Вы находитесь на странице: 1из 4

NASIR IFTIKHAR

Nationality
Year of Birth
Profession
Specialisation
Contact no
Email
Driving license

Pakistani
1978
Civil Engineer
Water and wastewater
+966-597577636
nasiriftikhar1@gmail.com
nasir0042@hotmail.com
Valid KSA driving license

KEY QUALIFICATIONS
Practising as civil engineer since 2002 and has 13 years of professional experience in design of water
and wastewater projects (stormwater drainage, sewerage, water supply system, irrigation) ,geometric
road design for site development and major infrastructure projects of UAE (Dubai, Abu Dhabi , UAQ and
Al Ain) with multinational organisations .Responsible for design, preparation of tender documents
including drawings, calculations, specifications and bill of quantities (BOQ) by using state-of-the-art
software.

EDUCATION AND PROFESSIONAL STATUS


BSc Civil Engineering, University of Engineering and Technology, Taxila, Pakistan 2002
Member of Pakistan Engineering Council

EXPERIENCE RECORD
Dec. 2012 to Present - SLFE (SNC Laval in Fayez Engineering Group)
Senior Civil Design Engineer- Sustainable projects:
Sustainable Projects:
Working as a Lead- Senior Civil Design Engineer on Sustainable projects with Saudi ARAMCO. Involve
in Design of sanitary sewerage, storm water drainage & potable water for different sustainable projects
in accordance with applicable Saudi Aramco standard engineering practices.
Expand Dhahran Residential Housing Project:
Working as a Lead-Civil Utilities on the prestigious project for development of Phase I of Project Expand
Dhahran Residential Housing of 620 villas in five different packages with Saudi ARAMCO by using State
of art Software in accordance with Aramco Standards. Packages are

Package 1 includes Site Development and Relocation of Existing Facilities along the main
Pennisula Boulevard of Dhahran project.
Package 2 includes Utilities infrastructure i,e, Detailed design of Sanitary Sewer along with two
lift stations, Storm water drainage along with proposed open channels and RCC pipe culverts
for surface runoff, Irrigation network of to be feed by an Existing TSE line for front yard and raw
water to feed backyard of villas as per DBSP (Design Basis Scope of Work)
Package 3 include the design of wet utilities for the community centre, Recreational centre, Day
care facilities, Intermediate and middle school, soccer and cricket fields.

NI/1
03/11/56365

Package 4 & 5 includes tie in connection details of House sewers with main trunk sewer for 621
no. of villas and irrigation valve boxes design for connection with main irrigation line.
Also working on Phase II of the Dhahran residential Housing consists of 226 villas with Gas
station, Storage warehouse and Saudi Aramco Medical Storage facilities. Work includes the
Project Proposal & Detailed Design of non electric Utilities in two packages.

October 2010 Nov 2012 MOTT MACDONALD GROUP


Senior Civil Design Engineer Water and Environment Division Bahrain
Bahrain Water Transmission Project (October 2010Present):
Worked as a Civil Design Engineer in the pipeline detailed design for two packages 4607- Package 1 &
4608 Package-2 including the pipe diameters design of about 17.5km & 10km length consists of
horizontal and vertical alignment of pipes, chambers design and connection details. Also involve in the
draft preparation of Water Stations East package. The work consists of pipe works for inlets, outlets and
overflow pipes for proposed elevated storage reservoirs (ESR), drainage lay out and tie-in connections
with existing distribution network.
DN900 Pipeline from Mafraq Flyover to Khalifa City A Interchange: Worked on the cost estimate
and technical specifications DN 900 pipeline from Mafraq Flyover to Khalifa City A interchange. The
length of Pipe is about 12 KMs inside the corridor approved by the Municipality. Considering the other
services clashing the best route was adopted.
Ras Ghurab pipeline Cost Estimate: Worked on the Ras Ghurab pipeline cost estimates by taking
main supply from Sea water Intake pumping station after crossing through Desalination plant. The
proposed Ground Storage tanks after Distribution pumping station feed the main distribution network.

March 2010 Oct 2010

BAHRIA TOWN (PVT) LIMITED


Senior Infrastructure Engineer

Phase VII Bahria Town Islamabad 2000 Kanals Design of wet services including stormwater,
sewerage, water supply, Geometric Design of roads Using Road Calc and improvement of existing
drainage system with slope analysis.
Phase VIII Bahria Town Islamabad 50,000 Kanals Design of new wet service including stormwater,
sewerage, water supply and improvement of existing drainage system with slope analysis.
Country Garden Bahria Town Lahore 800 Kanals: Design of main infrastructure components like
road, sewerage and stormwater by using state-of-the-art software.

April 2007 June 2009

WS ATKINS, Abu Dhabi, UAE


Infrastructure Engineer

Abu Dhabi International Airport Expansion Etihad Terminal Worked on the wet services Design
including network design, manhole schedule, proposed road layout and overall services clashing with
specification as per Abu Dhabi Municipality standards.

NI/2
03/11/56365

Masdar City Infrastructure Design of potable water, treated sewage effluent (TSE) and wastewater
rising main in 6.4km to achieve zero-emission, zero-waste and zero-carbon city.
Zayed Sports City Development Worked on the detail design of Phases 1A, 1B, 2, 3, 4, 5 and 6
including stadium podium, sports medical, indoor sports and beachfront villas of an area of 200
hectares. The design includes all the utilities including water, wastewater, irrigation, chilled water and
stormwater drainage of an area of 8.4 hectares.
Highland Resort Villas Phase 1 Worked on the service reservation, hydraulic design of wet
services stormwater, sanitary sewerage and final schedules as per Abu Dhabi Municipality standards
from tendering to the final detail design stage.
International Petroleum Investment Company (IPIC) Headquarters Worked on the design of wet
services of both tower and low-rise portion of IPIC headquarters in liaising with concerned approval
authorities.
Shiab Al Ashkar, Al Ain Worked on the design of sanitary sewerage and stormwater drainage of
about 560 hectares area of Shiab Al Ashkar in Al Ain consisting of villas with parks and other
accessories from concept design to detailed design stage by adopting the standards of Al Ain
Municipality. It also included the method of measurement for different type of pipe material and
excavation, bedding quantities.

Mina Zayed Waterfront Worked on the conceptual design of Mina Zayed waterfront area which
includes the relocation of existing services with the proposal of newly designed utilities by calculating
all the demands of the proposed structure as per local municipality standards.

Nov 2003 April 2007 HALCROW (PVT) LIMITED


Assistant Engineer (Water and Sanitation Department)
Defence Housing Authority (DHA) Phase II, Islamabad Design for the wet services of DHA
Phase II (a project of EMAAR) located in Islamabad. The scope of work included the preparation of
conceptual networks by considering site factors, detail design of all wet services using state-of-the-art
software WINDES and the preparation of BOQ. The total project area is 1500 acres.
Mina Al Arab, Dubai, UAE Design for the sanitary sewer and stormwater drainage of Mina Al Arab
area located in UAE. The scope of work included the network marking for all wet services, hydraulic
design using software WINDES and preparation of BOQ on civil engineering standards of method of
measurement (CESMM).
La Ville Contemporaine (LVC) Dubai Design for the wet services of area located in Dubai. The
scope of work included the network marking and hydraulic design using WINDES and preparation of
BOQ on CESMM format.
Project included:

Area 1 Business Bay 372,98ha


Area 2 Dubai Health Care Centre (DHCC) II 174,68ha
Area 3 the Lagoon 524,72ha

Dubai Land Residence City (DLRC), Dubai Design of wet services for DLRC. The scope of work
included the network marking and hydraulic design using WINDES and preparation of BOQ on
NI/3
03/11/56365

CESMM.
Project included:

Anthenopolis 185,21ha
The City 159,41ha
Friscoridge 129,30ha

Sharjah Areas 8
Design for the wet services mainly stormwater drainage and sanitary sewerage of six areas of
Sharjah. Responsibilities included preliminary and detailed design of sewer network using survey data
and finished grade levels respectively, hydraulic design using software WINDES, preparation of
manhole schedule including schematic layouts, conflict resolution of foul networks with other services
and preparation of BOQ in CESMM format.

August 2003 Nov 2003

NATIONAL RURAL SUPPORT PROGRAMME

Mubarik Ali Infrastructure Project (August 2003- Nov 2003): Field engineer in physical
infrastructure and technical development (PITD) involving site supervision and construction activities
for design of roads, sewerage and water supply schemes and their implementation in communities
using their resources.

COMPUTER SKILLS

MS Office
WinDES- Micro Drainage
Auto CAD
Sewer CAD
Storm CAD
Eagle Point- Road Calc

LANGUAGE CAPABILITY
Urdu
English
Arabic

NI/4
03/11/56365

:
:
:

Mother tongue
Spoken fluent; written fair; reading good
Spoken- Good; written fair, reading- Good

Вам также может понравиться