Вы находитесь на странице: 1из 1

Federal Register / Vol. 72, No.

96 / Friday, May 18, 2007 / Notices 28083

4. How can the burden of the Assistance provided by the NRC NUCLEAR REGULATORY
information collection be minimized, (including Agreement States, COMMISSION
including the use of automated Educational Institutions and Other
collection techniques or other forms of Nonprofit Organizations). Advisory Committee on Reactor
information technology? Safeguards; Meeting Notice
5. The number of annual respondents:
A copy of the draft supporting
statement may be viewed free of charge 200. In accordance with the purposes of
at the NRC Public Document Room, One 6. The number of hours needed Sections 29 and 182b. of the Atomic
White Flint North, 11555 Rockville annually to complete the requirement or Energy Act (42 U.S.C. 2039, 2232b), the
Pike, Room O–1 F21, Rockville, MD request: 3,600 hours (3,000 hrs for Advisory Committee on Reactor
20852. OMB clearance requests are Safeguards (ACRS) will hold a meeting
reporting or 5 hours per response/ 3
available at the NRC worldwide Web on June 6–8, 2007, 11545 Rockville
responses per year and 600 hours for
site: http://www.nrc.gov/public-involve/ Pike, Rockville, Maryland. The date of
recordkeeping or 3 hours per
doc-comment/omb/index.html. The this meeting was previously published
recordkeeper). in the Federal Register on Wednesday,
document will be available on the NRC 7. Abstract: Recipients of NRC
home page site for 60 days after the November 15, 2006 (71 FR 66561).
financial assistance provide data to
signature date of this notice. Wednesday, June 6, 2007, Conference
Comments and questions about the demonstrate assurance to NRC that they
Room T–2B3, Two White Flint North,
information collection requirements are in compliance with non-
Rockville, Maryland
may be directed to the NRC Clearance discrimination regulations and policies.
8:30 a.m.–8:35 a.m.: Opening
Officer, Margaret A. Janney (T–5 F52), Submit, by July 17, 2007, comments
Remarks by the ACRS Chairman
U.S. Nuclear Regulatory Commission, that address the following questions:
(Open)—The ACRS Chairman will make
Washington, DC 20555–0001, by 1. Is the proposed collection of opening remarks regarding the conduct
telephone at 301–415–7245, or by information necessary for the NRC to of the meeting.
Internet electronic mail to properly perform its functions? Does the 8:35 a.m.–10 a.m.: Draft NUREG–
INFOCOLLECTS@NRC.GOV.
information have practical utility? 1852, ‘‘Demonstrating the Feasibility
Dated at Rockville, Maryland, this 7th day and Reliability of Operator Manual
of May 2007. 2. Is the burden estimate accurate?
Actions in Response to Fire’’ (Open)—
For the Nuclear Regulatory Commission. 3. Is there a way to enhance the The Committee will hear presentations
Margaret A. Janney,
quality, utility, and clarity of the by and hold discussions with
information to be collected? representatives of the NRC staff
NRC Clearance Officer, Office of Information
Services. 4. How can the burden of the regarding NUREG–1852 and related
[FR Doc. E7–9613 Filed 5–17–07; 8:45 am] information collection be minimized, matters.
BILLING CODE 7590–01–P including the use of automated 10:15 a.m.–12:15 a.m.: Maximum
collection techniques or other forms of Extended Load and Line Limit Analysis
information technology? Plus (MELLLA+) and Supporting
NUCLEAR REGULATORY Topical Reports (Open)—The
A copy of the draft supporting Committee will hear presentations by
COMMISSION statement may be viewed free of charge and hold discussions with
Agency Information Collection at the NRC Public Document Room, One representatives of the NRC staff and
Activities: Proposed Collection; White Flint North, 11555 Rockville General Electric Nuclear Energy (GENE)
Comment Request Pike, Room O–1 F21, Rockville, MD regarding GENE’s MELLLA+ and
20852. OMB clearance requests are supporting Topical Reports, and related
AGENCY: U.S. Nuclear Regulatory available at the NRC worldwide Web matters.
Commission (NRC). site: http://www.nrc.gov/public-involve/ 1:15 p.m.–3:15 p.m.: Overview of the
ACTION: Notice of pending NRC action to doc-comment/omb/index.html. The PHEBUS–FP Experimental Program and
submit an information collection document will be available on the NRC Results of Recent Tests (Open)—The
request to the Office of Management and home page site for 60 days after the Committee will hear presentations by
Budget (OMB) and solicitation of public signature date of this notice. and hold discussions with
comment. representatives of the NRC staff
Comments and questions about the
SUMMARY: The NRC is preparing a information collection requirements regarding the PHEBUS–FP experimental
submittal to OMB for review of may be directed to the NRC Clearance program and results of recent tests.
continued approval of information 3:30 p.m.–3:45 p.m.: Subcommittee
Officer, Margaret A. Janney (T–5 F52),
collections under the provisions of the Report (Open)—The Committee will
U.S. Nuclear Regulatory Commission,
Paperwork Reduction Act of 1995 (44 hear a report by the Chairman of the
Washington, DC 20555–0001, by ACRS Plant License Renewal
U.S.C. Chapter 35). telephone at 301–415–7245, or by
Information pertaining to the Subcommittee regarding interim review
Internet electronic mail to of the license renewal application for
requirement to be submitted: INFOCOLLECTS@NRC.GOV.
1. The title of the information the Vermont Yankee Nuclear Plant.
collection: 10 CFR Part 4, Dated at Rockville, Maryland, this 14th day 3:45 p.m.–4:45 p.m.: Status Report on
‘‘Nondiscrimination in Federally of May 2007. the Quality Assessment of Selected NRC
Assisted Commission Programs’’. For the Nuclear Regulatory Commission. Research Projects (Open)—The
2. Current OMB approval number: Committee will hold discussions with
pwalker on PROD1PC71 with NOTICES

Margaret A. Janney,
OMB No. 3150–0053. the members of the ACRS panels
3. How often the collection is NRC Clearance Officer, Office of Information regarding the status of their assessment
Services. of the quality of the NRC research
required: On occasion and annually.
4. Who is required or asked to report [FR Doc. E7–9646 Filed 5–17–07; 8:45 am] projects on: Fatigue Crack Flaw
Recipients of Federal Financial BILLING CODE 7590–01–P Tolerance in Nuclear Power Plant

VerDate Aug<31>2005 17:06 May 17, 2007 Jkt 211001 PO 00000 Frm 00065 Fmt 4703 Sfmt 4703 E:\FR\FM\18MYN1.SGM 18MYN1

Вам также может понравиться