Академический Документы
Профессиональный Документы
Культура Документы
than 1 ac-ft, at an elevation of about forth in the heading the name of the The Commission’s Rules of Practice
4,844 ft above msl; and (iii) Adit 8 applicant and the project number of the require all intervenors filing documents
Diversion, with a usable capacity of less application to which the filing with the Commission to serve a copy of
than 1 ac-ft, at an elevation of about responds; (3) furnish the name, address, that document on each person on the
4,825 ft above msl. and telephone number of the person official service list for the project.
• Water conveyance systems (i) protesting or intervening; and (4) Further, if an intervenor files comments
Tunnel No. 1, about 2 miles long, otherwise comply with the requirements or documents with the Commission
conveys water from Huntington Lake of 18 CFR 385.2001 through 385.2005. relating to the merits of an issue that
through an 84-inch diameter pipe to Big Agencies may obtain copies of the may affect the responsibilities of a
Creek Powerhouse No. 1.; (ii) Tunnel application directly from the applicant. particular resource agency, they must
No. 2, approximately 4.1 miles long, A copy of any protest or motion to also serve a copy of the document on
conveys water from the Dam 4 intervene must be served upon each that resource agency.
impoundment just downstream of representative of the applicant specified Motions to intervene and protests may
Powerhouse 1 to Big Creek Powerhouse in the particular application. be filed electronically via the Internet in
No. 2. Water from Ely and Balsam Creek lieu of paper. The Commission strongly
diversions also enter into Tunnel No. 2 Kimberly D. Bose, encourages electronic filings. See 18
between the forebay and powerhouse; Secretary. CFR 385.2001(a)(1)(iii) and the
and (iii) The Shoo Fly, conveys water [FR Doc. E7–13519 Filed 7–11–07; 8:45 am] instructions on the Commission’s Web
from Shaver Lake (FERC Project No. 67) BILLING CODE 6717–01–P site (http://www.ferc.gov) under the ‘‘e-
through Tunnel 5 and into Tunnel 2 Filing’’ link.
leading to Powerhouse No. 2. The Shoo k. This application has been accepted,
Fly was used during the construction of DEPARTMENT OF ENERGY but is not ready for environmental
Shaver Lake Dam and Powerhouse No. analysis at this time.
2A to keep water off the dam and to get Federal Energy Regulatory l. Description of Project: The existing
more generation from Powerhouse No. Commission Big Creek No. 3 Hydroelectric Power
2. Although not currently in use, the [P–120–020] Project consists of one powerhouse; one
Shoo Fly Complex gives SCE the moderate-sized dam and forebay; and
flexibility to divert water from Shaver Southern California Edison Company; one water conveyance system. The
Lake to Powerhouse No. 2, if required. Notice of Application Accepted for Project is operated as a reservoir-storage
m. A copy of the application is Filing and Soliciting Motions To type plant with an installed operating
available for review at the Commission Intervene and Protests capacity of 174.45 MW. Water for the
in the Public Reference Room or may be Project is taken from the San Joaquin
viewed on the Commission’s Web site at July 5, 2007. River just downstream of its confluence
http://www.ferc.gov using the Take notice that the following with Big Creek and conveyed to the Big
‘‘eLibrary’’ link. Enter the docket hydroelectric application has been filed Creek No. 3 Powerhouse through
number excluding the three digits in the with the Commission and is available Tunnel No. 3. The energy generated by
docket number field to access the for public inspection. the Project is transmitted to the SCE
document. For assistance, please contact a. Type of Application: New License transmission and distribution system
FERC Online Support at for Major Project-Existing Dam. and used for public utility purposes.
FERCOnlineSupport@ferc.gov or toll b. Project No.: P–120–020. The project would have an average
free at (866) 208–3676, or for TTY, c. Date Filed: February 23, 2007. annual generation of 804,240 megawatt-
contact (202) 502–8659. A copy is also d. Applicant: Southern California hours.
available for inspection and Edison Company. • Powerhouse: Big Creek Powerhouse
reproduction at the address in item h e. Name of Project: Big Creek No. 3 No. 3, with five turbine generator units.
above. Hydroelectric Power Project. • Moderate-sized dam and forebay:
You may also register online at http:// f. Location: The Big Creek No. 3 Dam 6 and Dam 6 Impoundment, with
www.ferc.gov/docs-filing/ Hydroelectric Project is located in a capacity of about 933 ac-ft, at an
esubscription.asp to be notified via e- Fresno and Madera Counties, California elevation of about 2,230 ft above mean
mail of new filings and issuances near the town of Auberry within the San sea level (msl).
related to this or other pending projects. Joaquin River watershed. The Project • Water conveyance system:
For assistance, contact FERC Online occupies 377.16 acres of federal lands. Powerhouse No. 3 water conveyance
Support. g. Filed Pursuant to: Federal Power system, about 5.3 miles long, conveys
n. Anyone may submit a protest or a Act 16 U.S.C. 791 (a)–825(r). water from Dam No. 6 Impoundment to
motion to intervene in accordance with h. Applicant Contact: Russ W. Big Creek Powerhouse No. 3 through a
the requirements of Rules of Practice Krieger, Vice President, Power tunnel with a capacity of about 3,250
and Procedure, 18 CFR 385.210, Production, Southern California Edison cfs. The system includes a pressure-
385.211, and 385.214. In determining Company, 300 North Lone Hill Ave., relief valve system and penstocks
the appropriate action to take, the San Dimas, California 91773. Phone: providing pressurized water from the
Commission will consider all protests (909) 394–8667. tunnel to the turbine.
filed, but only those who file a motion i. FERC Contact: Jim Fargo, (202) 502– m. A copy of the application is
to intervene in accordance with the 6095, or e-mail: james.fargo@ferc.gov available for review at the Commission
Commission’s Rules may become a j. Deadline for filing motions to in the Public Reference Room or may be
party to the proceeding. Any protests or intervene and protests: 60 days from the viewed on the Commission’s Web site at
motions to intervene must be received issuance date of this notice. http://www.ferc.gov using the
rwilkins on PROD1PC63 with NOTICES
on or before the specified deadline date All documents (original and eight ‘‘eLibrary’’ link. Enter the docket
for the particular application. copies) should be filed with: Kimberly number excluding the three digits in the
All filings must (1) bear in all capital D. Bose, Secretary, Federal Energy docket number field to access the
letters the title ‘‘PROTEST’’ or Regulatory Commission, 888 First document. For assistance, please contact
‘‘MOTION TO INTERVENE;’’ (2) set Street, NE., Washington, DC 20426. FERC Online Support at
VerDate Aug<31>2005 16:42 Jul 11, 2007 Jkt 211001 PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 E:\FR\FM\12JYN1.SGM 12JYN1
38078 Federal Register / Vol. 72, No. 133 / Thursday, July 12, 2007 / Notices
hydroelectric application has been filed pools; eight small diversions; six water of flowline from Mono Diversion and
with the Commission and is available conveyance systems; and one 1.4 miles of flowline and tunnel from
for public inspection. transmission line. The project would Bear Creek Diversion connect at the
a. Type of Application: New License have an average annual generation of Mono-Bear Wye and continues for about
for Major Project—Existing Dam. 1,125,429 megawatt-hours. 2.6 miles through a combined flowline/
VerDate Aug<31>2005 16:42 Jul 11, 2007 Jkt 211001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 E:\FR\FM\12JYN1.SGM 12JYN1