SUB STATION BLDG 2

Footing
F1

No.

Excavation

conc.work

F2
Excavation
Conc. Work

5
5

Footing reinforcement
F1
10 tor 150 c/c
Bars parallel to length
1.3/0.15= 9+ 1 BAR= 10
Length=1.3-0.15-0.15= 1.0
Bars parallel to breadth
1.3/0.15= 9+ 1 BAR= 10
Length=1.3-0.15-0.15= 1.0
F2
12 tor 150 c/c
Bars parallel to length
1.5/0.15= 10 + 1 Bar = 11
Length= 1.5-0.15-0.15 = 1.2
Bars parallel to breadth
1.5/0.15= 10 + 1 Bar = 11
Length= 1.5-0.15-0.15 = 1.2

Surface dressing

Lean Conc
In footing
F1
F2
For plinth beam

No. of column in
footing

4
5

H
V

Column above plinth level


C1
of Height 4.0 m

Reinforcement detail
C1
of Height 4 m
Length of Lateral Ties
2*(0.41)+4*(0.26)
Spacing 12 Dia 75c/c
Height of column/75
4/0.075 = 53 Bar + 1= 54

HOOKS= 8*Dia
8*0.012

Total rmft in stirup of 12 Dia

54

Longitudinal bar length


4+.045+1.5+48*0.012(DIA)
4+.045+1.5+48*0.016(DIA)

4
4

Plinth beams
PB 1
Excavation
H PB 1
V PB 1

2
2

Conc. Work
HPB 1
V PB 1

2
2

Reinf. Of 16 Dia

PB 2
Excavation

HPB 2
VPB 2

1
1

Conc Work
HPB 2
VPB 2

1
1

Reinf. Of 12 Dia

Roof Beam
RB 1
HRB 1
Reinf. Of 12 Dia

2
6

RB 2
HRB 2
VRB 2
Reinf. Of 16 Dia

1
3
6

LB 1
HLB1
VLB1
Reinf. Of 12 Dia
9

3
3
6

Shuttering
Ar of roof
Column
C1
of Height 4 m
Plinth Beam
PB 1
HPB 1
VPB 2
PB 2
HPB 2
VPB 2

Column in footing
F1
F2

4
5

10

Wall

11

Plaster
of Height 4 m

Roof Slab
RS 1
RS 2

1
1

12

13

Reinf in roof slab


RS 1
Reinf. Of 8 Dia 150 c/c
Spacing of bars
Length /0.150 = 4.04/0.15
4.04/0.15= 27 Bar + 1 = 28
Breadth /0.15= 8.37/0.15
8.37/0.15= 56 Bar + 1 = 57

RS 2
Reinf. Of 10 Dia 150 c/c
Spacing of bars
Length /0.150 = 4.73/0.15
4.73/0.15= 32 Bar + 1 = 33
Breadth /0.15= 8.37/0.15
8.37/0.15= 56 Bar + 1 = 57

14

Flooring
sub station
Platform

15

window
Rolling shutter

16

Ramp conc work

28
57

33
57

Quantity

Unit

1.4

1.4

1.6

12.544

cum

1.3

1.3

1.5

10.14

1.6
1.5

1.6
1.5

1.6
1.5

20.48
16.875

Total Excavation
Total Conc. Work

33.024
27.015

cum
cum

No. of Bars

10

40

10

40

11

1.2

66

11

1.2

66

9.77
4.5

9.37
4.2
Total

91.5449
18.9
110.4449

sqm

0.15
0.15

1.014
1.6875

cum
cum

1.3
1.5

1.3
1.5

26.31
25.11

0.23
0.23

0.15
0.15

0.907695
0.866295

cum
cum

0.3

0.45

4.86

cum

1.956

950.616

6.121
6.313

220.356
227.268

m
m

1.86

0.096

11.94
11.14

0.23
0.23

0.6
0.6
Total
Excavation

1.64772
1.53732

0.6
0.6
Total Conc
work

2.42052
2.31012

17.54
16.74

0.23
0.23

3.18504

cum

4.73064

cum

205.68

5.77
5.37

0.23
0.23

0.45
0.45

0.597195
0.555795

cum
cum

8.77
8.37

0.23
0.23

0.45
0.45

0.907695
0.866295

cum
cum

102.84

1.81539

cum

105.24

0.907695
2.598885

cum
cum

203.28

2.723085
2.598885

cum
cum

308.52

73.0156

sqm

17.54

0.23

0.45

8.77
25.11

26.31
25.11

0.23
0.23

0.23
0.23

0.45
0.45

0.45
0.45

0.3

0.45

54

2*(lh+bh)

17.54
16.74

0.23
0.23

0.6
0.6

21.324
20.364

sqm
sqm

8.77
8.37

0.23
0.23

0.45
0.45
Total

8.1
7.74
57.528

sqm
sqm
sqm

1.3
1.5

42.65

1.3
1.5

0.23

42.65

4.04
4.73

8.37
8.37

1.5
1.5
Total

31.2
45
76.2

sqm

39.238

cum

341.2

sqm

0.13
0.15

4.395924
5.938515

cum
cum

8.37

234.36

4.04

230.28
929.28

8.37

276.21

4.73

269.61
1091.64

69.5156
3.5

sqm
sqm

8.54
3.5

8.14
1

7.8
3

1.2
2.4

9.36
7.2

sqm
sqm

3.5

2.2

0.6

2.31

cum

.1m added
extra

10
80
12
132

12
1687.572

16
636.228

2(lh+bh)

2 SIDES

8
929.28
10
1091.64

2* becoz of
bottom and top

PRICING OF SUB STATION BLDG 2 AT TUGHALAKABAD


S. No. Description of item
1
Surface dressing not exceeding 15 cm deep in soft/loose soil
2

Excavation in trenches n. exc. 1.5 m wide and n. exc. 1.5 m in depth for
foundation n.exc. 10 sqm on plan and n. exc. 1.5 m depth and getting out in
soft/loose soil.

Returning, filling, in including spreading, levelling, watering and well ramming in


layers not exc. 25 cm in soft/loose soil.

M/L Treating the bottom and sides of excavation at the rate of 5 litres per sqm of
surface area

Treating the back fill in contact with foundation at the rate of 7.5 litre of emulsion
per sqm of vertical surface

Treating the top surface of filled earth at the rate of 5 litres of emulsion per sqm of
surface.

7
8

Treating the soil along with external perimeter of building at the rate of 2.25 litre
of emulsion per meter of perimeter of wall.
Cement concrete in foundation filling and mass concrete type D2 1:4:8

TMT bars 10 mm dia and over cut to length bent to shape required including
cranking bending spirally for hooping for cloumns hooking ends and binding with
mild steel wire not less than 0.9-0 mm dia

10

Formwork to sides of concrete in foundation footings bases of columns and plinth


beams

11

Reinforced cement concrete (design mix) in foundation including footings


foundation beams plinth beams bases of columns etc in M25

12

Formwork to soffits of suspended slabs such as roof slabs floor slabs landings and
similar works

13

Reinforced cement concrete (design mix) in slabs simply supported on walls


beams and columns in floor roof landings and balconies etc in M25

14

Modular bricks in cement mortar 1:6 with fly ash bricks straight or curved on plan
not exc 6 m mean radius

15

Rendering 10mm thick in CM 1:4 second layer of 5 mm in CM 1:4 with water


proofing compund sand finished external plaster

16

Rendering 10mm thick in CM 1:6 finished even and smooth internal plaster

17

Rendering 5mm thick in CM 1:3 to RCC soffits bottom of beams lintal RCC chajjas
slabs etc

18

20-25 mm thick kota stone flooring 600x600 over 20 mm screed in CM1:6 over
100 mm thick PCC Type D2 over 150 mm thick hard core

19
20
21
22

7-8 mm thick non skid ceramic tiles 300x300 mm laid over cement screed in CM
1:4 over 100 mm thick PCC 1:2:4
Roof treatment
Dry distemper
Three coats of white wash on ceiling

23

Three coats of lime wash on internal walls

24

Supply and fix steel windows with side hung shutters including projecting type
hinges with steel handle and steel peg stays with glazing bars

25

shutter

shutter?
Qty
110.4449

Unit
Sqm

Rate
7.9

Amount
872.51471

SSR
3011

37.36203

Cum

115.2

4304.1059

3006

3.8424

Cum

41.7

160.22808

3009

226.248

Sqm

80.6

18235.589

3047

77.13

Sqm

126.8

9780.084

3048

73.0156

Sqm

80.6

5885.0574

3049

110.4449

Sqm

38.6

4263.1731

3051

4.47549

Cum

2303.3

10308.396

4025

3695.447

kg

48.6

179598.72

10034

187.728

Sqm

134.2

25193.098

7004

44.16357

Cum

3482.2

153786.38

4053

73.0156

Sqm

211.5

15442.799

7006

7.735377

Cum

3770

29162.371

4055

39.238

Cum

255.3

10017.461

5019

108.22

Sqm

134.8

14588.056
14001 & 14004

170.6

Sqm

77.3

13187.38

153.6

Sqm

76.3

11719.6814001 & 14004

Sqm

805.69

13013 & others

Sqm

520.4

13074

Sqm
Sqm
Sqm

300
31.1
11.8

0
0
0

Assessed
15010
15006

14001

Sqm

11.8

15006

9.36

Sqm

1689.4

15812.784

10071

7.2

Sqm
Total

0
522317.89

Add 3% for
unforeseen
items

15669.537

Grand total

537987.42

Plinth area of
building
Plinth area
rate per Sqm

Sqm
#DIV/0!

10

12

16

20

25

0.39

0.61

0.89

1.57

2.46

3.85

929.28

80

132

636.228

1091.69

1687.572

1171.69

1819.572

929.28

362.4192

636.228

714.7309 1619.4191 998.87796

3695.4471