50362 Federal Register / Vol. 72, No.

169 / Friday, August 31, 2007 / Notices

notice of intent to file such an Washington, DC 20426. An additional Commission of the rejection notice must
application. Submission of a timely copy must be sent to Director, Division be filed within 30 days of the date of
notice of intent to file a development of Hydropower Administration and issuance of this notice, pursuant to 18
application allows an interested person Compliance, Federal Energy Regulatory CFR 385.713 (2007).
to file the competing application no Commission, at the above-mentioned
Kimberly D. Bose,
later than 120 days after the specified address. A copy of any notice of intent,
comment date for the particular competing application or motion to Secretary.
application. A competing license intervene must also be served upon each [FR Doc. E7–17246 Filed 8–30–07; 8:45 am]
application must conform with 18 CFR representative of the Applicant BILLING CODE 6717–01–P
4.30 and 4.36. specified in the particular application.
l. Notice of Intent—A notice of intent p. Agency Comments—Federal, state,
must specify the exact name, business and local agencies are invited to file DEPARTMENT OF ENERGY
address, and telephone number of the comments on the described application.
prospective applicant, and must include Federal Energy Regulatory
A copy of the application may be Commission
an unequivocal statement of intent to obtained by agencies directly from the
submit, if such an application may be Applicant. If an agency does not file [Project No: 349–133]
filed, either a preliminary permit comments within the time specified for
application or a development filing comments, it will be presumed to Alabama Power Company; Notice of
application (specify which type of have no comments. One copy of an Application For Amendment of License
application). A notice of intent must be agency’s comments must also be sent to and Soliciting Comments, Motions To
served on the applicant(s) named in this the Applicant’s representatives. Intervene, and Protests
public notice.
m. Proposed Scope of Studies Under Kimberly D. Bose, August 22, 2007.
Permit—A preliminary permit, if issued, Secretary. Take notice that the following
does not authorize construction. The [FR Doc. E7–17245 Filed 8–30–07; 8:45 am] application has been filed with the
term of the proposed preliminary permit Commission and is available for public
BILLING CODE 6717–01–P
would be 36 months. The work inspection:
proposed under the preliminary permit a. Application Type: Non-Project Use
would include economic analysis, DEPARTMENT OF ENERGY of Project Lands and Waters.
preparation of preliminary engineering b. Project No: 349–133.
plans, and a study of environmental Federal Energy Regulatory c. Date Filed: August 8, 2007.
impacts. Based on the results of these Commission d. Applicant: Alabama Power
studies, the Applicant would decide Company.
[Project No. 2576–100] e. Name of Project: Martin Dam
whether to proceed with the preparation
of a development application to Hydroelectric Project.
Before Commissioners, First Light
construct and operate the project. f. Location: Lake Martin in Tallapoosa
Hydro Generating Company; Notice
n. Comments, Protests, or Motions to County, Alabama. This project does not
Rejecting Requests for Rehearing
Intervene—Anyone may submit occupy any federal or tribal lands.
comments, a protest, or a motion to August 22, 2007. g. Filed Pursuant to: Federal Power
intervene in accordance with the On July 3, 2007, Commission staff Act, 16 U.S.C. 791 (a) 825(r) and 799
requirements of Rules of Practice and issued an order modifying and and 801.
Procedure, 18 CFR 385.210, .211, .214. approving a shoreline management plan h. Applicant Contact: Mr. Keith E.
In determining the appropriate action to pursuant to article 407 of the license for Bryant, Sr., Engineer, Hydro Services,
take, the Commission will consider all Housatonic River Project located in Alabama Power, 600 North 18th Street,
protests or other comments filed, but Fairfield, Litchfield and New Haven Post Office Box 2641, Birmingham,
only those who file a motion to Counties, Connecticut.1 On August 1, Alabama, 35291, (205) 257–1403.
intervene in accordance with the 2007 and August 2, 2007, the City of i. FERC Contacts: Any questions on
Commission’s Rules may become a Dansbury and Connecticut Department this notice should be addressed to Ms.
party to the proceeding. Any comments, of Environmental Protection filed Shana High at (202) 502–8674.
protests, or motions to intervene must requests for rehearing in this j. Deadline for filing comments and or
be received on or before the specified proceeding. motions: September 24, 2007.
comment date for the particular Under section 313(a) of the Federal All documents (original and eight
application. Power Act, 16 U.S.C. 825l(a), a request copies) should be filed with: The
o. Filing and Service of Responsive for rehearing may be filed only by a Secretary, Federal Energy Regulatory
Documents—Any filings must bear in party to the proceeding. In order to Commission, 888 First Street, NE.,
all capital letters the title become a party to any Commission Washington DC 20426.
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT proceeding, an entity must file a motion The Commission’s Rules of Practice
TO FILE COMPETING APPLICATION’’, to intervene pursuant to Rule 214 of the and Procedure require all intervenors
‘‘COMPETING APPLICATION’’, Commission’s Rules of Practice and filing documents with the Commission
‘‘PROTEST’’, and ‘‘MOTION TO Procedure, 18 CFR 385.214. The City of to serve a copy of that document on
INTERVENE’’, as applicable, and the Dansbury and Connecticut Department each person whose name appears on the
Project Number of the particular of Environmental Protection did not file official service list for the project.
application to which the filing refers. motions to intervene. Therefore, their Further, if an intervenor files comments
Any of the above-named documents or documents with the Commission
sroberts on PROD1PC70 with NOTICES

requests for rehearing are rejected.


must be filed by providing the original This notice constitutes final agency relating to the merits of an issue that
and the number of copies provided by action. Requests for rehearing by the may affect the responsibilities of a
the Commission’s regulations to: The particular resource agency, they must
Secretary, Federal Energy Regulatory 1 FirstLight Hydro Generating Co., 120 FERC ¶ also serve a copy of the document on
Commission, 888 First Street, NE., 62,010 (2007). that resource agency. A copy of any

VerDate Aug<31>2005 00:43 Aug 31, 2007 Jkt 211001 PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 E:\FR\FM\31AUN1.SGM 31AUN1