Federal Register / Vol. 72, No.

174 / Monday, September 10, 2007 / Notices 51687

Special Events entrance (Constitution NUCLEAR REGULATORY report NUREG–1748, ‘‘Environmental


Ave., NW., between 7th and 9th Streets, COMMISSION Review Guidance for Licensing Actions
NW.). Reservations are not required but Associated with NMSS Programs.’’
[Docket No. 72–26] Based on the EA, NRC also issued a
space may be limited.
Notice of Availability of Supplement to FONSI for this action on October 24,
FOR FURTHER INFORMATION CONTACT:
the Environmental Assessment and 2003, in accordance with 10 CFR 51.31
Nancy Allard at 301–837–1477 or Carla and 51.32.
Patterson at 301–837–0993, or at Final Finding of No Significant Impact
On March 22, 2004, the NRC staff
Vision@nara.gov. for the Diablo Canyon Independent
issued Materials License No. SNM–2511
Spent Fuel Storage Installation
Dated: August 31, 2007. to PG&E, pursuant to 10 CFR Part 72,
Nancy Allard, AGENCY: Nuclear Regulatory authorizing PG&E to receive, possess,
NARA Federal Register Liaison. Commission. store, and transfer spent nuclear fuel
[FR Doc. E7–17729 Filed 9–7–07; 8:45 am] ACTION: Notice of Availability and and associated radioactive materials
Finding of No Significant Impact. resulting from the operation of the
BILLING CODE 7515–01–P
Diablo Canyon Power Plant in an ISFSI
SUMMARY: Notice is hereby given that at the site for a term of 20 years. PG&E
the U.S. Nuclear Regulatory has begun construction of the Diablo
Commission (NRC) is issuing a Canyon ISFSI and currently plans to
NATIONAL SCIENCE FOUNDATION
supplement to the Environmental start transferring spent fuel to the ISFSI
Advisory Committee for Biological Assessment (EA) for the Diablo Canyon in mid-2008.
Sciences; Notice of Meeting Independent Spent Fuel Storage After NRC’s issuance of the license for
Installation (ISFSI) and a final Finding the Diablo Canyon ISFSI, the San Luis
In accordance with the Federal of No Significant Impact (FONSI). NRC Obispo Mothers for Peace and other
Advisory Committee Act (Pub. L., 92– issued the EA and initial FONSI for this parties filed suit in the United States
463, as amended), the National Science action on October 24, 2003, and Court of Appeals for the Ninth Circuit,
Foundation announces the following subsequently issued a license for the asking that NRC be required to consider
meeting: Diablo Canyon ISFSI to the Pacific Gas terrorist acts in its environmental
and Electric Company (PG&E), on March review associated with this licensing
NAME: Advisory Committee for 22, 2004. The license authorizes PG&E action. In its decision of June 2, 2006,
Biological Sciences (1110). to receive, possess, store, and transfer San Luis Obispo Mothers for Peace v.
October 18, 2007—8
DATE AND TIME: spent nuclear fuel and associated NRC, 449 F.3d 1016 (9th Cir. 2006), the
a.m.—5 p.m. October 19, 2007—8 a.m.— radioactive materials resulting from the Ninth Circuit held that NRC could not
operation of the Diablo Canyon Power categorically refuse to consider the
12 p.m.
Plant in an ISFSI at the site for a term consequences of a terrorist attack under
PLACE: National Science Foundation, of 20 years. NRC is issuing this NEPA and remanded the case to NRC.
4201 Wilson Blvd., Arlington, VA In response to the Ninth Circuit
supplement to the EA and final FONSI
22230, Room 375. decision, the Commission issued a
in response to the June 2, 2006, decision
Memorandum and Order on February
TYPE OF MEETING: Open. by the United States Court of Appeals
26, 2007, directing the NRC staff to
for the Ninth Circuit, San Luis Obispo
CONTACT PERSON: Dr. Charles Liarakos, prepare a revised EA, addressing the
Mothers for Peace v. NRC, 449 F.3d
Senior Advisor, Biological Sciences, likelihood of a terrorist attack at the
1016 (9th Cir. 2006). This supplement to
Room 605, National Science Diablo Canyon ISFSI site and the
the EA addresses the environmental
Foundation, 4201 Wilson Boulevard, potential consequences of such an
impacts from potential terrorist acts
Arlington, VA 22230 Tel No.: (703) 292– attack. On May 29, 2007, the NRC staff
against the Diablo Canyon ISFSI.
8400. issued a preliminary supplement to the
FOR FURTHER INFORMATION CONTACT: EA and draft FONSI to address the
MINUTES: May be obtained from the James R. Hall, Senior Project Manager, environmental impacts from potential
contact person listed above. Licensing Branch, Division of Spent terrorist acts against the Diablo Canyon
Fuel Storage and Transportation, Mail ISFSI. On May 31, 2007, NRC published
PURPOSE OF MEETING: The Advisory
Stop EBB–3D–02M, U.S. Nuclear a notice of availability in the Federal
Committee for BIO provides advice,
Regulatory Commission, Washington, Register (72 FR 30398), providing
recommendations, and oversight
DC, 20555–0001. Telephone: (301) 492– opportunity for public comment on the
concerning major program emphases,
3319; e-mail: jrh@nrc.gov. preliminary supplement to the EA and
directions, and goals for the research-
related activities of the divisions that SUPPLEMENTARY INFORMATION: draft FONSI and establishing July 2,
make up BIO. 2007, as the deadline to submit
I. Introduction comments. Approximately 32
Agenda On December 21, 2001, PG&E individual comment documents (i.e.,
submitted an application to NRC, letters, facsimiles, and e-mails) were
• Undergraduate Education in the requesting a site-specific license to received by the NRC. Of the 32
Biological Sciences and Biology build and operate an ISFSI, to be located comment documents received, 12 were
Education Presentations. on the site of the Diablo Canyon Power nearly identical letters, and many others
• COV Reports. Plant, in San Luis Obispo County, contained the same or similar
• Discussion. California. In accordance with the comments. As a result, the NRC staff
National Environmental Policy Act grouped similar or related comments
ebenthall on PRODPC61 with NOTICES

Dated: September 5, 2007.


(NEPA), the NRC staff issued an EA for together and developed 17 general
Susanne Bolton, this action on October 24, 2003, in comment areas. NRC’s summary of the
Committee Management Officer. conformance with NRC requirements comments received and its responses
[FR Doc. E7–17725 Filed 9–7–07; 8:45 am] specified in 10 CFR 51.21 and 51.30, are provided in an appendix to the final
BILLING CODE 7555–01–P and the associated guidance in NRC supplemental EA.

VerDate Aug<31>2005 15:27 Sep 07, 2007 Jkt 211001 PO 00000 Frm 00106 Fmt 4703 Sfmt 4703 E:\FR\FM\10SEN1.SGM 10SEN1
51688 Federal Register / Vol. 72, No. 174 / Monday, September 10, 2007 / Notices

The October 24, 2003, EA and FONSI, lower than doses calculated using the V. Further Information
the license and supporting documents, assumptions made for the generic Documents related to this action,
and the preliminary supplement to the assessments. Based on these including the May 29, 2007, preliminary
EA and draft FONSI are available on considerations, the dose to the nearest supplement to the EA and draft FONSI;
NRC’s Web site at: http://www.nrc.gov/ affected resident, from even the most the August 30, 2007, EA supplement
waste.html, by selecting ‘‘Diablo Canyon severe plausible threat scenarios (the and final FONSI; the October 24, 2003,
ISFSI,’’ in the Quick Links box. ground assault and aircraft impact EA; and the Diablo Canyon ISFSI
II. Summary of Final Supplement to the scenarios discussed above) would likely license and supporting documentation,
EA for the Diablo Canyon ISFSI be well below 5 rem. In many scenarios, are available electronically, at NRC’s
the hypothetical dose to an individual Electronic Reading Room, at: http://
In the supplement to the EA, the NRC
staff has considered the potential in the affected population could be www.nrc.gov/reading-rm/adams.html.
radiological impacts of terrorist acts on substantially less than 5 rem, or none at From this site, you can access NRC’s
the Diablo Canyon ISFSI. NRC has all. Agencywide Document Access and
established requirements and has In the supplement (based also on the Management System (ADAMS), which
initiated several actions designed to initial EA), the NRC staff concludes that provides text and image files of NRC’s
provide high assurance that a terrorist the construction, operation, and public documents. The ADAMS
attack would not lead to a significant decommissioning of the Diablo Canyon accession number for the supplement to
radiological event at an ISFSI. These ISFSI, even when potential terrorist the EA and draft FONSI is
include: (1) NRC’s continual evaluation ML071280256, and for the EA
attacks on the facility are considered,
of the threat environment, in supplement and final FONSI, the
will not result in a significant effect on
coordination with the intelligence and accession number is ML072400511. The
the human environment. NRC security
law enforcement communities, which ADAMS accession number for the
requirements, imposed through October 24, 2003, EA is ML032970337,
provides, in part, the basis for the regulations and orders, and
protective measures currently required; and for the ISFSI license and related
implemented through the licensee’s documents, the accession number is
(2) the protective measures that are in security plans, in combination with the
place to reduce the chance of an attack ML040780107. If you do not have access
design requirements for dry cask storage to ADAMS, or if there are problems in
that leads to a significant release of
systems, provide adequate protection accessing the documents located in
radiation; (3) the robust design of dry
cask storage systems, which provide against successful terrorist attacks on ADAMS, contact NRC’s Public
substantial resistance to penetration; ISFSIs. Therefore, a terrorist attack that Document Room (PDR) Reference staff
and (4) NRC security assessments of the would result in a significant release of at 1–800–397–4209, 301–415–4737, or
potential consequences of terrorist radiation affecting the public is not by e-mail to pdr@nrc.gov.
attacks against ISFSIs. reasonably expected to occur. These documents may also be viewed
The supplement to the EA describes electronically on the public computers
III. Final Finding of No Significant
the security measures for ISFSIs and located at NRC’s PDR, O1–F21, One
Impact
discusses the security assessments White Flint North, 11555 Rockville
performed by NRC, which confirmed The NRC staff has prepared a Pike, Rockville, MD 20852. The PDR
that the existing security requirements, supplement to the EA related to the reproduction contractor will copy
imposed by regulations and orders, are construction and operation of the Diablo documents, for a fee.
adequate to provide high assurance that Canyon ISFSI, in accordance with the Dated at Rockville, Maryland this 30th day
a terrorist attack on an ISFSI will not requirements of 10 CFR Part 51. As set of August, 2007.
lead to significant radiological forth in the supplement to the EA, NRC For the Nuclear Regulatory Commission.
consequences. Threat scenarios has considered the potential for terrorist Robert A. Nelson,
considered in the generic security attacks on the facility, and has Chief, Licensing Branch, Division of Spent
assessments for ISFSIs included a large determined that the storage of spent Fuel Storage and Transportation, Office of
aircraft impact similar in magnitude to Nuclear Material Safety and Safeguards.
nuclear fuel at the Diablo Canyon ISFSI
the attacks of September 11, 2001, and
will not have a significant effect on the [FR Doc. E7–17738 Filed 9–7–07; 8:45 am]
ground assaults using expanded
quality of the human environment, BILLING CODE 7590–01–P
adversary characteristics consistent with
the design basis threat for radiological based on the facility design features and
sabotage for nuclear power plants. the mitigative security measures
The NRC staff compared the incorporated as part of the NRC OVERSEAS PRIVATE INVESTMENT
assumptions used in its generic ISFSI licensing action and in response to NRC CORPORATION
security assessments to the relevant security orders. These design features
and mitigative security measures will September 20, 2007 Board of Directors
features of the Diablo Canyon ISFSI.
provide high assurance that substantial Meeting
Based on this comparison, the staff
determined that the assumptions used environmental impacts will be avoided Time and Date: Thursday, September
in these generic security assessments, and thereby reduced to a non-significant 20, 2007, 10 a.m. (Open Portion).
regarding the storage cask design, the risk level. On the basis of the initial EA Place: Offices of the Corporation,
amount of radioactive material that and this supplement, NRC has Twelfth Floor Board Room, 1100 New
could be released, and the atmospheric concluded that there are no significant York Avenue, NW., Washington, DC.
dispersion, were representative, and in environmental impacts, and the Status: Meeting OPEN to the Public
some cases, conservative, relative to the proposed action does not warrant the from 10 a.m. to 10:15 a.m. Closed
ebenthall on PRODPC61 with NOTICES

actual characteristics for the Diablo preparation of an Environmental Impact portion will commence at 10:15 a.m.
Canyon ISFSI. The staff determined that Statement. Therefore, in accordance (approx.).
any dose to affected residents nearest to with 10 CFR 51.31, NRC has determined Matters To Be Considered:
the Diablo Canyon site calculated using that issuance of a final FONSI is 1. President’s Report.
site-specific parameters will be much appropriate. 2. Tribute—David A. Sampson.

VerDate Aug<31>2005 15:27 Sep 07, 2007 Jkt 211001 PO 00000 Frm 00107 Fmt 4703 Sfmt 4703 E:\FR\FM\10SEN1.SGM 10SEN1

Вам также может понравиться