TR01-M0-000-I8-M-QC-0010-000
Rev: C04, Date: 13.03.2014
Page 3 of 14
LIST OF CONTENTS
TR01-M0-000-I8-M-QC-0010-000
Rev: C04, Date: 13.03.2014
Page 4 of 14
2. REFERENCES
KE01-A0-000-KD-C-SP-0005-000
KE01-A0-000-AK-H-YP-0007-000
KE01-00-000-KD-V-SS-0001-000
TR01-M0-000-I8-M-TT-0002-000
TR01-M0-000-I8-M-PR-0009-000
TR01-M0-000-I8-M-PR-0002-000
TR01-M0-000-I8-M-PR-0021-000
TR01-M0-000-I8-A-PR-0002-000
ISKER - KSS
Where:
Hold Point
Inspection Point
Review
Surveillance
TR01-M0-000-I8-M-QC-0010-000
Rev: C04, Date: 13.03.2014
Page 5 of 14
4. INSPECTION PLAN
INSPECTION AND TEST PLAN FOR
PASSIVE FIREPROOFING PROTECTION
Activity
Activity
No.
1.0
Prequalification Test
Ensure that prequalifying test
have been carried out to the
satisfaction of the company and
manufacturers representative,
including all inspection and
testing in accordance with this
document. Ensure that company
and operator prequalification test
and approvals are in place for the
specified PFP materials.
2.0
Area Release
Receive area release
authorisation in way of surface
preparation and priming. Review
the Project specific PFP drawings
and mark up drawings.
Reference Specification /
Procedure
KE01-A0-000-KD-C-SP-0005-000
Specification for Fireproofing
materials and workmanship
KE01-00-000-KD-V-SS-0001-000
Specification for Surface
Preparation and External Coating
Acceptance Criteria
Inspection and
Acceptance
ISKERKSS
AGIP
KCO
Checklist / Report
N /A
KE01-A0-000-KD-C-SP-0005-000
Specification for Fireproofing
materials and workmanship
N/A
3.0
Protection
Prior to any coating related
activities all items not for coating
shall be covered by tarpaulin or
equivalent. Work areas to be
encapsulated to maintain
acceptable application criteria.
KE01-00-000-KD-V-SS-0001-000
Specification for Surface
Preparation and External Coating
Visual Inspection
S/R
N/A
TR01-M0-000-I8-M-QC-0010-000
Rev: C04, Date: 13.03.2014
Page 6 of 14
Activity
Reference Specification /
Procedure
Acceptance Criteria
Inspection and
Acceptance
ISKER-KSS
4.0
Substrate Preparation
Preparation methods and
procedures for surfaces to be
coated shall remove all foreign
matter, surface irregularities and
contaminants to bring the surface
to the specified standard of
cleanliness prior to the application
of coatings.
5.0
Daily Environmental
Conditions Check
Perform environmental conditions
check to include air temp.,
relative humidity, substrate temp
and dew point. Environmental
conditions checks shall be carried
out at least 3 times during the
shift.
6.0
KE01-00-000-KD-V-SS-0001-000
Specification for Surface
Preparation and External Coating
/AGIP KCO
KE01-00-000-KD-V-SS-0001-000
(Clause 6.2)
Visual Inspection
Salt Test
KE01-00-000-KD-V-SS-0001-000
Specification for Surface
Preparation and External Coating
Checklist / Report
Form No:
ID X78003AR
KE01-00-000-KD-V-SS-0001-000
(Clause 6.3)
Daily
Environmental
Conditions Check
Material Datasheet
H
Form No:
IOPF0002
KE01-00-000-KD-V-SS-0001-000
Specification for Surface
Preparation and External Coating
KE01-00-000-KD-V-SS-0001-000
(Clause 6.2)
Use aluminium oxide or non-metallic abrasives
for stainless steel and other noble metallic
surfaces
Chlorine content must be below 25 ppm
Data sheet for material
Form No:
ID X78003AR
TR01-M0-000-I8-M-QC-0010-000
Rev: C04, Date: 13.03.2014
Page 7 of 14
Activity
No.
Reference Specification /
Procedure
Acceptance Criteria
Inspection and
Acceptance
Checklist / Report
7.0
Storage of Materials
Ensure that materials are stored
in accordance with manufacturers
temperature ranges and records
are maintained.
KE01-00-000-KD-V-SS-0001-000
Specification for Surface
Preparation and External Coating
KE01-00-000-KD-V-SS-0001-000
(Clause 5.1.1)
KE01-A0-000-KD-C-SP-0005-000
Specification for Fireproofing
Materials and Workmanship
(Clause 5.1)
KE01-A0-000-KD-C-SP-0005-000
Material storage
temperature log book
H
Material datasheet
8.0
Primer
Make it necessary to prime the
substrate to prevent deterioration
of the blast.
To ensure optimal bonding
between the Interchar 212 and
substrate, correct primer (Interzinc
52) type and thickness are
required
9.0
KE01-00-000-KD-V-SS-0001-000
Specification for Surface
Preparation and External Coating
TR01-M0-000-I8-M-PR-0002-000
Procedure for Surface Preparation
and External Coating
KE01-00-000-KD-V-SS-0001-000
(Clause 7.2)
Form No:
Mark up drawings.
ID X78003AR
H
KE01-00-000-KD-V-SS-0001-000
Specification for Surface
Preparation and External Coating
TR01-M0-000-I8-M-PR-0002-000
Procedure for Surface Preparation
and External Coating
TR01-M0-000-I8-M-TT-0002-000
Method Statement Passive
Fireproofing Protection
KE01-00-000-KD-V-SS-0001-000
(Clause 7.2)
As per Material Datasheet
Mark up drawings.
Reference is TQ No:
Technical Query Form KE01-TQ-A27A-C-A95A24896
Form No:
H
ID X78003AR
TR01-M0-000-I8-M-QC-0010-000
Rev: C04, Date: 13.03.2014
Page 8 of 14
10.0
Activity
Coating Application
Ratio checks should be carried
out prior to application. Verify that
the shelf life of Interchar 212 /
Chartek 1709 has not exceed
manufacturers
recommendations.
10.1
10.2
11.0
Reference Specification /
Procedure
KE01-A0-000-KD-C-SP-0005-000
Specification for Fireproofing
Materials and Workmanship
TR01-M0-000-I8-M-TT-0002-000
Method Statement Passive
Fireproofing Protection
KE01-A0-000-KD-C-SP-0005-000
Specification for Fireproofing
Materials and Workmanship
KE01-A0-000-KD-C-SP-0005-000
Specification for Fireproofing
Materials and Workmanship
Inspection of coatings
KE01-A0-000-KD-C-SP-0005-000
Specification for Fireproofing
Materials and Workmanship
TR01-M0-000-I8-M-TT-0002-000
Method Statement Passive
Fireproofing Protection
TR01-M0-000-I8-M-TT-0002-000
Method Statement Passive
Fireproofing Protection
TR01-M0-000-I8-M-TT-0002-000
Method Statement Passive
Fireproofing Protection
Acceptance Criteria
Inspection and
Acceptance
:
Checklist / Report
KE01-A0-000-KD-C-SP-0005-000
(Clause 8.2)
As per Material Datasheet
Mark up drawings.
Daily Report
Form No:
IOPF0001
KE01-A0-000-KD-C-SP-0005-000
(Clause 8.2)
Inspection Report
Form No:
ID X78003AR
H
W
F ireproofing
Daily Report
Form No:
IOPF0001
f
Mark up drawings.
KE01-A0-000-KD-C-SP-0005-000
Visual Inspection
Mark up drawings
F ireprofing
Daily Report
Form No:
IOPF0001
f
KE01-A0-000-KD-C-SP-0005-000
(Clause 12.0)
W
F ireproofing
Daily Report
Form No:
IOPF0001
f
DFT
TR01-M0-000-I8-M-QC-0010-000
Rev: C04, Date: 13.03.2014
Page 9 of 14
Activity
12.0
Repair
Remove damage or delaminated
Interchar 212 / Chartek 1709 with
either hand tools or power grinder
upto well bonded areas. Observe
material data sheets precautions
and / or local safety and health
regulations
for
personnel
protective equipment during this
operation.
Blow down repair area with clean
dry air to remove any dust, etc.
13.0
Top Coat
After full inspection of Interchar
212 or Chartek 1709, apply
topcoat Interthane 990 (RAL
6024) in line with system
requirements.
Reference Specification /
Procedure
KE01-A0-000-KD-C-SP-0005-000
Specification for Fireproofing
Materials and Workmanship
Acceptance Criteria
ISKERKSS
KE01-00-000-KD-V-SS-0001-000
(Clause 8)
As per Material Datasheet
KE01-A0-000-KD-C-SP-0005-000
Specification for Fireproofing
Materials and Workmanship
KE01-00-000-KD-V-SS-0001-000
(Clause 7.2)
F ireproofing
Daily Report
Form No:
IOPF0001
f
Project Drawings
TR01-M0-000-I8-M-PR-0002-000
Procedure for Surface Preparation
and External Coating
TR01-M0-000-I8-M-TT-0002-000
Method Statement Passive
Fireproofing Protection
Checklist / Report
AGIP
KCO
KE01-A0-000-KD-C-SP-0005-000
TR01-M0-000-I8-M-TT-0002-000
Method Statement Passive
Fireproofing Protection
KE01-00-000-KD-V-SS-0001-000
(Clause 7.3, painting application)
Inspection and
Acceptance
F ireproofing
Daily Report
Form No:
IOPF0001
f
TR01-M0-000-I8-M-QC-0010-000
Rev: C04, Date: 13.03.2014
Page 10 of 14
14.0
Activity
Reference Specification /
Procedure
KE01-A0-000-KD-C-SP-0005-000
Specification for Fireproofing
Materials and Workmanship
KE01-00-000-KD-V-SS-0001-000
Specification for Surface
Preparation and External Coating
Acceptance Criteria
Inspection and
Acceptance
ISKERKSS
KE01-00-000-KD-V-SS-0001-000
(Clause 9.0)
KE01-A0-000-KD-C-SP-0005-000
(Clause 12.0)
H
As per Material Datasheet
Checklist / Report
AGIP
KCO
Project Drawings
TR01-M0-000-I8-M-QC-0010-000
Rev: C04, Date: 13.03.2014
Page 11 of 14
5. ATTACHMENTS
Form No:
Form Description:
4.1
IOPF0002
4.2
ID X78003AR
4.3
IOPF0001
TR01-M0-000-I8-M-QC-0010-000
Rev: C04, Date: 13.03.2014
Page 12 of 14
FORM NO : IOPF0002
FIREPROOFING
Daily Log No.
Daily Environmental Conditions Check List
Rev. No. 0
Page No. 1
TIME
DATE
AIR
TEMPERATURE
SUB CONRACTOR
NAME
SIGNATURE :
DATE
SUBSTRATE
TEMPERATURE
C
DEW POINT
AKCO QC Inspector
RELATIVE
HUMIDITY %
TR01-M0-000-I8-M-QC-0010-000
Rev: C04, Date: 13.03.2014
Page 13 of 14
CONTRACTOR:
DATE:
Report No:
LOCATION
:
COATING ACTIVITY:
ENVIRONMENTAL CONDITIONS:
PRE-BLASTING CONDITIONS:
TIME
OIL/GREASE CONTAMINANTS
AIR TEMPERATURE, C
RELATIVE HUMIDITY, %
STEEL CONDITION
DEW POINT, C
SUBSTRATE TEMPERATURE, C
BLASTING ABRASIVES:
TYPE
SIZE
ABRASIVE RATIO
CHLORIDE CONTENT
BLASTING EQUIPMENT:
TYPE
PRE-HEATING TYPE
OIL CONTAMINATION
CLEANLINESS (SPEC/ACTUAL)
METHOD OF COATINGAPPLICATION:
SURFACE PROFILE
(SPEC/ACTUAL)
COATING APPLICATION:
TIME START/FINISH
SYSTEM PRODUCT(S)/QUANTITIES
BATCH NO
MIXING RATIO
THINNER
WFT
TDFT (SPEC/ACTUAL):
METHOD:
HOLIDAY TESTING:
METHOD:
ADHESION TESTING:
METHOD:
METHOD:
OTHER TESTING:
METHOD:
REMARKS:
Sub - Contractor
AKCO QC Inspector
DFT
TR01-M0-000-I8-M-QC-0010-000
Rev: C04, Date: 13.03.2014
Page 14 of 14
Form no: IOPF0001
FIREPROOFING
DAILY LOG
Page No. 1
DAILY LOG for FIREPROOFING
Location:
ISO/P&ID Drawing:
Tag No.:
Unit:
Date:
ISKERKSS
1.
2.
Part A ______________0C
3.
Batch Number
Part A ________________Part B _________________
PFP Production mixed, in accordance with the project specification
and the manufactures recommendations
Ratio :
Part A___________% Part B ___________%
Thinner ____________%
4.
5.
Part B _____________0C
6.
Accept_____________ Reject____________
7.
8.
9.
Witness/
Initial
___________Min.
___________Min.
AKCO QC Inspector
Name:
Name:
Name:
Signature:
Signature:
Signature:
Date:
Date:
Date:
Sub - Contractor
AKCO
Witness
Review