently, no building construction this notice are:
Request for License Amendment for Plant Upgrade ................................................................ October 17, 2006 ......... ML063390348
License Amendment for Plant Upgrade, Response to Request for Additional Information ..... April 27, 2007 .............. ML071290026
NRC Inspection Report ............................................................................................................. September 8, 2006 ...... ML062540084
NRC Environmental Assessment for Renewal of Source Materials License No. SUA–1534 .. February 1998 ............. ML071520242
Environmental Assessment for the Plant Upgrade ................................................................... October 23, 2007 ......... ML072360287
rwilkins on PROD1PC63 with NOTICES
NRC Request for Additional Information ................................................................................... September 8, 2006 ...... ML070540341
If you do not have access to ADAMS documents located in ADAMS, contact Reference staff at 1–800–397–4209, 301–
or if there are problems in accessing the the NRC’s Public Document Room (PDR) 415–4737, or by e-mail to pdr@nrc.gov.
VerDate Aug<31>2005 17:45 Oct 30, 2007 Jkt 214001 PO 00000 Frm 00088 Fmt 4703 Sfmt 4703 E:\FR\FM\31OCN1.SGM 31OCN1
61694 Federal Register / Vol. 72, No. 210 / Wednesday, October 31, 2007 / Notices
These documents may also be viewed were published in the Federal Register only during those portions of the
electronically on the public computers on September 26, 2007 (72 FR 54693). meeting that are open to the public.
located at the NRC’s PDR, O 1 F21, One Further information regarding this Detailed procedures for the conduct of
White Flint North, 11555 Rockville meeting can be obtained by contacting and participation in ACRS meetings
Pike, Rockville, MD 20852. The PDR the Designated Federal Officer between were published in the Federal Register
reproduction contractor will copy 8:15 a.m. and 5 p.m. (ET). Persons on September 26, 2007 (72 FR 54695).
documents for a fee. planning to attend this meeting are Further information regarding this
Dated at Rockville, Maryland, this 24th day urged to contact the above named meeting can be obtained by contacting
of October, 2007. individual at least 2 working days prior the Designated Federal Officer between
For the Nuclear Regulatory Commission. to the meeting to be advised of any 8:45 a.m. and 5:30 p.m. (ET). Persons
potential changes in the agenda. planning to attend this meeting are
Stephen J. Cohen,
Dated: October 24, 2007. urged to contact the above named
Project Manager, Uranium Recovery Licensing
Branch, Decommissioning and Uranium Antonio F. Dias, individual at least 2 working days prior
Recovery Licensing Directorate, Division of Chief, Nuclear Waste & Materials Branch. to the meeting to be advised of any
Waste Management and Environmental potential changes to the agenda.
[FR Doc. E7–21430 Filed 10–30–07; 8:45 am]
Protection, Office of Federal and State Dated: October 25, 2007.
BILLING CODE 7590–01–P
Materials and Environmental Management Cayetano Santos,
Programs.
Chief, Reactor Safety Branch, ACRS.
[FR Doc. E7–21429 Filed 10–30–07; 8:45 am] NUCLEAR REGULATORY [FR Doc. E7–21432 Filed 10–30–07; 8:45 am]
BILLING CODE 7590–01–P COMMISSION BILLING CODE 7590–01–P
and participation in ACNW&M meetings Electronic recordings will be permitted its entirety.
VerDate Aug<31>2005 17:45 Oct 30, 2007 Jkt 214001 PO 00000 Frm 00089 Fmt 4703 Sfmt 4703 E:\FR\FM\31OCN1.SGM 31OCN1