Federal Register / Vol. 72, No.

169 / Friday, August 31, 2007 / Notices 50361

would include economic analysis, DEPARTMENT OF ENERGY for the project. Further, if an intervenor
preparation of preliminary engineering files comments or documents with the
plans, and a study of environmental Federal Energy Regulatory Commission relating to the merits of an
impacts. Based on the results of these Commission issue that may affect the responsibilities
studies, the Applicant would decide [Project No. 12830–000, Project No. 12849– of a particular resource agency, they
whether to proceed with the preparation 000] must also serve a copy of the document
of a development application to on that resource agency.
construct and operate the project. Free Flow Power Corporation FFP h. Description of Projects: The project
s. Comments, Protests, or Motions to Project 4, LLC; Notice of Competing proposed by Free Flow Power
Intervene—Anyone may submit Applications Accepted for Filing and Corporation would consist of: (1) 900
comments, a protest, or a motion to Soliciting Comments, Motions To proposed 20-kilowatt Free Flow
intervene in accordance with the Intervene, and Protests generating units having a total installed
requirements of Rules of Practice and capacity of 18-megawatts, (2) a proposed
August 22, 2007. transmission line, and (4) appurtenant
Procedure, 18 CFR 385.210, 385.211,
385.214. In determining the appropriate Take notice that the following facilities. The Free Flow Power
action to take, the Commission will hydroelectric applications have been Corporation project would have an
consider all protests or other comments filed with the Commission and are average annual generation of 78.84-
filed, but only those who file a motion available for public inspection: gigawatt-hours and be sold to a local
a. Type of Applications: Preliminary utility.
to intervene in accordance with the
Permit (Competing). The project proposed by FFP Project
Commission’s Rules may become a
b. Applicants, Project Numbers, and 4, LLC would consist of: (1) 900
party to the proceeding. Any comments,
Dates Filed: proposed 20 kilowatt Free Flow
protests, or motions to intervene must Free Flow Power Corporation filed the generating units having a total installed
be received on or before the specified application for Project No. 12830–000 capacity of 18-megawatts, (2) a proposed
comment date for the particular on July 23, 2007. transmission line, and (4) appurtenant
application. FFP Project 4, LLC filed the facilities. The FFP Project 4, LLC project
t. Filing and Service of Responsive application for Project No. 12849–000 would have an average annual
Documents—Any filings must bear in on July 25, 2007. generation of 78.84-gigawatt-hours and
all capital letters the title c. Name of the project is Live Oak be sold to a local utility.
‘‘COMMENTS’’, ‘‘PROTEST’’, Project. The project would be located on i. The filings are available for review
‘‘MOTION TO INTERVENE’’, ‘‘NOTICE the Mississippi River in Plaquemines at the Commission in the Public
OF INTENT’’, or ‘‘COMPETING Parish, Louisiana. The project uses no Reference Room or may be viewed on
APPLICATION’’, as applicable, and the dam or impoundment. the Commission’s Web site at http://
Project Number of the particular d. Filed Pursuant to: Federal Power www.ferc.gov using the ‘‘eLibrary’’ link.
application to which the filing refers. Act, 16 U.S.C. 791a–825r. Enter the docket number excluding the
Any of the above-named documents e. Applicants Contacts: For the Free last three digits in the docket number
must be filed by providing the original Flow Power Corporation: Mr. Dan Irvin, field to access the document. For
and the number of copies provided by Free Flow Power Corporation, 69 Bridge assistance, call toll-free 1–866–208–
the Commission’s regulations to: The Street, Manchester, MA 01944, phone 3676 or e-mail
Secretary, Federal Energy Regulatory (978) 232–3536. FFP Project 4, LLC: Mr. FERCONLINESUPPORT@FERC.GOV.
Commission, 888 First Street, NE., Dan Irvin, FFP Project 22, LLC, 69 For TTY, call (202) 502–8659. A copy is
Washington, DC 20426. A copy of any Bridge Street, Manchester, MA 01944, also available for inspection and
motion to intervene must also be served phone (978) 232–3536. reproduction at the address in item e
upon each representative of the f. FERC Contact: Patricia W. Gillis, above.
Applicant specified in the particular (202) 502–8735. j. Competing Preliminary Permit—
application. g. Deadline for filing comments, Anyone desiring to file a competing
u. Agency Comments—Federal, state, protests, and motions to intervene: 60 application for preliminary permit for a
and local agencies are invited to file days from the issuance date of this proposed project must submit the
comments on the described application. notice. competing application itself, or a notice
A copy of the application may be All documents (original and eight of intent to file such an application, to
obtained by agencies directly from the copies) should be filed with: Secretary, the Commission on or before the
applicant. If an agency does not file Federal Energy Regulatory Commission, specified comment date for the
comments within the time specified for 888 First Street, NE., Washington, DC particular application (see 18 CFR 4.36).
filing comments, it will be presumed to 20426. Comments, protests, and Submission of a timely notice of intent
have no comments. One copy of an interventions may be filed electronically allows an interested person to file the
agency’s comments must also be sent to via the Internet in lieu of paper; see 18 competing preliminary permit
the Applicant’s representatives. CFR 385.2001(a)(1)(iii) and the application no later than 30 days after
v. Comments, protests and instructions on the Commission’s Web the specified comment date for the
interventions may be filed electronically site under the ‘‘e-Filing’’ link. The particular application. A competing
via the Internet in lieu of paper. See, 18 Commission strongly encourages preliminary permit application must
CFR 385.2001(a)(1)(iii) and the electronic filings. Please include the conform with 18 CFR 4.30 and 4.36.
instructions on the Commission’s Web project number (P–12830–000 or P– k. Competing Development
site at http://www.ferc.gov under the ‘‘e- 12849–000) on any comments or Application—Any qualified
motions filed. development applicant desiring to file a
sroberts on PROD1PC70 with NOTICES

Filing’’ link.
The Commission’s Rules of Practice competing development application
Kimberly D. Bose, and Procedure require all intervenors must submit to the Commission, on or
Secretary. filing documents with the Commission before a specified comment date for the
[FR Doc. E7–17244 Filed 8–30–07; 8:45 am] to serve a copy of that document on particular application, either a
BILLING CODE 6717–01–P each person in the official service list competing development application or a

VerDate Aug<31>2005 00:43 Aug 31, 2007 Jkt 211001 PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 E:\FR\FM\31AUN1.SGM 31AUN1
50362 Federal Register / Vol. 72, No. 169 / Friday, August 31, 2007 / Notices

notice of intent to file such an Washington, DC 20426. An additional Commission of the rejection notice must
application. Submission of a timely copy must be sent to Director, Division be filed within 30 days of the date of
notice of intent to file a development of Hydropower Administration and issuance of this notice, pursuant to 18
application allows an interested person Compliance, Federal Energy Regulatory CFR 385.713 (2007).
to file the competing application no Commission, at the above-mentioned
Kimberly D. Bose,
later than 120 days after the specified address. A copy of any notice of intent,
comment date for the particular competing application or motion to Secretary.
application. A competing license intervene must also be served upon each [FR Doc. E7–17246 Filed 8–30–07; 8:45 am]
application must conform with 18 CFR representative of the Applicant BILLING CODE 6717–01–P
4.30 and 4.36. specified in the particular application.
l. Notice of Intent—A notice of intent p. Agency Comments—Federal, state,
must specify the exact name, business and local agencies are invited to file DEPARTMENT OF ENERGY
address, and telephone number of the comments on the described application.
prospective applicant, and must include Federal Energy Regulatory
A copy of the application may be Commission
an unequivocal statement of intent to obtained by agencies directly from the
submit, if such an application may be Applicant. If an agency does not file [Project No: 349–133]
filed, either a preliminary permit comments within the time specified for
application or a development filing comments, it will be presumed to Alabama Power Company; Notice of
application (specify which type of have no comments. One copy of an Application For Amendment of License
application). A notice of intent must be agency’s comments must also be sent to and Soliciting Comments, Motions To
served on the applicant(s) named in this the Applicant’s representatives. Intervene, and Protests
public notice.
m. Proposed Scope of Studies Under Kimberly D. Bose, August 22, 2007.
Permit—A preliminary permit, if issued, Secretary. Take notice that the following
does not authorize construction. The [FR Doc. E7–17245 Filed 8–30–07; 8:45 am] application has been filed with the
term of the proposed preliminary permit Commission and is available for public
BILLING CODE 6717–01–P
would be 36 months. The work inspection:
proposed under the preliminary permit a. Application Type: Non-Project Use
would include economic analysis, DEPARTMENT OF ENERGY of Project Lands and Waters.
preparation of preliminary engineering b. Project No: 349–133.
plans, and a study of environmental Federal Energy Regulatory c. Date Filed: August 8, 2007.
impacts. Based on the results of these Commission d. Applicant: Alabama Power
studies, the Applicant would decide Company.
[Project No. 2576–100] e. Name of Project: Martin Dam
whether to proceed with the preparation
of a development application to Hydroelectric Project.
Before Commissioners, First Light
construct and operate the project. f. Location: Lake Martin in Tallapoosa
Hydro Generating Company; Notice
n. Comments, Protests, or Motions to County, Alabama. This project does not
Rejecting Requests for Rehearing
Intervene—Anyone may submit occupy any federal or tribal lands.
comments, a protest, or a motion to August 22, 2007. g. Filed Pursuant to: Federal Power
intervene in accordance with the On July 3, 2007, Commission staff Act, 16 U.S.C. 791 (a) 825(r) and 799
requirements of Rules of Practice and issued an order modifying and and 801.
Procedure, 18 CFR 385.210, .211, .214. approving a shoreline management plan h. Applicant Contact: Mr. Keith E.
In determining the appropriate action to pursuant to article 407 of the license for Bryant, Sr., Engineer, Hydro Services,
take, the Commission will consider all Housatonic River Project located in Alabama Power, 600 North 18th Street,
protests or other comments filed, but Fairfield, Litchfield and New Haven Post Office Box 2641, Birmingham,
only those who file a motion to Counties, Connecticut.1 On August 1, Alabama, 35291, (205) 257–1403.
intervene in accordance with the 2007 and August 2, 2007, the City of i. FERC Contacts: Any questions on
Commission’s Rules may become a Dansbury and Connecticut Department this notice should be addressed to Ms.
party to the proceeding. Any comments, of Environmental Protection filed Shana High at (202) 502–8674.
protests, or motions to intervene must requests for rehearing in this j. Deadline for filing comments and or
be received on or before the specified proceeding. motions: September 24, 2007.
comment date for the particular Under section 313(a) of the Federal All documents (original and eight
application. Power Act, 16 U.S.C. 825l(a), a request copies) should be filed with: The
o. Filing and Service of Responsive for rehearing may be filed only by a Secretary, Federal Energy Regulatory
Documents—Any filings must bear in party to the proceeding. In order to Commission, 888 First Street, NE.,
all capital letters the title become a party to any Commission Washington DC 20426.
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT proceeding, an entity must file a motion The Commission’s Rules of Practice
TO FILE COMPETING APPLICATION’’, to intervene pursuant to Rule 214 of the and Procedure require all intervenors
‘‘COMPETING APPLICATION’’, Commission’s Rules of Practice and filing documents with the Commission
‘‘PROTEST’’, and ‘‘MOTION TO Procedure, 18 CFR 385.214. The City of to serve a copy of that document on
INTERVENE’’, as applicable, and the Dansbury and Connecticut Department each person whose name appears on the
Project Number of the particular of Environmental Protection did not file official service list for the project.
application to which the filing refers. motions to intervene. Therefore, their Further, if an intervenor files comments
Any of the above-named documents or documents with the Commission
sroberts on PROD1PC70 with NOTICES

requests for rehearing are rejected.


must be filed by providing the original This notice constitutes final agency relating to the merits of an issue that
and the number of copies provided by action. Requests for rehearing by the may affect the responsibilities of a
the Commission’s regulations to: The particular resource agency, they must
Secretary, Federal Energy Regulatory 1 FirstLight Hydro Generating Co., 120 FERC ¶ also serve a copy of the document on
Commission, 888 First Street, NE., 62,010 (2007). that resource agency. A copy of any