35458 Federal Register / Vol. 72, No.

124 / Thursday, June 28, 2007 / Notices

an amendment to the ISO Tariff 2007 Description: Dresden Energy, LLC call (866) 208–3676 (toll free). For TTY,
Reference Price Amendment. submits a Notice of Cancellation of a call (202) 502–8659.
Filed Date: 6/14/2007. revised tariff sheet to terminate its Kimberly D. Bose,
Accession Number: 20070618–0125. market–based rate tariff, designated as
Comment Date: 5 p.m. Eastern Time Secretary.
FERC Electric Tariff, Original Volume 1.
on Thursday, July 5, 2007. [FR Doc. E7–12468 Filed 6–27–07; 8:45 am]
Filed Date: 6/18/2007. BILLING CODE 6717–01–P
Docket Numbers: ER07–1039–000.
Applicants: Central Maine Power. Accession Number: 20070619–0143.
Description: Central Maine Power Comment Date: 5 p.m. Eastern Time
DEPARTMENT OF ENERGY
Company submits an executed Form of on Monday, July 9, 2007.
Local Service agreement for point–to– Federal Energy Regulatory
Any person desiring to intervene or to
point service and executed Service Commission
protest in any of the above proceedings
Agreement for Local Network
Transmission Service. must file in accordance with Rules 211
and 214 of the Commission’s Rules of [Project No. 12447–001]
Filed Date: 6/15/2007.
Accession Number: 20070618–0126. Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern Fort Dodge Hydroelectric Development
Comment Date: 5 p.m. Eastern Time Co; Notice of Availability of
on Friday, July 6, 2007. time on the specified comment date. It
is not necessary to separately intervene Environmental Assessment
Docket Numbers: ER07–1041–000.
Applicants: Avista Corporation. again in a subdocket related to a June 21, 2007.
Description: Avista Corporation compliance filing if you have previously In accordance with the National
submits Second Revised Sheet 6 et al to intervened in the same docket. Protests Environmental Policy Act of 1969 and
its FERC Rate Schedule 323. will be considered by the Commission the Federal Energy Regulatory
Filed Date: 6/18/2007. in determining the appropriate action to Commission’s regulations, 18 CFR Part
Accession Number: 20070619–0157. be taken, but will not serve to make 380 (Order No. 486, 52 FR 47879), the
Comment Date: 5 p.m. Eastern Time protestants parties to the proceeding. Office of Energy Projects has reviewed
on Monday, July 9, 2007. Anyone filing a motion to intervene or the application for an original license
Docket Numbers: ER07–1042–000. protest must serve a copy of that for the Fort Dodge Mill Dam
Applicants: Southern California document on the Applicant. In reference Hydroelectric Project (project), to be
Edison Company. to filings initiating a new proceeding, located on the Des Moines River in
Description: Southern California interventions or protests submitted on Webster County, Iowa, and has prepared
Edison Company submits revised rate or before the comment deadline need an Environmental Assessment (EA). In
sheets to the Interconnection Facilities not be served on persons other than the the EA, Commission staff analyzed the
Agreement with Gas Recovery Systems Applicant. potential environmental effects of
Inc, Service Agreement 118 etc. licensing the project and conclude that
The Commission encourages
Filed Date: 6/18/2007. issuing a license for the project, with
electronic submission of protests and
Accession Number: 20070619–0158. appropriate environmental measures,
interventions in lieu of paper, using the would not constitute a major federal
Comment Date: 5 p.m. Eastern Time FERC Online links at http://
on Monday, July 9, 2007. action significantly affecting the quality
www.ferc.gov. To facilitate electronic of the human environment.
Docket Numbers: ER07–1043–000. service, persons with Internet access A copy of the EA is on file with the
Applicants: Southern California who will eFile a document and/or be Commission and is available for public
Edison Company. listed as a contact for an intervenor inspection. The EA may also be viewed
Description: Southern California must create and validate an on the Commission’s Web site at
Edison Company submits a Small eRegistration account using the http://www.ferc.gov using the
Generator Interconnection Agreement eRegistration link. Select the eFiling ‘‘eLibrary’’ link. Enter the docket
and a Service Agreement for Wholesale link to log on and submit the number excluding the last three digits in
Distribution Service with Cambrian intervention or protests. the docket number field to access the
Energy Woodville LLC. document. For assistance, contact FERC
Filed Date: 6/18/2007. Persons unable to file electronically
should submit an original and 14 copies Online Support at
Accession Number: 20070619–0159. FERCOnlineSupport@ferc.gov or toll-
Comment Date: 5 p.m. Eastern Time of the intervention or protest to the
Federal Energy Regulatory Commission, free at 1–866–208–3676, or for TTY,
on Monday, July 9, 2007. (202) 502–8659.
888 First St., NE., Washington, DC
Docket Numbers: ER07–1045–000. Any comments should be filed within
20426.
Applicants: Kentucky Utilities 30 days from the issuance date of this
Company. The filings in the above proceedings notice, and should be addressed to the
Description: E.ON US, LLC submits a are accessible in the Commission’s Secretary, Federal Energy Regulatory
Letter Agreement between Kentucky eLibrary system by clicking on the Commission, 888 First Street, NE.,
Utilities Co and twelve existing KU appropriate link in the above list. They Room 1–A, Washington, DC 20426.
wholesale municipal customers which are also available for review in the Please affix ‘‘Fort Dodge Mill Dam
receive power from the Southeastern Commission’s Public Reference Room in Hydroelectric Project No. 12447–001’’ to
Power Administration. Washington, DC. There is an all comments. Comments may be filed
mstockstill on PROD1PC66 with NOTICES

Filed Date: 6/15/2007. eSubscription link on the Web site that electronically via Internet in lieu of
Accession Number: 20070619–0134. enables subscribers to receive e-mail paper. The Commission strongly
Comment Date: 5 p.m. Eastern Time notification when a document is added encourages electronic filings. See 18
on Friday, July 6, 2007. to a subscribed docket(s). For assistance CFR 385.2001(a)(1)(iii) and the
Docket Numbers: ER07–1046–000. with any FERC Online service, please e- instructions on the Commission’s Web
Applicants: Dresden Energy, LLC. mail FERCOnlineSupport@ferc.gov. or site under the ‘‘eFiling’’ link. For further

VerDate Aug<31>2005 18:23 Jun 27, 2007 Jkt 211001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 E:\FR\FM\28JNN1.SGM 28JNN1
Federal Register / Vol. 72, No. 124 / Thursday, June 28, 2007 / Notices 35459

information, contact Patrick Murphy at files comments or documents with the application allows an interested person
(202) 502–8755. Commission relating to the merits of an to file the competing application no
issue that may affect the responsibilities later than 120 days after the specified
Kimberly D. Bose,
of a particular resource agency, they comment date for the particular
Secretary. must also serve a copy of the document application. A competing license
[FR Doc. E7–12479 Filed 6–27–07; 8:45 am] on that resource agency. application must conform with 18 CFR
BILLING CODE 6717–01–P j. Description of Existing Facilities 4.30(b) and 4.36.
and Proposed Project: The proposed o. Notice of Intent: A notice of intent
project, utilizing the existing U.S. Army must specify the exact name, business
DEPARTMENT OF ENERGY Corps of Engineers’ Fall Creek Dam and address, and telephone number of the
reservoir would consist of: (1) A prospective applicant, and must include
Federal Energy Regulatory proposed intake structure, (2) a an unequivocal statement of intent to
Commission proposed 650-foot-long, 144-inch- submit, if such an application may be
[Project No. 12778–001] diameter steel penstock, (3) a proposed filed, either a preliminary permit
powerhouse containing three generator application or a development
Fall Creek Hydro, LLC; Notice of units with an installed capacity of 10.0 application (specify which type of
Application Accepted for Filing and megawatts, (4) a 1.0-mile-long, 15 kV application). A notice of intent must be
Soliciting Comments, Protests, and transmission line, and (5) appurtenant served on the applicant(s) named in this
Motions To Intervene facilities. The project would have an public notice.
annual generation of 18.7 GWh. p. Proposed Scope of Studies under
June 21, 2007. k. Location of Applications: A copy of Permit: A preliminary permit, if issued,
Take notice that the following the application is available for does not authorize construction. The
hydroelectric application has been filed inspection and reproduction at the term of the proposed preliminary permit
with the Commission and is available Commission in the Public Reference would be 36 months. The work
for public inspection: Room or may be viewed on the proposed under the preliminary permit
a. Type of Application: Preliminary Commission’s Web site at http:// would include economic analysis,
Permit. www.ferc.gov using the ‘‘eLibrary’’ link. preparation of preliminary engineering
b. Project No.: 12778–001. Enter the docket number excluding the plans, and a study of environmental
c. Date filed: March 12, 2007. last three digits in the docket number impacts. Based on the results of these
d. Applicant: Fall Creek Hydro, LLC. field to access the document. For studies, the Applicant would decide
e. Name and Location of Project: The assistance, call toll-free 1–866–208– whether to proceed with the preparation
proposed Fall Creek Hydroelectric 3676 or e-mail of a development application to
Project would be located on Fall Creek FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.
in Lane County, Oregon. The existing call (202) 502–8659. A copy is also q. Comments, Protests, or Motions to
Fall Creek Dam is administered by the available for inspection and Intervene: Anyone may submit
U.S. Army Corps of Engineers. reproduction at the address in item g comments, a protest, or a motion to
f. Filed Pursuant to: Federal Power above. intervene in accordance with the
Act, 16 U.S.C. 791(a)–825(r). l. Individuals desiring to be included requirements of Rules of Practice and
g. Applicant contact: Mr. Brent Smith, on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214.
Northwest Power Services, Inc., 975 so indicate by writing to the Secretary In determining the appropriate action to
South State Highway, Logan, UT 84321, of the Commission. take, the Commission will consider all
(208) 745–0834. m. Competing Preliminary Permit: protests or other comments filed, but
h. FERC Contact: Tom Papsidero, Anyone desiring to file a competing only those who file a motion to
(202) 502–6002. application for preliminary permit for a intervene in accordance with the
i. Deadline for filing comments, proposed project must submit the Commission’s Rules may become a
protests, and motions to intervene: 60 competing application itself, or a notice party to the proceeding. Any comments,
days from the issuance date of this of intent to file such an application, to protests, or motions to intervene must
notice. the Commission on or before the be received on or before the specified
All documents (original and eight specified comment date for the comment date for the particular
copies) should be filed with Kimberly D. particular application (see 18 CFR 4.36). application.
Bose, Secretary, Federal Energy Submission of a timely notice of intent Comments, protests and interventions
Regulatory Commission, 888 First allows an interested person to file the may be filed electronically via the
Street, NE., Washington, DC 20426. competing preliminary permit Internet in lieu of paper; See 18 CFR
Comments, protests and interventions application no later than 30 days after 385.2001(a)(1)(iii) and the instructions
may be filed electronically via the the specified comment date for the on the Commission’s web site under ‘‘e-
Internet in lieu of paper; see 18 CFR particular application. A competing filing’’ link. The Commission strongly
385.2001(a)(1)(iii) and the instructions preliminary permit application must encourages electronic filing.
on the Commission’s Web site under the conform with 18 CFR 4.30(b) and 4.36. r. Filing and Service of Responsive
‘‘e-Filing’’ link. The Commission n. Competing Development Documents: Any filings must bear in all
strongly encourages electronic filings. Application: Any qualified development capital letters the title ‘‘COMMENTS’’,
Please include the project number (P– applicant desiring to file a competing ‘‘NOTICE OF INTENT TO FILE
12778–001) on any comments or development application must submit to COMPETING APPLICATION’’,
motions filed. the Commission, on or before a ‘‘COMPETING APPLICATION’’,
mstockstill on PROD1PC66 with NOTICES

The Commission’s Rules of Practice specified comment date for the ‘‘PROTEST’’, or ‘‘MOTION TO
and Procedure require all intervenors particular application, either a INTERVENE’’, as applicable, and the
filing documents with the Commission competing development application or a Project Number of the particular
to serve a copy of that document on notice of intent to file such an application to which the filing refers.
each person in the official service list application. Submission of a timely Any of the above-named documents
for the project. Further, if an intervenor notice of intent to file a development must be filed by providing the original