Вы находитесь на странице: 1из 1

Federal Register / Vol. 72, No.

176 / Wednesday, September 12, 2007 / Notices 52197

Los Angeles, CA. Proposed hearing. To ensure that the full range of to convey existing and projected traffic
improvements would involve issues related to this proposed action is demand. Alternatives under
retrofitting or demolition and addressed and all significant concerns consideration include (1) taking no
replacement of the existing viaduct over are identified, comments and action; (2) constructing two managed
the Los Angeles River between Mateo suggestions are invited from all lanes from Palomar Street to State Route
and Mill Streets on the west side and interested parties. Comments or 94; and (3) constructing four managed
west of Interstate 5 on the east side, for questions about this proposed action lanes from Palomar Street to State Route
a distance of approximately 0.9 miles. and the EIS should be directed to 94. Incorporated into and studied with
The 6th Street Viaduct, built in 1932, Caltrans at the address provided above. the build alternatives will be design
is one of 12 historic bridges/viaducts (Catalog of Federal Domestic Assistance variations for locations of direct access
crossing the Los Angeles River. The Program Number 20.205, Highway Planning ramps, auxiliary lanes, and in-line
concrete elements of the 3,500 foot long and Construction. The regulations transit stations. Letters describing the
6th Street Viaduct are degraded by an implementing Executive Order 12372 proposed action and soliciting
ongoing chemical reaction, known as regarding intergovernmental consultation on comments will be sent to appropriate
Alkali Silica Reaction (ASR), which has Federal programs and activities apply to this Federal, State, and local agencies, and to
led to substantial deterioration of the program.)
private organizations and citizens who
structure and decrease of its concrete Issued on: September 5, 2007. have previously expressed or are known
strength, rendering it vulnerable to Maiser Khaled, to have interest in this proposal. A
collapse in a major earthquake. This Director, Project Development & public scoping meeting will be held for
ASR deterioration of the 6th Street Environment, Federal Highway the project, and a separate mailing will
Viaduct has been occurring for at least Administration, Sacramento, California. be sent out to all interested parties with
75 years, despite ongoing efforts to [FR Doc. E7–17970 Filed 9–11–07; 8:45 am] the specific date, time, and location for
arrest or limit its effect. While the BILLING CODE 4910–22–P the meeting. In addition, a public
deteriorated surface appearance of the hearing will be held during draft EIS
viaduct is of concern, its underlying circulation. Public notice will be given
structural integrity is of much greater DEPARTMENT OF TRANSPORTATION as to the time and place of the hearing.
concern. In 1989, the Whittier Narrows The draft EIS will be available for public
earthquake caused damage to shear keys Federal Highway Administration and agency review and comment prior
and caused a column crack at Bent 33 to the public hearing.
of the viaduct. The structure has since Environmental Impact Statement: I–805
Managed Lanes South To ensure that the full range of issues
been classified by Caltrans as Category related to this proposed action are
I and placed on the mandatory seismic AGENCY: Federal Highway addressed and all significant issues
retrofit list. Administration (FHWA), DOT. identified, comments and suggestions
The proposed project would result in
ACTION: Revised notice of intent. are invited from all interested parties.
a structure capable of withstanding a
Comments or questions concerning this
moderate seismic event by either SUMMARY: This notice is a revision of the proposed action and the EIS should be
retrofitting the existing structure or July 11, 2007 Notice of Intent (Federal directed to the contacts provided above.
replacing it entirely. Several alternatives Register Volume 72, Number 132, Page
were considered during the project (Catalog of Federal Domestic Assistance
37814) which advised that an Program Number 20.205, Highway Planning
development phase. Criteria used to Environmental Impact Statement (EIS)
identify alternatives to be carried and Construction. The regulations
will be prepared for a project in San implementing Executive Order 12372
forward for detailed analysis in the Diego, California. The purpose of this regarding intergovernmental consultation on
environmental document include revised notice is to advise agencies and Federal programs and activities apply to this
construction and maintenance costs, life the public that environmental review, program.)
span of the facility, constructability, consultation, and any other action Issued on: September 4, 2007.
historic preservation, community required in accordance with applicable
disruption, and seismic and operational Maiser Khaled,
Federal laws for this project is being, or Director, Project Development &
safety. Based on the results of public
has been, carried out by the California Environment, Federal Highway
pre-scoping meetings and preliminary
Department of Transportation (Caltrans) Administration, Sacramento, California.
screening analysis, a No Build
under its assumption of responsibility, [FR Doc. E7–17912 Filed 9–11–07; 8:45 am]
Alternative and two Build Alternatives,
pursuant to 23 U.S.C. 327.
including Viaduct Retrofit and Viaduct BILLING CODE 4910–22–P
Replacement, will be analyzed in the FOR FURTHER INFORMATION CONTACT:
environmental document. David Nagy, Senior Environmental
The project team has met with the Planner, California Department of DEPARTMENT OF TRANSPORTATION
general public and neighborhood Transportation, 4050 Taylor Street, San
groups, and a Community Advisory Diego, CA 92110, Telephone: (619) 688– Surface Transportation Board
Committee has been actively engaged. 0224.
[STB Finance Docket No. 35076]
Public information activities, including SUPPLEMENTARY INFORMATION: The
meetings with the project development FHWA is issuing this notice to advise City of Boise Railroad—Operation
team, will continue throughout the the public that an EIS will be prepared Exemption—The Boise Cutoff Rail Line
design and environmental process. A for proposed improvements on in Ada County, ID
subsequent public hearing on the draft Interstate 805 (I–805) in San Diego, CA.
EIS will be held to discuss alternatives Proposed improvements include The City of Boise Railroad (the City),
jlentini on PROD1PC65 with NOTICES

and impacts of the proposed action. construction of managed lanes, direct a noncarrier, has filed a verified notice
Public notices will be published and access ramps, in-line transit stations, of exemption under 49 CFR 1150.31 to
posted on the project Web site and auxiliary lanes between Palomar operate an 18.2-mile line of railroad
containing the specific time and place of Street and University Avenue. These known as the Boise Cutoff between
the public scoping meetings and proposed improvements are necessary milepost 424.80 near Orchard and

VerDate Aug<31>2005 18:43 Sep 11, 2007 Jkt 211001 PO 00000 Frm 00153 Fmt 4703 Sfmt 4703 E:\FR\FM\12SEN1.SGM 12SEN1

Вам также может понравиться