Академический Документы
Профессиональный Документы
Культура Документы
CONDITIONS
Material Pumped
Phosphorus Trichloride
P.T=Pumping Temperature (C)
20
Q=Flowrate (m3/h)
Design
11.0
Normal
###
Density (kg/m3)
1585
u=Viscosity (cP)
0.64
Pvp*=Vapour Pressure (mbar)
Vessel Press (barA)
Suction
1
Discharge
Ctrl Vlv Loss (bar)
0.00
Equip.Loss (bar)
Orifice (mm)
Pipe (Material)
CS
Schedule
Nominal Size (ins)
Suction
2
Discharge
d,Actual ID (mm)
Suction
52.5
Discharge
* At Pumping Temperature
11
131
1
0
1000
40
1.5
40.89
0.936
(m)
18.830
(m)
HEAD(m)
2.76
6.08
3.04
0
0
11.88
*
*
*
*
*
8
19.88
HEAD(m)
2.76
22.8
3.12
0.69
0
29.37
SUCTION
6.435
2.000
DISCHARGE
6.435
-1.038
0.000
0.000
0.000
7.397
28.541
28.54 m
-7.40 m
21.14 m
SYSTEM POWER
* Efficiency(note4)=
0.6
(<1)
Estimated Power=
### (KW)
NOTES
1.Assume control valve loss to be 70% to 100%
of piping plus equipment friction loss for initial
calculation. Consult instrument engineer for
final selection.
2.All suction side values to be input negatively,
and discharge side values to be input positively
3.Control valves and orifices not normally used
in pump suction.
NPSH
Suction Head Sum
Pvp
NPSH Available
3.000
19.106
0.000
0.000
0.000
81
110.37
7.40 m
-0.84 m
6.55 m
DUTY / CASE
CONDITIONS
Material Pumped
Phosphorus Trichloride
P.T=Pumping Temperature (C)
15.5
Q=Flowrate (m3/h)
Design
15.0
Normal
###
Density (kg/m3)
1585
u=Viscosity (cP)
5
Pvp*=Vapour Pressure (mbar)
Vessel Press (barA)
Suction
1
Discharge
Ctrl Vlv Loss (bar)
0.00
Equip.Loss (bar)
Orifice (mm)
Pipe (Material)
CS
Schedule
Nominal Size (ins)
Suction
2
Discharge
d,Actual ID (mm)
Suction
52.5
Discharge
* At Pumping Temperature
11
130
1
0
25
40
1.5
40.89
2.107
(m)
8.921
(m)
HEAD(m)
2.76
6.08
3.04
0
0
11.88
*
*
*
*
*
8
19.88
HEAD(m)
2.76
6.84
0.78
0
0
10.38
SUCTION
6.435
1.000
DISCHARGE
6.435
-2.296
0.000
0.000
0.000
5.139
31.737
31.74 m
-5.14 m
26.60 m
SYSTEM POWER
* Efficiency(note4)=
0.6
(<1)
Estimated Power=
### (KW)
NOTES
1.Assume control valve loss to be 70% to 100%
of piping plus equipment friction loss for initial
calculation. Consult instrument engineer for
final selection.
2.All suction side values to be input negatively,
and discharge side values to be input positively
3.Control valves and orifices not normally used
in pump suction.
NPSH
Suction Head Sum
Pvp
NPSH Available
6.000
9.435
0.000
9.867
0.000
5.14 m
-0.84 m
4.30 m
14
24.38
DUTY / CASE
CONDITIONS
Material Pumped
Phosphorus Trichloride
P.T=Pumping Temperature (C)
15.5
Q=Flowrate (m3/h)
Design
15.0
Normal
###
Density (kg/m3)
1585
u=Viscosity (cP)
5
Pvp*=Vapour Pressure (mbar)
Vessel Press (barA)
Suction
1
Discharge
Ctrl Vlv Loss (bar)
0.00
Equip.Loss (bar)
Orifice (mm)
Pipe (Material)
CS
Schedule
Nominal Size (ins)
Suction
2
Discharge
d,Actual ID (mm)
Suction
52.5
Discharge
* At Pumping Temperature
11
130
1
0
25
40
1.5
40.89
2.107
(m)
36.800
(m)
HEAD(m)
2.76
6.08
3.04
0
0
11.88
*
*
*
*
*
8
19.88
HEAD(m)
5.52
22.8
1.56
0.69
0
30.57
SUCTION
6.435
1.000
DISCHARGE
6.435
-2.296
0.000
0.000
0.000
5.139
59.616
59.62 m
-5.14 m
54.48 m
SYSTEM POWER
* Efficiency(note4)=
0.6
(<1)
Estimated Power=
### (KW)
NOTES
1.Assume control valve loss to be 70% to 100%
of piping plus equipment friction loss for initial
calculation. Consult instrument engineer for
final selection.
2.All suction side values to be input negatively,
and discharge side values to be input positively
3.Control valves and orifices not normally used
in pump suction.
NPSH
Suction Head Sum
Pvp
NPSH Available
6.000
37.315
0.000
9.867
0.000
70
100.57
5.14 m
-0.84 m
4.30 m
Flow
m3/h
0.0
2.0
4.0
6.0
8.0
10.0
12.0
8.00
7.00
Pump
Curve
m
18.0
18.0
18.0
17.9
17.9
17.7
17.6
System Case
Max.Level
Min.Level
m
m
0.0
0.0
3.2
6.2
6.4
9.4
11.4
14.4
18.1
21.1
26.6
29.6
36.9
39.9
18.11
17.52
Design Point 1
Design Point 2
Head (m)
40.0
35.0
30.0
25.0
20.0
15.0
10.0
5.0
0.0
0.0
2.0
4.0
6.0
8.0
10.0
Flow (m3/h)
Pump Curve
Design Point 1
Design Point 2
Max.Level
Min.Level
12.0
14.0
0.0
0.0
2.0
4.0
6.0
8.0
10.0
Flow (m3/h)
Pump Curve
Design Point 1
Design Point 2
Max.Level
Min.Level
12.0
14.0
2.0
14.0
2.0
14.0
Schedule 40
In
mm
1.049
26.64
1.610
40.89
2.067
52.50
3.068
77.92
4.026
102.26
5.047
128.19
6.065
154.05
7.981
202.72
10.020
254.51
EQUIVALENT LENGTHS
Gate
Globe
wye
Angle
Factors
0.34
8.54
4.27
4.27
Fluid Velocity
Fluid Density x
Fluid Viscosity
Actual Diameter
If Re > 2100 (Formula taken from Std T2.3 Std 5, Approximate Moody Formula)
Friction Factor
0.0055 x
Friction Factor
64
Reynolds No.
Pressure Drop
or
If Re < 2100
Type of Pipe
Pipe Roughness (mm)
Drawn Tubing (Copper, Glass, Stainless Steel, 0.0015
Commercial Steel Pipe
0.046
Asphalt Dipped Cast Iron Pipe
0.122
Galvinised Iron Pipe
0.152
Bare Cast Iron Pipe
0.26
Concrete Pipe
0.3 - 3.0
Riveted Steel Pipe
0.9 - 9.0
)]^0.33