INSTITUTE

Step 01
a. Lift
b. Slide
c. Lift
d. Slide
e. Slide

INSTITUTE

Step 02
a. Lift
b. Slide
c. Lift
d. Slide
e. Bolting

INSTITUTE

Step 03
a. Lift
b. Slide
c. Lift
d. Slide
e. Bolting

INSTITUTE

Step 04
a. Slide
b. Bolting

INSTITUTE

Step 05
a. Lift
b. Slide
c. Lift
d. Slide
e. Slide

INSTITUTE

Step 06
a. Lift
b. Slide
c. Lift
d. Slide
e. Bolting

INSTITUTE

Step 07
a. Lift
b. Slide
c. Lift
d. Slide
e. Bolting

INSTITUTE

Step 08
a. Slide
b. Bolting

INSTITUTE

Step 00
a. ...
b. ...

INSTITUTE

Step 01
a. Assembly Girder Section 9-10 on Table
b. Lifting Girder Section 9-10

INSTITUTE

Step 02
Connecting and bolting.

INSTITUTE

Step 03
Install Sling

INSTITUTE

Step 04
Disconnect lifting beam

INSTITUTE

Step 05
Concreting

INSTITUTE

Step 06
Moving and waiting for lift section 10-11

INSTITUTE

Step 07
Lifting Girder Section 7-8

INSTITUTE

Step 08
Connecting and bolting

INSTITUTE

Step 09
Install Sling

INSTITUTE

Step 10
Disconnect lifting beam

INSTITUTE

Step 11
a. Concreting section 7-8.
b. Lifting Girder Section 10-11.

INSTITUTE

Step 12
a. Moving and waiting for lift section 6-7.
b. Connecting and bolting Girder Section 10-11.

INSTITUTE

Step 13
a. Lifting Girder Section 6-7.
b. Install Sling Girder Section 10-11.

INSTITUTE

Step 14
a. Connecting and bolting Girder Section 6-7.
b. Disconnect lifting beam Girder Section 10-11.

INSTITUTE

Step 15
a. Install Sling Girder Section 6-7.
b. Concreting Girder Section 10-11.

INSTITUTE

Step 01
a. Connected section 8 to strand jack.
b. Make sure all connector are save to lift.

INSTITUTE

Step 02
a. Lift the Section 8 until 700 mm up to top of pedestal.
b. Install beam of temporary bridge for slide.

INSTITUTE

Step 03
a. Make sure temporary bridge for slide.
b. Degrading section 8 to temporary bridge.

INSTITUTE

Step 04
a. Slide section 8 over than pedestal.

INSTITUTE

Step 05
a. Connected Section 7 to strand jack.
b. Make sure all connection in save condition.

INSTITUTE

Step 06
a. Lift Section 7 until to true position.
b. Connected all connector on true condition.

INSTITUTE

Step 07
a. Slide section 8 to position for lift.

INSTITUTE

Step 8
a. Connect section 8 to strand jack.
b. Lift Section 8 up to 100 mm.
c. Uninstall temporary bridge.

INSTITUTE

Step 09
a. Uninstall temporary bridge.

INSTITUTE

Step 10
a. Degrading Section 8 until on true position.

INSTITUTE

Step 11
Finish