Federal Register / Vol. 72, No.

173 / Friday, September 7, 2007 / Notices 51487

ordered to be published in the Federal • Four-lane facility along US 85 from described the proposed project, the roles
Register. New Mexico Route 273 to US 62 of the agencies and the public, the
FOR FURTHER INFORMATION CONTACT: For (Paisano Drive). project need and purpose, schedule,
further information, including a list of • Four-lane boulevard from Paisano level of detail for alternatives analysis,
the exhibit objects, contact Julie Drive to Santa Fe Street. methodologies to be used in the
Simpson, Attorney-Adviser, Office of • Four six-lane boulevard environmental analysis, and the
the Legal Adviser, U.S. Department of transitioning to a six-lane barrier proposed process for coordination and
State (telephone: (202) 453–8050). The separated controlled access facility from communication.
address is U.S. Department of State, SA– Santa Fe Street to US 54. This Project Coordination Plan is
44, 301 4th Street, SW., Room 700, The proposed project would add designed to be part of a flexible and
Washington, DC 20547–0001. capacity and upgrade the existing adaptable process. The Plan will be
facility to a controlled access facility available for public review, inputs, and
Dated: August 31, 2007. comments at public meetings, including
C. Miller Crouch,
through the addition of two to four
through-lanes (one to two lanes in each scoping meetings and hearings held
Principal Deputy Assistant Secretary for throughout the National Environmental
Educational and Cultural Affairs, Department
direction).
The Border Highway West Extension Policy Act (NEPA) evaluation process,
of State. and upon request at the TxDOT El Paso
[FR Doc. E7–17697 Filed 9–6–07; 8:45 am]
EIS will evaluate build and no-build
alternatives. In addition to the build and District. Pursuant to 23 U.S.C. Chapter
BILLING CODE 4710–05–P 1 Subchapter 1 Section 139 of
no-build/no-action alternatives,
SAFETEA–LU, cooperating agencies,
Transportation System Management
participating agencies and the public
(TSM)/Transportation Demand
will be given an opportunity for input
DEPARTMENT OF TRANSPORTATION Management (TDM), mass transit, and
in the development of the project. Two
tolled and non-tolled alternatives will
public scoping meetings, conducted in
Federal Highway Administration be examined. Also, the EIS will study
an open house format, are planned to be
potential impacts from construction and
held in October 2007. These will be the
Environmental Impact Statement: El operation of the proposed roadway
first in a series of meetings to solicit
Paso County, TX including, but not limited to, the
public comments throughout the
following: transportation impacts planning process on the proposed action
AGENCY: Federal Highway (construction detours, construction
Administration (FHWA), DOT. as part of the national Environmental
traffic, mobility improvements), air and Policy Act (NEPA) process.
ACTION: Notice of Intent. noise impacts from construction The scoping meetings will provide
equipment and operation of the opportunities for participating agencies,
SUMMARY: The Federal Highway
facilities, water quality impacts from cooperating agencies, and the public to
Administration is issuing this notice to construction area and roadway storm
advise the public that an Environmental be involved in defining the need and
water runoff, impacts to waters of the purpose for the proposed project, and to
Impact Statement (EIS) will be prepared United States, impacts to historic and
for the proposed Loop 375 César Chávez assist in determining the range of
archeological resources, impacts to alternatives for consideration in the EIS
Highway (Border Highway West floodplain, socio-economic resources
Extension) in El Paso, Texas, to include and alternative evaluation
(including Environmental Justice and methodologies. Notices of the public
the Texas, New Mexico, and Ciudad Limited English Proficiency population)
Juárez, Chihuahua México border scoping meetings will be published in
indirect and cumulative impacts, land newspapers of general circulation in the
region. The proposed project is part of use, vegetation, wildlife, impacts to
an alternate route to provide congestion project area at least 30 days prior to the
and/or potential displacement of meetings, and again approximately 10
relief for Interstate 10 (I–10), an east- residences and businesses, and aesthetic
west facility north of the proposed days prior to the meetings. In addition
and visual resources. Anticipated to the public scoping meetings,
project. The project is a key element in federal permits, pending selection of
the Gateway 2030 Metropolitan correspondence describing the proposed
alternatives and field surveys may action and soliciting comments to be
Transportation Plan (MTP) prepared by include, but are not limited to, the
the El Paso Metropolitan Planning considered during the scoping process
following: Section 106 (National will be sent to the appropriate federal,
Organization (MPO). Historic Preservation Act), Section 401/
The proposed Border Highway West state, and local agencies, and to
404 (Clean Water Act), and Section 7 organizations and individuals who have
Extension would extend approximately (Endangered Species Act). A Project
13.8 miles and would provide a previously expressed or are known to
Coordination Plan will be provided in have an interest in the project. Public
continuous route from I–10 east of State accordance with Public Law 109–59, scoping meetings and public hearings
Highway (SH) 20 (Mesa Street) to Safe, Accountable, Flexible, Efficient will be held during appropriate phases
Sunland Park Drive continuing on Loop Transportation Equity Act: A Legacy for of the project development process.
375 to end at Untied States Highway Users (SAFETEA–LU), Title VI, Section Public notices will be given stating the
(US) 54. 6002, Efficient Environmental Reviews date, time and location of each and will
FOR FURTHER INFORMATION CONTACT: Mr. for Project Decision Making, August 10, be published in English as well as
Donald Davis, District Engineer (South), 2005, to facilitate and document the Spanish. The Draft EIS will be available
Federal Highway Administration, Texas lead agencies; structured interaction for public and agency review and
Division, 300 East 8th Street, Room 826, with the public and other agencies and comment prior to a public hearing.
mstockstill on PROD1PC66 with NOTICES

Austin, Texas 78701; Telephone (512) to inform the public and other agencies To ensure that the full range of issues
536–5960. of how the coordination will be related to this proposed action are
SUPPLEMENTARY INFORMATION: The accomplished. The Project Coordination addressed and all significant issues
current facility exists as follows: Plan will promote early and continuous identified, comments and suggestions
• Six-lane expressway from I–10 to involvement from stakeholders, are invited from all interested parties.
Sunland Park. agencies, and the public as well as Comments or questions concerning this

VerDate Aug<31>2005 18:34 Sep 06, 2007 Jkt 211001 PO 00000 Frm 00084 Fmt 4703 Sfmt 4703 E:\FR\FM\07SEN1.SGM 07SEN1
51488 Federal Register / Vol. 72, No. 173 / Friday, September 7, 2007 / Notices

proposed action and the EIS should be telephone: 202–372–1752, e-mail: be held within 240 days, and the
directed to FHWA at the address Roddy.C.Bachman@uscg.mil. If you Maritime Administrator must render a
provided. have questions on viewing the docket, decision on the application within 330
A proposed schedule for completion call Renee V. Wright, Program Manager, days. Additional Federal Register
of the environmental review process is Docket Operations, telephone: 202–493– notices will be published throughout
not available at this time; however, will 0402. the application review process to
become accessible for public review at SUPPLEMENTARY INFORMATION: provide notice of public hearings and
a futures date. other procedural milestones. The
Receipt of Application Maritime Administrator’s decision, and
(Catalog of Federal Domestic Assistance
program Number 20.205 Highway Planning On August 17, 2006, the Coast Guard other key documents, will be filed in the
and Construction. The regulations and the Maritime Administration public docket.
implementing Executive Order 12372 received an application from Woodside At least one public hearing will take
regarding intergovernmental consultation on Natural Gas Inc., a wholly-owned place in each adjacent coastal State. For
Federal programs and activities apply to this subsidiary of Woodside Petroleum LTD., purposes of the Act, California is the
program.) for all Federal authorizations required adjacent coastal State for this
Donald Davis, for a license to own, construct, and application. Other States can apply for
District Engineer, FHWA texas Division. operate a deepwater port authorized adjacent coastal State status in
[FR Doc. 07–4375 Filed 9–6–07; 8:45 am] under the Deepwater Port Act of 1974, accordance with 33 U.S.C. 1508(a)(2).
as amended, 33 U.S.C. 1501 et seq. (the
BILLING CODE 4910–22–M Summary of the Application/Proposed
Act). The City of Los Angeles (City) will
Action/Project
be a cooperating agency in processing
DEPARTMENT OF TRANSPORTATION this application because Woodside Woodside Natural Gas proposes to
Natural Gas, Inc. has filed an construct, own, and operate a deepwater
Maritime Administration application for a lease/franchise of port with associated ship-to-ship
offshore submerged City lands, an transfer (STS) location(s) and single
[USCG–2006–26844] point mooring (SPM) buoys for the
onshore pipeline franchise for the
subsea pipelines through City waters, receiving of regasification liquefied
Woodside Natural Gas Inc. OceanWay
and a pipeline through the City. natural gas carriers (RLNGCs), offshore
Secure Energy Liquefied Natural Gas
Revisions to the application were and onshore natural gas pipelines, and
Deepwater Port License Application
received on December 27, 2006; on July a receiving and custody transfer facility
AGENCY: Maritime Administration, DOT. 9, 2007; and again on August 20, 2007. (RCTS) to deliver natural gas with an
ACTION: Notice of application. As of the date of this notice, the annualized rate of 0.4 billion cubic feet
Maritime Administration and the Coast per day (bcf/d) and a peak of 1.1 bcf/d
SUMMARY: The Maritime Administration into the Southern California market on
Guard have determined that the
and the U.S. Coast Guard announce that application appears to contain all initial development and an annualized
they have received an application for information required by the Act to rate of 1.0 bcf/d and a peak of up to 1.6
the licensing of a natural gas deepwater proceed with the application process. bcf/d at full project development.
port, and that the application appears to The application is now available for The deepwater port would be located
contain the required information to viewing on the docket (see ADDRESSES). in the Federal waters of the Santa
proceed. This notice summarizes the Monica Basin, 21 miles from the nearest
applicant’s plans and the procedures Background point on the mainland of Southern
that will be followed in considering the According to the Deepwater Port Act, California and 18 miles from the
application. a deepwater port is a fixed or floating western end of Santa Catalina Island,
DATES: The Deepwater Port Act of 1974, manmade structure other than a vessel, approximately 27 miles southwest of
as amended, requires any public hearing or a group of structures, located beyond Los Angeles International Airport
on this application to be held not later State seaward boundaries and used or (LAX), in a water depth of
than 240 days after this notice, and intended for use as a port or terminal for approximately 3,000 feet. It would
requires a decision on the application to the transportation, storage, and further consist of two single point mooring
be made not later than 90 days after the handling of oil or natural gas for (SPM) buoys that serve as cargo
final public hearing. transportation to any State. discharge system connections for
ADDRESSES: The public docket for this Deepwater ports require a license RLNGCs, a mooring/anchoring array,
application, USCG–2006–26844, is issued by the Maritime Administrator four flexible risers that connect the
maintained by the: Department of (by delegated authority from the SPMs to four seafloor riser end
Transportation, Docket Management Secretary of Transportation, published manifolds, two pipeline end manifolds
Facility, 1200 New Jersey Avenue, SE., on June 18, 2003 (68 FR 36496)). (PLEMs) and two parallel 24-inch
West Building, Ground Floor, Room Statutory and regulatory requirements pipelines beginning on the seafloor at
W12–140, Washington, DC 20590. for licensing appear in 33 U.S.C. 1501 the PLEMs beneath the SPM buoys and
Docket contents are available for et seq. and in 33 CFR Part 148. Under continuing to shore. The SPMs would
public inspection and copying at this delegations from the Secretary of be located approximately 5 nautical
address between 9 a.m. and 5 p.m., Transportation and the Secretary of miles (5.75 miles) outside established
Monday through Friday, except Federal Homeland Security, applications are shipping lanes (SPM NE: Latitude:
holidays. The Facility’s telephone processed by the Coast Guard and the 33°41′52″ N, Longitude: 118°48′33″ W
number is 202–366–9329 and the fax Maritime Administration. Each and SPM SW: Latitude: 33°39′58″ N,
mstockstill on PROD1PC66 with NOTICES

number is 202–493–2251. The Web site application is considered on its merits. Longitude: 118°49′15″ W).
for electronic submissions or for The Act provides deadlines for Woodside has proposed three ship-to-
electronic access to docket contents is processing applications. After ship transfer locations ranging from
http://dms.dot.gov. determining that an application approximately 35 to 90 nautical miles
FOR FURTHER INFORMATION CONTACT: contains the required information, (40 to 104 miles) from shore and 55 to
Roddy Bachman, U.S. Coast Guard, public hearings on the application must 111 nautical miles (63 to 128 miles)

VerDate Aug<31>2005 18:34 Sep 06, 2007 Jkt 211001 PO 00000 Frm 00085 Fmt 4703 Sfmt 4703 E:\FR\FM\07SEN1.SGM 07SEN1

Вам также может понравиться