Title page

Alcatel-Lucent 9130
BSC/MFS Evolution |
Installation Manual
3MN-00467-1011-RJZZA
Issue 1 | March 2012

Legal notice
Legal notice

Alcatel, Lucent, Alcatel-Lucent and the Alcatel-Lucent logo are trademarks of Alcatel-Lucent. All other trademarks are the property of their respective
owners.
The information presented is subject to change without notice. Alcatel-Lucent assumes no responsibility for inaccuracies contained herein.
Copyright 2012 Alcatel-Lucent. All rights reserved.
Note:

Not to be used or disclosed except in accordance with applicable agreements.

Contents
About this document
Purpose

............................................................................................................................................................................................. ix
ix

Reason for reissue

........................................................................................................................................................................ ix
ix

New in this release

....................................................................................................................................................................... ix
ix

Intended audience

......................................................................................................................................................................... ix
ix

How to use this document ........................................................................................................................................................... xx


Safety information

......................................................................................................................................................................... x
x

Prerequisites ..................................................................................................................................................................................... xx
Conventions used

........................................................................................................................................................................... x
x

Related information ....................................................................................................................................................................... xx


Document support .......................................................................................................................................................................... xx
Technical support .......................................................................................................................................................................... xi
xi
How to order ................................................................................................................................................................................... xi
xi
How to comment ........................................................................................................................................................................... xi
xi
1

Safety Information
Structure of safety statements ............................................................................................................................................... 1-1
1-1

Overview
Overview ...................................................................................................................................................................................... 2-1
2-1
Presentation ................................................................................................................................................................................. 2-1
2-1
Preparation

.................................................................................................................................................................................. 2-6
2-6

Scheduling ................................................................................................................................................................................... 2-7


2-7
Resources ..................................................................................................................................................................................... 2-8
2-8

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
iii
3MN-00467-1011-RJZZA
Issue 1 March 2012

Contents
....................................................................................................................................................................................................................................

Scenario
Overview ...................................................................................................................................................................................... 3-1
3-1
Before Going Onsite
Overview ...................................................................................................................................................................................... 3-3
3-3
Before You Start
Before You Start ........................................................................................................................................................................ 3-4
3-4
Install Rack
Prepare Floor

.............................................................................................................................................................................. 3-5
3-5

Rack Delivery and Positioning

............................................................................................................................................ 3-7
3-7

Prepare Site Cable Way ........................................................................................................................................................ 3-11


3-11
Fix Rack ..................................................................................................................................................................................... 3-13
3-13
Install Protective Earth and Power Supply Cables
How to Install Protective Earth and Power Supply Cables ..................................................................................... 3-22
3-22
Install Cables in Site Cable Way ....................................................................................................................................... 3-23
3-23
C1: Rack Top Entry of Cables ........................................................................................................................................... 3-25
3-25
C2: Rack Bottom Entry of Cables .................................................................................................................................... 3-28
3-28
Connect Earth Cable (GND)

.............................................................................................................................................. 3-31
3-31

Connect DC 48 Volts Power Cables ................................................................................................................................ 3-34


3-34
Test Power Supply

................................................................................................................................................................. 3-38
3-38

Install PCM Cables


Run 120 Ohm PCM Cables

................................................................................................................................................ 3-41
3-41

Run 75 Ohm PCM Cables ................................................................................................................................................... 3-47


3-47
Install Cables in Cable Way ................................................................................................................................................ 3-56
3-56
O2: Install Second Equipment in Rack
Install PCM Cables ................................................................................................................................................................ 3-58
3-58
Install Second ATCA Shelf

................................................................................................................................................. 3-59
3-59

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
iv
3MN-00467-1011-RJZZA
Issue 1 March 2012

Contents
....................................................................................................................................................................................................................................

Install Second LIU Shelf

..................................................................................................................................................... 3-67
3-67

Install Internal Ethernet Cables ......................................................................................................................................... 3-70


3-70
O3, O4, O5, O6, O7: Install Ethernet Cables
O3: Install OMC-R Router Cables ................................................................................................................................... 3-71
3-71
O4: Install A-GPS Server Cable

....................................................................................................................................... 3-72
3-72

O5: Install External Alarm Box ......................................................................................................................................... 3-73


3-73
O6: Install SGSN Router Cables

...................................................................................................................................... 3-74
3-74

O7: Install Ethernet Cables for IP Telecom Traffic in Release B11 ..................................................................... 3-75
3-75
O8: Install Optical Cables for STM1 in Release B11
How to Install Optical Cables for STM1 in Release B11 ........................................................................................ 3-76
3-76
Install Optical Cables in Cable Way ................................................................................................................................ 3-77
3-77
Install SFP Modules

.............................................................................................................................................................. 3-79
3-79

Route Optical Cables

............................................................................................................................................................ 3-81
3-81

Finish Installation
How to Finish Installation ................................................................................................................................................... 3-85
3-85

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
v
3MN-00467-1011-RJZZA
Issue 1 March 2012

Contents
....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
vi
3MN-00467-1011-RJZZA
Issue 1 March 2012

List of figures
2-1

9130 MFS/BSC Evolution Rack (Front View)

............................................................................................... 2-2

2-2

9130 MFS/BSC Evolution Configurations

3-1

Fixing Items to be Removed on Shelf Back Side ........................................................................................ 3-10

3-2

Level Rack then Fix Rack to Concrete Floor ................................................................................................ 3-14

3-3

Raised Floor Fixing Example

3-4

Mechanical Assembling of Frame

3-5

Fixing Raised Floor at Same Level of Earthquake Frame) ...................................................................... 3-20

3-6

Top Cable Entry

3-7

Power Cables Outlet General View

3-8

Bottom Cable Entry ................................................................................................................................................ 3-29


3-29

3-9

Metallic Braid Fixed to Raised Floor Cable Way ........................................................................................ 3-30

3-10

Power Cables Connection

3-11

Site Fuse Breaker Example

3-12

Label Power Cables ................................................................................................................................................ 3-37


3-37

3-13

Bind Cables

3-14

Cable Routing Front View

3-15

Top Rack Cable Entry General View

3-16

Cable Routing Front View

3-17

Cable Routing Side View

3-18

Bottom Cable Entry ................................................................................................................................................ 3-52


3-52

3-19

Cable Routing Front View

3-20

Cable Routing Side View

3-21

Wrong Handling of ATCA Shelf ........................................................................................................................ 3-60

...................................................................................................... 2-3

............................................................................................................................. 3-16
.................................................................................................................... 3-18

....................................................................................................................................................... 3-26
3-26
.................................................................................................................. 3-27

.................................................................................................................................... 3-35
................................................................................................................................. 3-36

............................................................................................................................................................... 3-41
3-41
................................................................................................................................... 3-42
............................................................................................................... 3-43

................................................................................................................................... 3-45

..................................................................................................................................... 3-46

................................................................................................................................... 3-54

..................................................................................................................................... 3-55

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
vii
3MN-00467-1011-RJZZA
Issue 1 March 2012

List of figures
....................................................................................................................................................................................................................................

3-22

Ground Cable and ESD Jack Connection

...................................................................................................... 3-61

3-23

Rear View of ATCA Shelf Variant Before 3BK 27291 ABxx ................................................................. 3-62

3-24

Ground Cable and ESD Jack Connection

3-25

Rear View of ATCA Shelf from Shelf Variant 3BK 27291 ABxx On

3-26

Brackets at Shelf Rear

3-27

Brackets at Shelf Front .......................................................................................................................................... 3-68


3-68

3-28

Install Optical Cable in cable tray ..................................................................................................................... 3-77

3-29

Cables Rack Top Entry .......................................................................................................................................... 3-81

3-30

Cables Routing Bottom Entry - Rear View

3-31

Optical Cable Connection on JBXTP3 Board

3-32

Fit Rack Bottom Cover Plate

3-33

Close Doors

...................................................................................................... 3-64
................................................. 3-65

........................................................................................................................................... 3-67
3-67

................................................................................................... 3-83
.............................................................................................. 3-84

.............................................................................................................................. 3-85

............................................................................................................................................................... 3-86
3-86

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
viii
3MN-00467-1011-RJZZA
Issue 1 March 2012

About this document


About this document

Purpose

This document describes how to install onsite an Alcatel-Lucent BSS 9130 MFS/BSC
Evolution and how to install a second equipment in an 9130 MFS/BSC Evolution rack.
Reason for reissue
Issue number

Reason for reissue

Edition 01

First official release of the document.

New in this release

This section contains information about changes to the current document.


New features

None.
Other changes

None.
Intended audience

This document is intended for:

Installers
Site administrators
Supervisors
Project managers

Field service technicians


Occasional users.

...................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
ix
3MN-00467-1011-RJZZA
Issue 1 March 2012

About this document


....................................................................................................................................................................................................................................

How to use this document

No specific recommendation applies regarding the way readers should read this
document.
Safety information

For your safety, this document contains safety statements. Safety statements are given at
points where risks of damage to personnel, equipment, and operation may exist. Failure to
follow the directions in a safety statement may result in serious consequences.
Prerequisites

You must have a basic understanding of the following:

Alcatel-Lucent BSS equipment


Experience of electrical mounting and cabling.

Conventions used

This section gives information on conventions.


Vocabulary conventions

None.
Typographical conventions

The following typographical conventions are used in this document:


Appearance

Description

Italicized text

Emphasized information.

graphical user interface text

Text that is displayed in a graphical user interface or in a


hardware label.

Document reference, reference


number

Related document that is referenced in the document.

Related information

None.
Document support

For support in using this or any other Alcatel-Lucent document, contact Alcatel-Lucent at
one of the following telephone numbers:

1-888-582-3688 (for the United States)


1-317-377-8618 (for all other countries)

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
x
3MN-00467-1011-RJZZA
Issue 1 March 2012

About this document


....................................................................................................................................................................................................................................

Technical support

For technical support, contact your local Alcatel-Lucent customer support team. See the
Alcatel-Lucent Support web site (http://www.alcatel-lucent.com/support/) for contact
information.
How to order

To order Alcatel-Lucent documents, contact your local sales representative or use Online
Customer Support (OLCS) (http://support.alcatel-lucent.com)
How to comment

To comment on this document, go to the Online Comment Form (http://infodoc.alcatellucent.com/comments/) or e-mail your comments to the Comments Hotline
(comments@alcatel-lucent.com).

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
xi
3MN-00467-1011-RJZZA
Issue 1 March 2012

About this document


....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
xii
3MN-00467-1011-RJZZA
Issue 1 March 2012

Safety Information
1

Structure of safety statements


Overview

This topic describes the components of safety statements that appear in this document.
General structure

Safety statements include the following structural elements:

E
L
P
M

CAUTION

Lifting hazard

SA

Lifting this equipment by yourself can result in injury


due to the size and weight of the equipment.

Always use three people or a lifting device to transport


and position this equipment.
[ABC123]

F
G
H

Item

Structure element

Purpose

Safety alert symbol

Indicates the potential for personal injury


(optional)

Safety symbol

Indicates hazard type (optional)

Signal word

Indicates the severity of the hazard

Hazard type

Describes the source of the risk of damage or


injury

Safety message

Consequences if protective measures fail

Avoidance message

Protective measures to take to avoid the hazard

...................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
1-1
3MN-00467-1011-RJZZA
Issue 1 March 2012

Safety Information

Structure of safety statements

....................................................................................................................................................................................................................................

Item

Structure element

Purpose

Identifier

The reference ID of the safety statement


(optional)

Signal words

The signal words identify the hazard severity levels as follows:


Signal word

Meaning

DANGER

Indicates an extremely hazardous situation which, if not avoided, will


result in death or serious injury.

WARNING

Indicates a hazardous situation which, if not avoided, could result in


death or serious injury.

CAUTION

Indicates a hazardous situation which, if not avoided, could result in


minor or moderate injury.

NOTICE

Indicates a hazardous situation not related to personal injury.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
1-2
3MN-00467-1011-RJZZA
Issue 1 March 2012

Overview
2

Overview
Purpose

This Overview gives information needed by project managers and foremen, for
presentation to the customer and for site planning.
Contents
Presentation

2-1

Preparation

2-6

Scheduling

2-7

Resources

2-8

Presentation
Hardware Description

The following sections describe the hardware.


Rack Layout and Configurations

The following figure shows the front view of the 9130 MFS/BSC Evolution rack.

...................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
2-1
3MN-00467-1011-RJZZA
Issue 1 March 2012

Overview

Presentation

....................................................................................................................................................................................................................................

Figure 2-1 9130 MFS/BSC Evolution Rack (Front View)

The following figure shows all 9130 MFS/BSC Evolution possible configurations.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
2-2
3MN-00467-1011-RJZZA
Issue 1 March 2012

Overview

Presentation

....................................................................................................................................................................................................................................

Figure 2-2 9130 MFS/BSC Evolution Configurations

Regardless of the configuration, the installation principle is the same.


Weight and Dimensions

The following table gives the dimensions and weight of the cabinet.
Description

Dimensions

Width

600 mm

Depth

600 mm
1

Height (including a 100 mm plinth) *

2000 mm

Weight

300 kg (maximum configuration)

Notes:

1.

* Earthquake option is not included in total height

Cases

The following cases apply:

C1: Concrete floor installation


C2: Raised floor installation.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
2-3
3MN-00467-1011-RJZZA
Issue 1 March 2012

Overview

Presentation

....................................................................................................................................................................................................................................

Options

The following options apply:

O1: Earthquake fixing.


O2: Install the second equipment in a rack
O3: Ethernet cables installation towards the OMC-R
O4: A-GPS server cable installation
O5: External Alarm box installation.

O6: Ethernet cables installation towards SGSN


O7: Ethernet cables installation for IP telecom traffic, applies for Release B11
O8: Optical cables installation for STM1, applies for Release B11.

Initial State

Before the installation, the rack and installation kits are packed and delivered onsite.
Final State

After finishing the installation:

The rack is ready for commissioning


The rack is not powered up.

Restrictions

None.
Grouped Task Sequence

The following figure shows the task sequence for dismantling onsite an Alcatel-Lucent
BSS 9130 MFS/BSC Evolution.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
2-4
3MN-00467-1011-RJZZA
Issue 1 March 2012

Overview

Presentation

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
2-5
3MN-00467-1011-RJZZA
Issue 1 March 2012

Overview

Preparation

....................................................................................................................................................................................................................................

Preparation
Prerequisites

The following prerequisites apply:

The site must comply with the safety rules given in the General Wiring Handbook

The site is ready to receive the racks, according to the SPP 59 - Specification for 9130
BSC/MFS Evolution Site Preparation.

Site Specific Information

You must have the following specific information to complete the scenario.
Site:

Grounding plate location


Power supply cabinet location
Fuse breaker locations in the power box

2 wire or 3 wire power system (if applicable)


Precise rack location
PCM terminal block location
Usage of External Alarm Block

Number of STM1 cables to be installed


Number of alarms to be connected.

Rack:

Door opening direction (left or right)

Rack fixing (wall, raised floor, steel construction, concrete foundation).

Kits:
PCM cables impedance (120-ohm, 75-ohm).

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
2-6
3MN-00467-1011-RJZZA
Issue 1 March 2012

Overview

Scheduling

....................................................................................................................................................................................................................................

Scheduling
Time based on technical constraints

The number of resources shown in the table below does not take into account individual
customer or safety requirements.
Task

Time / Task
1st person

Time / Task
2nd person

Before Going Onsite (p. 3-3)

15 min.

15 min.

Before You Start (p. 3-4)

15 min.

15 min.

Install Rack (p. 3-5) 1*

15 min.

Prepare Floor (p. 3-5)

15 min.

15 min.

Rack Delivery and Positioning (p. 3-7)

15 min.

15 min.

Prepare Site Cable Way (p. 3-11)

15 min.

15 min.

Fix Rack (p. 3-13)

15 min.

15 min.

Install Cables in Site Cable Way (p. 3-23)

10 min.

C1: Rack Top Entry of Cables (p. 3-25)

10 min.

C2: Rack Bottom Entry of Cables (p. 3-28)

10 min.

10 min.

Connect Earth Cable (GND) (p. 3-31)

10 min.

Connect DC 48 Volts Power Cables (p. 3-34)

10 min.

Test Power Supply (p. 3-38)

10 min.

10 min.

Install Cables in Cable Way (p. 3-56)

10 min.

10 min.

Run 120 Ohm PCM Cables (p. 3-41)

20 min.

20 min.

How to Finish Installation (p. 3-85)

15 min.

15 min.

Total Time

2h 55 min.

2h 55 min.

How to Install Protective Earth and Power Supply


Cables (p. 3-22)

Install PCM Cables (p. 3-41)

Notes:

1.

* Transportation time to final location depending of the site

The following table gives the duration for the optional tasks.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
2-7
3MN-00467-1011-RJZZA
Issue 1 March 2012

Overview

Scheduling

....................................................................................................................................................................................................................................

Task

Time / Task
1st person

Time / Task
2nd person

Install PCM Cables (p. 3-58)

30 min.

30 min.

Install Second ATCA Shelf (p. 3-59)

30 min.

30 min.

Install Second LIU Shelf (p. 3-67)

10 min.

10 min.

O3: Install OMC-R Router Cables (p. 3-71)

10 min.

O4: Install A-GPS Server Cable (p. 3-72)

10 min.

O5: Install External Alarm Box (p. 3-73)

10 min.

O6: Install SGSN Router Cables (p. 3-74)

10 min.

O8: Install Optical Cables for STM1 in Release B11


(p. 3-76)

15 min.

15 min.

O2: Install Second Equipment in Rack (p. 3-58)

O3, O4, O5, O6, O7: Install Ethernet Cables


(p. 3-71)

Resources
Tools

The following tables describe the necessary hardware tools, software tools, and forms.
Installation Kits

Use the following table to check, onsite, the mandatory or optional delivery item kits.
The following symbols apply:

mandatory kit
technical choice kit
customer option kit.

Mandatory kits

Mnemonic

Reference

Quantity

Cabinet equipped

JRXMX

3BK 27154 AA

Basic installation kit

JDMX

3BK 27244 AB

PCM cables 120 Ohm:

120 ohm - 8 LIU (20 m)

PVCABE10

1AB 060540027

120 ohm - 8 LIU (30 m)

PVCABE11

1AB 060540023

120 ohm - 8 LIU (40 m)

PVCABE13

1AB 060540026

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
2-8
3MN-00467-1011-RJZZA
Issue 1 March 2012

Overview

Resources

....................................................................................................................................................................................................................................

Reference

Quantity

JLIU75E1

3BK 15053 AAAF

75 ohm - 8 LIU (30 m)

JLIU75E1

3BK 15054 AAAF

75 ohm - 8 LIU (40 m)

JLIU75E1

3BK 15055 AAAF

Jumpers for DDF:

120 ohm L904 (roll 100 m)

CA120S

3BK 08941 AA

GND cable Yellow/Green 1 x 35 mm2 (roll


100 m)

PC35YG1D

3BK 08960 BA

DC 48 Volts power cables


-48V blue 1 x 16 mm2 (roll 100 m)

PC16BL1D

3BK 08955 BB

0V black 1 x 16 mm2 (roll 100 m)

PC16B1D

3BK 08956 BA

-48V blue 1 x 25 mm2 (roll 100 m)

PV25BL1D

3BK 08963 BA

0V black 1 x 25 mm (roll 100 m)

PV25B1D

3BK 08963 BB

Ethernet cable straight (roll 30 m)

ALETHD

3BW 01804 JA

Ethernet cable crossed (roll 30 m)

ALETHC

3BW 01805 JA

Wall support for 4 x MP24

DDF

1AD 02846 0001

Terminal block 64E1 120

TERBLO1

1AB 23960 0001

Terminal block 32 E1 75 BNC

TERBLO2

1AB 27681 0002

BNC connector M

BNCCON1

1AB 00642 0011

128

Terminal block 32 E1 75 1656

TERBLO3

1AB 27681 0001

1656 connector M FLEX

BNCCON2

1AB 02546 0013

128

LABO rack 43U

LABRAC1

1AD 03905 0001

Vertical cable way

JDTCO

3BK 25297 AA

External alarm box

EABMX

1AB 24048 0001

Raised floor fixing

JDTCFF

3BK 25341 AA

Earthquake kit for raised floor fixing

JDSISM

3BK 25284 AA

STM1 cabling kit

Mandatory kits

Mnemonic

PCM cables 75 Ohm

75 ohm - 8 LIU (20 m)

For distance 0m < L < 20m:

For distance 20m < L < 40m:


2

SFP modules

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
2-9
3MN-00467-1011-RJZZA
Issue 1 March 2012

Overview

Resources

....................................................................................................................................................................................................................................

Mandatory kits

Mnemonic

Reference

Quantity

Optical Fibre Cable

JLOPT6

Depending of length:

Basic installation kit for Optical Fibre


cable

OFC3SEC

3BK28064 GLAA
for L=15m

3BK 28064 HAAA


for L=20m

3BK 28064 HLAA


for L=25m

3BK 28064 JAAA lor


L=30m

3BK 28064 JFAA for


L=35m

3BK 28064 JLAA for


L=40m

3BK27700ABAA

Hardware Tools

Refer to the Tools Catalogue for Field Activity for more information.
Kit name

Reference

Calibration

Basic kit tools

OUT 001

no

Forms

You must have the following forms:

SPP 10 - Site Condition Inspection Specification (All SPG/SPP)


(8BL 00704 0016 DRBRA)
Site Premises Inspection Form (CEL)
8BL 00704 0015 DRBRA

Supplies

The installer must supply these kits (not included in Alcatel-Lucent kits).
Item

Quantity

Set of rubber sleeves for all cables

Wire terminal 8 mm for 16 mm cable (lug)


Wire terminal 6 mm for 16 mm cable (lug)

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
2-10
3MN-00467-1011-RJZZA
Issue 1 March 2012

Overview

Resources

....................................................................................................................................................................................................................................

Applicable Documents

You must have the following documents or have electronic access to the following
documents:

Catalogue of Instruction Operation (IO)

Catalogue of Technical and Logistic Information (ITLPRO)

General Wiring Handbook

Tools Catalogue for Field Activity

CI-08 Site Equipment Inventory

Dismantling Manual Generic CCL

BSS Methods Handbook

Install and Commission External Alarm Box

Completion Check List (CCL)

SPP 59 - Specification for 9130 BSC/MFS Evolution Site Preparation

Install 9130 - BSC / MFS Evolution Digital Distribution Frame

JLIU75E1 Wiring List, (3EJ 02719 AAAA JLZZA)


JLIU75E1 Assembly Drawing, (3EJ 02719 AAAA HDZZA)

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
2-11
3MN-00467-1011-RJZZA
Issue 1 March 2012

Overview

Resources

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
2-12
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
3

Overview
Purpose

This Scenario presents all checks needed before beginning the scenario, and all detailed
tasks to be performed onsite.
Contents
Before Going Onsite

3-3

Overview

3-3

Before You Start

3-4

Before You Start

3-4

Install Rack

3-5

Prepare Floor

3-5

Rack Delivery and Positioning

3-7

Prepare Site Cable Way

3-11

Fix Rack

3-13

Install Protective Earth and Power Supply Cables

3-22

How to Install Protective Earth and Power Supply Cables

3-22

Install Cables in Site Cable Way

3-23

C1: Rack Top Entry of Cables

3-25

C2: Rack Bottom Entry of Cables

3-28

Connect Earth Cable (GND)

3-31

Connect DC 48 Volts Power Cables

3-34

Test Power Supply

3-38

Install PCM Cables

3-41

...................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-1
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario

Overview

....................................................................................................................................................................................................................................

Run 120 Ohm PCM Cables

3-41

Run 75 Ohm PCM Cables

3-47

Install Cables in Cable Way

3-56

O2: Install Second Equipment in Rack

3-58

Install PCM Cables

3-58

Install Second ATCA Shelf

3-59

Install Second LIU Shelf

3-67

Install Internal Ethernet Cables

3-70

O3, O4, O5, O6, O7: Install Ethernet Cables

3-71

O3: Install OMC-R Router Cables

3-71

O4: Install A-GPS Server Cable

3-72

O5: Install External Alarm Box

3-73

O6: Install SGSN Router Cables

3-74

O7: Install Ethernet Cables for IP Telecom Traffic in Release B11

3-75

O8: Install Optical Cables for STM1 in Release B11

3-76

How to Install Optical Cables for STM1 in Release B11

3-76

Install Optical Cables in Cable Way

3-77

Install SFP Modules

3-79

Route Optical Cables

3-81

Finish Installation

3-85

How to Finish Installation

3-85

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-2
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Before Going Onsite

Overview

....................................................................................................................................................................................................................................

Before Going Onsite


Overview
Overview

Before going onsite, check that the following information and supplies are available:

All Prerequisites (p. 2-6) are met

The customer has been informed of the following information:


You must indicate:
Date and time
Site name and address

Purpose of the operation.


Personnel are available; refer to Scheduling (p. 2-7)

Site Specific Information (p. 2-6) is available

Installation Kits (p. 2-8) are available and ready for operation

Supplies (p. 2-10) are available and ready for operation

Applicable Documents (p. 2-11) are available.

Tools (p. 2-8) are available and ready for operation

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-3
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Before You Start

Before You Start

....................................................................................................................................................................................................................................

Before You Start


Before You Start
Checks

Perform the following operations:

Check that all Prerequisites (p. 2-6) are met

Check applicable notifications and operating instructions (refer to the Catalogue of


Instruction Operation (IO) and Catalogue of Technical and Logistic Information
(ITLPRO))
Check the availability of all necessary Tools (p. 2-8), Installation Kits (p. 2-8) and
Supplies (p. 2-10)

Refer to the SPP 10 - Site Condition Inspection Specification (All SPG/SPP) and
complete the Site Premises Inspection Form (CEL)
Check that the safety precautions are taken in accordance with the safety instructions
described in the B11 BSS Methods Handbook
Complete the header field of the CCL. Complete the CCL as each instruction is
carried out.
Attention: Among the Cases (p. 2-3) and the Options (p. 2-4), identify which
cases and options apply to you.

Required Knowledge

You must be familiar with the following:

Safety Rules and Precautions

How to document Faults and Anomalies.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-4
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Rack

Prepare Floor

....................................................................................................................................................................................................................................

Install Rack
Prepare Floor
Overview

Note: To be compliant with EN 60950 rules, it is mandatory that the rack be fixed to
the floor (refer to SPP 59 - Specification for 9130 BSC/MFS Evolution Site
Preparation).
There are two installation cases:

Fixing to a concrete floor


Fixing to a raised floor.

C1: Concrete Floor Drilling

The following figure shows concrete floor drilling.


Drill the concrete floor:
...................................................................................................................................................................................................

Using the supplied template, mark the concrete foundation.


...................................................................................................................................................................................................

Drill holes in the concrete foundation ( 12 mm, h = 70 mm).


E...................................................................................................................................................................................................
N D O F S T E P S

C2: Raised Floor Drilling

The following figure shows raised floor drilling.


Drill the raised floor:
...................................................................................................................................................................................................

Using a template, cut a rectangular hole in the tile to pass the cables.
...................................................................................................................................................................................................

Using a template, drill the following holes.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-5
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Rack

Prepare Floor

....................................................................................................................................................................................................................................

You must:

Drill the tile 12 mm

Drill the floor 12 mm, h = 60 mm +/-3 mm.

E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-6
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Rack

Rack Delivery and Positioning

....................................................................................................................................................................................................................................

Rack Delivery and Positioning


Overview

The following figure shows the rack delivery and positioning.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-7
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Rack

Rack Delivery and Positioning

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-8
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Rack

Rack Delivery and Positioning

....................................................................................................................................................................................................................................

Procedure

Position the rack:


...................................................................................................................................................................................................

Place the rack in position.


You must:

Lift the rack by crane with packaging or,


Lift the rack by crane using eyebolts of rack or,
Transport the rack by pallet near to its final position.

...................................................................................................................................................................................................

Unpack the rack.


...................................................................................................................................................................................................

Remove the bottom cover plate of rack.


...................................................................................................................................................................................................

At top of the rack, remove the craning eyebolts.


...................................................................................................................................................................................................

A box with four Ethernet cables is delivered inside the rack. Leave the cables in the rack.
The cables are connected during commissioning.
...................................................................................................................................................................................................

On the back side of the ATCA shelf, remove metallic parts used during transportation. If
two shelves are equipped, remove the metallic parts on both shelves.
Note: If the metallic parts used for transportation are removed during the installation,
keep the parts safely onsite to be reused for transportation in the case of dismantling.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-9
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Rack

Rack Delivery and Positioning

....................................................................................................................................................................................................................................

Figure 3-1 Fixing Items to be Removed on Shelf Back Side

...................................................................................................................................................................................................

Slightly unfasten the screws fixing the JSXPDU (one or two turns).
...................................................................................................................................................................................................

Shift the JSXPDU to the top of the rack as much as possible.


...................................................................................................................................................................................................

Fasten the screws to fix the JSXPDU.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-10
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Rack

Prepare Site Cable Way

....................................................................................................................................................................................................................................

Prepare Site Cable Way


C1: Top Rack Entry of Cables
Nr

Materials

Reference

Kit

Vertical cable way kit

3BK 25297 AAAA

JDTCO

Edge protection

1AD 01782 0001

JDMX

The following figure shows the cable way.

Procedure

Prepare the cable way:


...................................................................................................................................................................................................

Cut a hole in the site cable way for each used cable entry.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-11
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Rack

Prepare Site Cable Way

....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

Cover the cut-out with edge protection (1AD 01782 0001).


...................................................................................................................................................................................................

Fix the support to the rack.


...................................................................................................................................................................................................

Fix the separating corner to the vertical cable way.


...................................................................................................................................................................................................

Fix the vertical cable way to the support at top of rack.


...................................................................................................................................................................................................

Fix the vertical cable way to the site cable way.


...................................................................................................................................................................................................

Follow the same procedure to install the second vertical cable way.
E...................................................................................................................................................................................................
N D O F S T E P S

C2: Bottom Rack Entry of Cables

No specific preparation of cable way. Use the same rules for cable separating.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-12
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Rack

Fix Rack

....................................................................................................................................................................................................................................

Fix Rack
C1: Concrete Floor Fixing
Nr

Materials

Reference

Kit

Expanding plug for hole 12 mm

1AD 01166 0001

3BK 27244 ABAA

Screws HM 8 x 65 mm

1AD 00215 0042

(JDMX)

Washer 8 mm

1AD 00087 0149

The following figure shows how to level the rack then fix the rack to the concrete floor.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-13
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Rack

Fix Rack

....................................................................................................................................................................................................................................

Figure 3-2 Level Rack then Fix Rack to Concrete Floor

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-14
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Rack

Fix Rack

....................................................................................................................................................................................................................................

Procedure

Fix the rack to the concrete floor:


...................................................................................................................................................................................................

Put the expanding plug in the concrete floor.


...................................................................................................................................................................................................

Place the rack to its final position.


...................................................................................................................................................................................................

Level the rack.


...................................................................................................................................................................................................

Screw the screw with the washer to fix the rack.


E...................................................................................................................................................................................................
N D O F S T E P S

C2: Raised Floor Fixing


Nr

Materials

Reference

Kit

Screw 8 mm x 80 mm

1AD 00215 0092

3BK 25341 AA

Washer 8 mm

1AD 00087 0149

(JDTCFF)

Frame of rack

Raised floor support

3BK 08094 AA

3BK 27244 AB

Coupling nut 8 mm

1AD 01655 0001

(JDMX)

Threaded rod 8 mm

1AD 01660 0003

Hexagon nut 8 mm

1AD 00197 0006

Washer 8 mm

1AD 00087 0149

Wall plug 8 mm for hole 12 mm

1AD 01666 0001

The following figure shows a raised floor fixing.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-15
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Rack

Fix Rack

....................................................................................................................................................................................................................................

Figure 3-3 Raised Floor Fixing Example

Note: In this case, do not level the rack.


Fix the rack to the raised floor:
...................................................................................................................................................................................................

Place the rack to its final position.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-16
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Rack

Fix Rack

....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

Put the expanding plug (9) in the concrete floor (see Figure 3-3, Raised Floor Fixing
Example (p. 3-16)).
...................................................................................................................................................................................................

Screw the threaded rod (6), then the washer (8) and nut (7).
...................................................................................................................................................................................................

Screw the coupling nut (5) as shown in Figure 3-3, Raised Floor Fixing Example
(p. 3-16).
...................................................................................................................................................................................................

Screw the screw (1) with the washer (2).


E...................................................................................................................................................................................................
N D O F S T E P S

O1: Earthquake Fixing

Attention: This option can be installed only with a raised floor exactly 34 cm high
from the concrete ground.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-17
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Rack

Fix Rack

....................................................................................................................................................................................................................................

Figure 3-4 Mechanical Assembling of Frame

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-18
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Rack

Fix Rack

....................................................................................................................................................................................................................................

Nr

Materials

Reference

Kit

Pedestal

3BK 25339 AAAA

3BK 25284 AAAA

Bracket

3BK 25340 AAAA

(JDSISM)

Screw 16 x 40

1AD 00204 0059

Washer M16

1AD 00254 0006

Screw 8 x 35

1AD 00254 0038

Washer M8

1AD 00254 0003

Nut H8

1AD 00197 0006

Expanding wall plug

1AD 02655 0001

Washer M10

1AD 00453 0005

10

Screw 10 x 65

1AD 00050 0010

The following figure shows how to fix an earthquake frame.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-19
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Rack

Fix Rack

....................................................................................................................................................................................................................................

Figure 3-5 Fixing Raised Floor at Same Level of Earthquake Frame)

Fix the earthquake frame:


...................................................................................................................................................................................................

Assemble the earthquake frame using screw (3) and washer (4) (see Figure 3-4,
Mechanical Assembling of Frame (p. 3-18)).

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-20
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Rack

Fix Rack

....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

Using the earthquake frame, mark the concrete ground.


...................................................................................................................................................................................................

Drill the ground and fit the wall plug (8) (see Figure 3-5, Fixing Raised Floor at Same
Level of Earthquake Frame) (p. 3-20)).
...................................................................................................................................................................................................

Fix the earthquake frame using the washer (9) and screw (10).
...................................................................................................................................................................................................

Fix the rack to the frame using (5) (6) (7).


...................................................................................................................................................................................................

Cut and fit the tiles around the earthquake frame.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-21
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Protective Earth and Power Supply Cables

How to Install Protective Earth and Power Supply Cables

....................................................................................................................................................................................................................................

Install Protective Earth and Power Supply Cables


How to Install Protective Earth and Power Supply Cables
Overview

DANGER
Electric-shock hazard
Risk of electrocution to personnel and damage to equipment.
Before making any electrical connections to the rack, ensure that the safety instructions
are followed.
It is essential that:

The electrical power supply is disconnected. Ensure all breakers or fuses devoted to
the new rack into the site connection box are switched OFF
The protective EARTH (GND) must be connected to the equipment before DC power
cable connection. It must be firstly connected at site side and secondly at rack side.

Ensure that the safety rules are applied.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-22
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Protective Earth and Power Supply Cables

Install Cables in Site Cable Way

....................................................................................................................................................................................................................................

Install Cables in Site Cable Way


Overview

The following figure shows how to install the cables in the site cable way.

Procedure

Install the cables in the cable way:


...................................................................................................................................................................................................

Install a yellow/green cable in the power compartment of the cable way.


...................................................................................................................................................................................................

Install DC 48V power cables in the power compartment of the cable way (BATA, BATB
and BATR cables).
...................................................................................................................................................................................................

Attach the cables with plastic tie wraps.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-23
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Protective Earth and Power Supply Cables

Install Cables in Site Cable Way

....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

Cut the cables to the required length.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-24
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Protective Earth and Power Supply Cables

C1: Rack Top Entry of Cables

....................................................................................................................................................................................................................................

C1: Rack Top Entry of Cables


Procedure

Run the cables:


...................................................................................................................................................................................................

Remove the top cover plate.


...................................................................................................................................................................................................

Cover the cable entry window with edge protection.


...................................................................................................................................................................................................

Fit the corner profile to the left or to the right of the cabinet according to the site
configuration.
...................................................................................................................................................................................................

Fix the 200 mm braid to the cable way (mechanical ground) (see Figure 3-7, Power
Cables Outlet General View (p. 3-27)).
...................................................................................................................................................................................................

Fix the earth braid to the specific stud of the rack.


E...................................................................................................................................................................................................
N D O F S T E P S

Additional information

The following figure shows the top cable entry.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-25
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Protective Earth and Power Supply Cables

C1: Rack Top Entry of Cables

....................................................................................................................................................................................................................................

Figure 3-6 Top Cable Entry

The following figure shows a general view of the power cable outlet.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-26
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Protective Earth and Power Supply Cables

C1: Rack Top Entry of Cables

....................................................................................................................................................................................................................................

Figure 3-7 Power Cables Outlet General View

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-27
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Protective Earth and Power Supply Cables

C2: Rack Bottom Entry of Cables

....................................................................................................................................................................................................................................

C2: Rack Bottom Entry of Cables


Procedure

Run the cables:


...................................................................................................................................................................................................

Cover the cable entry windows with edge protection.

...................................................................................................................................................................................................

Pass the power cables for branch A through the left cable entry.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-28
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Protective Earth and Power Supply Cables

C2: Rack Bottom Entry of Cables

....................................................................................................................................................................................................................................

Figure 3-8 Bottom Cable Entry

...................................................................................................................................................................................................

Pass the GND cable and power cables for branch B through the right cable entry.
...................................................................................................................................................................................................

Fix the metallic braid to the raised floor cable way.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-29
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Protective Earth and Power Supply Cables

C2: Rack Bottom Entry of Cables

....................................................................................................................................................................................................................................

Figure 3-9 Metallic Braid Fixed to Raised Floor Cable Way

...................................................................................................................................................................................................

Cut the metallic sheet to the required length and fit a lug.
...................................................................................................................................................................................................

Screw the metallic sheet to the dedicated studs of the rack.


...................................................................................................................................................................................................

Run the power cables for branch A through the left cable duct to the top of the rack.
...................................................................................................................................................................................................

Run the GND cable and power cables for branch B through the right cable duct to the top
of the rack.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-30
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Protective Earth and Power Supply Cables

Connect Earth Cable (GND)

....................................................................................................................................................................................................................................

Connect Earth Cable (GND)


Overview
Nr

Materials

Reference

Kit

90 bent lugs

Depending on diameter of cables

Basic kit 3BK 27244 ABAA


(JDMX)

Tie wrap

Label

Consumable supplies

The following figure shows how to connect the earth cable.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-31
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Protective Earth and Power Supply Cables

Connect Earth Cable (GND)

....................................................................................................................................................................................................................................

Procedure

Connect the earth cable:


...................................................................................................................................................................................................

Label the site end of the GND cable (for example: 9130 MFS/BSC Evolution N 4).
...................................................................................................................................................................................................

Crimp an adapted lug at the site side and at the rack side of the GND yellow/green cable.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-32
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Protective Earth and Power Supply Cables

Connect Earth Cable (GND)

....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

Before connecting to the rack, connect the yellow/green GND cable to the site earth plate.
...................................................................................................................................................................................................

Connect the yellow/green GND cable to the rack.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-33
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Protective Earth and Power Supply Cables

Connect DC 48 Volts Power Cables

....................................................................................................................................................................................................................................

Connect DC 48 Volts Power Cables


Overview
Nr

Materials

Reference

Kit

Labels

3BK 25932 AAAA

Basic kit 3BK 27244 ABAA

90 bent lugs

Depending on diameter of cables

(JDMX)

Tie wrap

Consumable supplies

Procedure

Install the power cables:


...................................................................................................................................................................................................

Remove the protective covers for Branch A and Branch B.


...................................................................................................................................................................................................

Crimp a 6 lug at rack side for each power cable.


...................................................................................................................................................................................................

Fit sleeves on all cables.


...................................................................................................................................................................................................

Connect the black cables to BATR studs.


...................................................................................................................................................................................................

Connect the -48 Volts blue cables to BATA and BATB studs.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-34
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Protective Earth and Power Supply Cables

Connect DC 48 Volts Power Cables

....................................................................................................................................................................................................................................

Figure 3-10 Power Cables Connection

...................................................................................................................................................................................................

Crimp an adapted lug for all cables at the site side.


...................................................................................................................................................................................................

Connect the cables to the site fuse breakers.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-35
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Protective Earth and Power Supply Cables

Connect DC 48 Volts Power Cables

....................................................................................................................................................................................................................................

Figure 3-11 Site Fuse Breaker Example

...................................................................................................................................................................................................

Label the ends of each cable.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-36
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Protective Earth and Power Supply Cables

Connect DC 48 Volts Power Cables

....................................................................................................................................................................................................................................

Figure 3-12 Label Power Cables

E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-37
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Protective Earth and Power Supply Cables

Test Power Supply

....................................................................................................................................................................................................................................

Test Power Supply


Procedure

Test the power supply:


...................................................................................................................................................................................................

On the site power cabinet, check if DC 48 volts fuse breakers are switched OFF (BATA
and BATB).

...................................................................................................................................................................................................

On the rack side, check that all power breakers on JSXPDU are switched OFF;
otherwise switch them OFF.
...................................................................................................................................................................................................

On the rack side, check that the power breakers on all JBXPSs are switched OFF;
otherwise switch them OFF.
...................................................................................................................................................................................................

On the rack side, on the connection box, with an ohmmeter, test if there is no short
circuit between -48 volts (BATA or BATB) and 0 volts (BATR).

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-38
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Protective Earth and Power Supply Cables

Test Power Supply

....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

On the rack side, perform the same test between the -48V cables.

...................................................................................................................................................................................................

On the site power cabinet, check that the site fuse breakers correspond to the
recommendations from SPP 59 - Specification for 9130 BSC/MFS Evolution Site
Preparation.
...................................................................................................................................................................................................

On the site power cabinet, switch ON the DC 48 volts fuse breakers (BATA and BATB).
...................................................................................................................................................................................................

On the rack side, measure if 48 V is present on the BATA and verify the polarity.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-39
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install Protective Earth and Power Supply Cables

Test Power Supply

....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

On the rack side, measure if 48 V is present on the BATB and verify the polarity.

...................................................................................................................................................................................................

10

On the site power cabinet, switch OFF the site fuse breakers.
...................................................................................................................................................................................................

11

When all power lines are checked, replace the JSXPDU covers and fix them with the
provided screws.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-40
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install PCM Cables

Run 120 Ohm PCM Cables

....................................................................................................................................................................................................................................

Install PCM Cables


Run 120 Ohm PCM Cables
C1: Top Entry of Cables

Route the cables from the top:


...................................................................................................................................................................................................

Bind the cables in groups of eight cables as shown in the following figure.
Figure 3-13 Bind Cables

...................................................................................................................................................................................................

Run the group of eight cables through the cable ducts to the bottom of the rack.
...................................................................................................................................................................................................

Run the cables under the rack through the side cable entries of the rack.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-41
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install PCM Cables

Run 120 Ohm PCM Cables

....................................................................................................................................................................................................................................

Figure 3-14 Cable Routing Front View

...................................................................................................................................................................................................

Run the cables to the JSXLIU shelf through the front cable entry of the rack.
...................................................................................................................................................................................................

Separate the cables.


...................................................................................................................................................................................................

Label the PCM cables.


...................................................................................................................................................................................................

Leave the cables near JSXLIU shelf, not connected.


...................................................................................................................................................................................................

If a second ATCA shelf must be installed, run the cables before ATCA shelf installation.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-42
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install PCM Cables

Run 120 Ohm PCM Cables

....................................................................................................................................................................................................................................

Figure 3-15 Top Rack Cable Entry General View

E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-43
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install PCM Cables

Run 120 Ohm PCM Cables

....................................................................................................................................................................................................................................

C2: Bottom Entry of Cables

Route the cables from the bottom:


...................................................................................................................................................................................................

Run the cables through the front window in the bottom plate (see Figure 3-8, Bottom
Cable Entry (p. 3-29)).
...................................................................................................................................................................................................

Attach the cables to the rack using adhesive cable ties.


...................................................................................................................................................................................................

Label the PCM cables.


...................................................................................................................................................................................................

Leave the cables near the JSXLIU shelf, not connected.


...................................................................................................................................................................................................

If a second ATCA shelf must be installed, run the cables before ATCA shelf installation.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-44
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install PCM Cables

Run 120 Ohm PCM Cables

....................................................................................................................................................................................................................................

Figure 3-16 Cable Routing Front View

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-45
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install PCM Cables

Run 120 Ohm PCM Cables

....................................................................................................................................................................................................................................

Figure 3-17 Cable Routing Side View

E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-46
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install PCM Cables

Run 75 Ohm PCM Cables

....................................................................................................................................................................................................................................

Run 75 Ohm PCM Cables


Top Entry of Cables

Route the cables:


...................................................................................................................................................................................................

For the first eight cables on each side of the rack, run the free end of the cables, from the
bottom, through the cable duct to the top of the rack.
...................................................................................................................................................................................................

If more than eight cables are required on each side, run the cables between the cable duct
and the rack back side, close to the side walls.
Attention: Ensure that the PCM cables:

Are as close as possible to the side wall


Do not block a potential JSXLIU shelf dismantling from the back side of the rack

Cannot be damaged when running out at the rack top (edge protection is
available).

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-47
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install PCM Cables

Run 75 Ohm PCM Cables

....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

Run the cables under the JXSLIU shelf.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-48
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install PCM Cables

Run 75 Ohm PCM Cables

....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

Ensure that the PCM cables are close to the rack side panels.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-49
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install PCM Cables

Run 75 Ohm PCM Cables

....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

Label the PCM cables.


...................................................................................................................................................................................................

Connect the PCM cables to the JBXLIU boards.


...................................................................................................................................................................................................

Fit the PCM cables at the required length.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-50
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install PCM Cables

Run 75 Ohm PCM Cables

....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

Disconnect the PCM cables from the JBXLIU boards and leave them near the JSXLIU
shelf, not connected. PCM cable connection is performed during commissioning,
according to customer requirements.
E...................................................................................................................................................................................................
N D O F S T E P S

Bottom Entry of Cables

Route the cables from the bottom:


...................................................................................................................................................................................................

Run the cables through the front window in the bottom plate.
Note: If two JSXLIU shelves are used, the PCM cables can also be routed through the
side cable windows.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-51
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install PCM Cables

Run 75 Ohm PCM Cables

....................................................................................................................................................................................................................................

Figure 3-18 Bottom Cable Entry

...................................................................................................................................................................................................

Attach the cables to the rack using adhesive cable ties.


...................................................................................................................................................................................................

Label the PCM cables.


...................................................................................................................................................................................................

Connect the PCM cables to the JBXLIU boards.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-52
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install PCM Cables

Run 75 Ohm PCM Cables

....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

Fit the PCM cables at the required length.


...................................................................................................................................................................................................

Disconnect the PCM cables from the JBXLIU boards and leave them near the JSXLIU
shelf, not connected. PCM cable connection is performed during commissioning,
according to customer requirements.
The following figures show a front and side view for the cable routing solution.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-53
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install PCM Cables

Run 75 Ohm PCM Cables

....................................................................................................................................................................................................................................

Figure 3-19 Cable Routing Front View

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-54
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install PCM Cables

Run 75 Ohm PCM Cables

....................................................................................................................................................................................................................................

Figure 3-20 Cable Routing Side View

E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-55
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install PCM Cables

Install Cables in Cable Way

....................................................................................................................................................................................................................................

Install Cables in Cable Way


Overview

Note: Refer to Site Specific Information (p. 2-6) to know the quantity of PCM
cables to install.
If a second ATCA shelf must be installed, install the PCM cables now for this ATCA
shelf.
Nr

Materials

Reference

Kit

Tie wraps

Consumable supplies

Note: Before starting the installation, ensure that the PCM cables have the required
length.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-56
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Install PCM Cables

Install Cables in Cable Way

....................................................................................................................................................................................................................................

Procedure

Install the cables in the cable way:


...................................................................................................................................................................................................

Install cables in the PCM compartment of the cable tray.


...................................................................................................................................................................................................

Attach the cables with plastic tie wraps.


...................................................................................................................................................................................................

Mark the cables with a marker.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-57
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O2: Install Second Equipment in Rack

Install PCM Cables

....................................................................................................................................................................................................................................

O2: Install Second Equipment in Rack


Install PCM Cables
Procedure

To install the PCM cables for the second equipment, refer to Install PCM Cables
(p. 3-41).

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-58
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O2: Install Second Equipment in Rack

Install Second ATCA Shelf

....................................................................................................................................................................................................................................

Install Second ATCA Shelf


Prepare ATCA Shelf

Before starting the installation:


...................................................................................................................................................................................................

Unpack the second ATCA shelf.


...................................................................................................................................................................................................

Visually check that the ATCA shelf is in a good state.


...................................................................................................................................................................................................

Check on the rack that the 16 screws and/or nuts required for second ATCA shelf
installation are available.
...................................................................................................................................................................................................

Ensure that nothing can block the second ATCA shelf insertion in the cabinet.
...................................................................................................................................................................................................

Ensure that PCM cables for the second ATCA shelf are already installed; if they are not,
install the PCM cables before ATCA shelf installation.
E...................................................................................................................................................................................................
N D O F S T E P S

Install ATCA Shelf

Install the second ATCA shelf:


...................................................................................................................................................................................................

Put on an ESD wrist strap.


...................................................................................................................................................................................................

Connect the strap to the shelf by attaching the front or rear ESD jack.
...................................................................................................................................................................................................

Lift the shelf and place it above the existing one.


Attention: Do not hold the ATCA shelf from inside; hold it by the side panels.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-59
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O2: Install Second Equipment in Rack

Install Second ATCA Shelf

....................................................................................................................................................................................................................................

Figure 3-21 Wrong Handling of ATCA Shelf

...................................................................................................................................................................................................

Fasten the shelf to the rack with the provided screws.


E...................................................................................................................................................................................................
N D O F S T E P S

Install ATCA Shelf Power Cables

Perform the following steps:


...................................................................................................................................................................................................

Depending on the ATCA shelf variant


Apply the appropriate case:

Install ATCA Shelf Power Cables in Case of Shelf Variant Before 3BK 27291 ABxx
(p. 3-61)
Install ATCA Shelf Power Cables in Case from Shelf Variant 3BK 27291 ABxx On
(p. 3-64).

E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-60
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O2: Install Second Equipment in Rack

Install Second ATCA Shelf

....................................................................................................................................................................................................................................

Install ATCA Shelf Power Cables in Case of Shelf Variant Before 3BK 27291 ABxx

Connect the ground and power cables to the second ATCA shelf:
...................................................................................................................................................................................................

Open the back door of the rack.


...................................................................................................................................................................................................

Connect the ground cable to the ground stud of the shelf.


Figure 3-22 Ground Cable and ESD Jack Connection

...................................................................................................................................................................................................

Remove the M6 nuts and lockwashers from each of the connections on the JBXPSs and
set aside.
...................................................................................................................................................................................................

Install the power cables to the connections on the JBXPSs with the M6 nuts and
lockwashers previously removed. Torque nuts to 7.1 Nm (63 lbf.in).
...................................................................................................................................................................................................

Connect the power cables.


As follows:

-48V blue cable labeled Shelf 4 A1 M83 to JBXPS1 Power studs


0V blue-black cable labeled Shelf 4 A1 M83 to JBXPS1 Return studs

-48V blue cable labeled Shelf 4 A1 M81 to JBXPS3 Power studs


0V blue-black cable labeled Shelf 4 A1 M81 to JBXPS3 Return studs

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-61
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O2: Install Second Equipment in Rack

Install Second ATCA Shelf

....................................................................................................................................................................................................................................

-48V blue cable labeled Shelf 4 B1 M82 to JBXPS2 Power studs


0V blue-black cable labeled Shelf 4 B1 M82 to JBXPS2 Return studs
-48V blue cable labeled Shelf 4 B1 M80 to JBXPS4 Power studs

0V blue-black cable labeled Shelf 4 B1 M80 to JBXPS4 Return studs

Figure 3-23 Rear View of ATCA Shelf Variant Before 3BK 27291 ABxx

...................................................................................................................................................................................................

Fit the rubber protection caps on the terminals.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-62
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O2: Install Second Equipment in Rack

Install Second ATCA Shelf

....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

Switch JBXPSs handle switch to the Closed position.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-63
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O2: Install Second Equipment in Rack

Install Second ATCA Shelf

....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

Disconnect the wrist strap from the shelf.


...................................................................................................................................................................................................

Remove the ESD wrist strap from your hand.


...................................................................................................................................................................................................

10

Close the back door of the rack.


E...................................................................................................................................................................................................
N D O F S T E P S

Install ATCA Shelf Power Cables in Case from Shelf Variant 3BK 27291 ABxx On

Connect the ground and power cables to the second ATCA shelf:
...................................................................................................................................................................................................

Open the back door of the rack.


...................................................................................................................................................................................................

Connect the ground cable to the ground stud of the shelf.


Figure 3-24 Ground Cable and ESD Jack Connection

...................................................................................................................................................................................................

Remove the M6 nuts and lockwashers from each of the connections on the JBXPSs and
set aside.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-64
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O2: Install Second Equipment in Rack

Install Second ATCA Shelf

....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

Install the power cables to the connections on the JBXPSs with the M6 nuts and
lockwashers previously removed. Torque nuts to 7.1 Nm (63 lbf.in).
...................................................................................................................................................................................................

Connect the power cables.


As follows:

-48V blue cable labeled Shelf 4 A1 M81 to JBXPS1 Power studs


0V blue-black cable labeled Shelf 4 A1 M81 to JBXPS1 Return studs
-48V blue cable labeled Shelf 4 B1 M82 to JBXPS2 Power studs
0V blue-black cable labeled Shelf 4 B1 M82 to JBXPS2 Return studs
Note: Do not remove the protection from the free end of the unused power cables.

Figure 3-25 Rear View of ATCA Shelf from Shelf Variant 3BK 27291 ABxx On

...................................................................................................................................................................................................

Fit the rubber protection caps on the terminals.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-65
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O2: Install Second Equipment in Rack

Install Second ATCA Shelf

....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

Disconnect the wrist strap from the shelf.


...................................................................................................................................................................................................

Remove the ESD wrist strap from your hand.


...................................................................................................................................................................................................

Close the back door of the rack.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-66
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O2: Install Second Equipment in Rack

Install Second LIU Shelf

....................................................................................................................................................................................................................................

Install Second LIU Shelf


Prepare Second LIU Shelf

Before starting the installation:


...................................................................................................................................................................................................

Unpack the second LIU shelf.


...................................................................................................................................................................................................

Visually check that the LIU shelf is in a good state.


...................................................................................................................................................................................................

Ensure that nothing can block the second LIU shelf insertion in the cabinet.
...................................................................................................................................................................................................

Identify the installation case.


As follows:

The existing LIU shelf is installed from the rear


The existing LIU shelf is installed from the front.

...................................................................................................................................................................................................

Perform the following steps only if the shelf must be installed from the front.
...................................................................................................................................................................................................

Loosen the screws fixing the brackets at the rear of the shelf and remove the brackets.
Figure 3-26 Brackets at Shelf Rear

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-67
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O2: Install Second Equipment in Rack

Install Second LIU Shelf

....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

Fit the screws to the former position.


...................................................................................................................................................................................................

Loosen the screws at the front of the shelf.


...................................................................................................................................................................................................

Mount the fixation brackets at the front of the shelf and fix them with the screws.
Figure 3-27 Brackets at Shelf Front

E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-68
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O2: Install Second Equipment in Rack

Install Second LIU Shelf

....................................................................................................................................................................................................................................

Install LIU Shelf

Install the LIU shelf:


...................................................................................................................................................................................................

Put on an ESD wrist strap.


...................................................................................................................................................................................................

Connect the strap to the shelf by attaching the front or rear ESD jack.
...................................................................................................................................................................................................

Lift the shelf and place it above the existing one.


As follows:

From the back when the existing LIU shelf is installed from the rear
From the front when the existing LIU shelf is installed from the front.
Attention: Do not hold the LIU shelf from inside; hold it by the side panels.

...................................................................................................................................................................................................

Fasten the shelf to the rack with the provided screws.


...................................................................................................................................................................................................

Connect the power cables to the JBXPEM boards.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-69
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O2: Install Second Equipment in Rack

Install Internal Ethernet Cables

....................................................................................................................................................................................................................................

Install Internal Ethernet Cables


Procedure

Install the internal Ethernet cables:


...................................................................................................................................................................................................

Connect the first JLCAT6 Ethernet cable (1AB 22983 0005) between ATCA shelf 4,
JAXSSW1, Ethernet port 2 and the GbE port on JBXMUX1 (slot 10) in JSXLIU shelf 2.
...................................................................................................................................................................................................

Connect the second JLCAT6 Ethernet cable (1AB 22983 0005) between ATCA shelf 4,
JAXSSW2, Ethernet port 2 and the GbE port on JBXMUX2 (slot 12) in JSXLIU shelf 2.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-70
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O3, O4, O5, O6, O7: Install Ethernet Cables

O3: Install OMC-R Router Cables

....................................................................................................................................................................................................................................

O3, O4, O5, O6, O7: Install Ethernet Cables


O3: Install OMC-R Router Cables
Overview
Nr

Materials

Reference

Kit

Labels OMC-R
Ethernet cables

Basic kit 3BK 27244 ABAA (JDMX)

OMC-R Ethernet
cables (ALETHD)

3BW 01804 JA

Procedure

Install the OMC-R (and CBC for the 9130 BSC Evolution) router cables:
...................................................................................................................................................................................................

Refer to Site Specific Information (p. 2-6) for quantity and cabling of OMC-R cables.
...................................................................................................................................................................................................

Pass the cables into the cabinet the same way as for PCM cables.
...................................................................................................................................................................................................

Attach the cable to the rack.


...................................................................................................................................................................................................

If the connecting position is unknown, do not connect the cables.


...................................................................................................................................................................................................

Label the cables at each end, near the connectors.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-71
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O3, O4, O5, O6, O7: Install Ethernet Cables

O4: Install A-GPS Server Cable

....................................................................................................................................................................................................................................

O4: Install A-GPS Server Cable


Overview
Nr

Materials

Reference

Kit

Labels A-GPS
Ethernet cable

Basic kit 3BK 27244 ABAA (JDMX)

A-GPS Ethernet
cables (ALETHD)

3BW 01804 JA

Procedure

Install the A-GPS cables:


...................................................................................................................................................................................................

Refer to Site Specific Information (p. 2-6) for quantity and cabling of A-GPS cables.
...................................................................................................................................................................................................

Pass the cables into the cabinet the same way as for the PCM cables.
...................................................................................................................................................................................................

Attach the cable to the rack.


...................................................................................................................................................................................................

If the connecting position is unknown, do not connect the cables.


...................................................................................................................................................................................................

Label the cables at each end, near the connectors.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-72
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O3, O4, O5, O6, O7: Install Ethernet Cables

O5: Install External Alarm Box

....................................................................................................................................................................................................................................

O5: Install External Alarm Box


Overview
Nr

Materials

Reference

Kit

Labels EAB
Ethernet cable

Basic kit 3BK 27244 ABAA (JDMX)

External Alarm Box

3BW 01804 JA

Procedure

Install the External Alarm Box:


...................................................................................................................................................................................................

Refer to External Alarm Box Installation and Commissioning.


...................................................................................................................................................................................................

Pass the cable for EAB into the cabinet in the same way as for the PCM cables.
...................................................................................................................................................................................................

Attach the cable to the rack.


...................................................................................................................................................................................................

If the connecting position is unknown, do not connect the cable.


...................................................................................................................................................................................................

Label the cable at each end, near the connectors.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-73
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O3, O4, O5, O6, O7: Install Ethernet Cables

O6: Install SGSN Router Cables

....................................................................................................................................................................................................................................

O6: Install SGSN Router Cables


Overview
Nr

Materials

Reference

Kit

Labels SGSN
Ethernet cables

Basic kit 3BK 27244 ABAA (JDMX)

SGSN Ethernet
cables (ALETHD)

3BW 01804 JA

Procedure

Install the SGSN router cables:


...................................................................................................................................................................................................

Refer to Site Specific Information (p. 2-6) for the quantity and cabling of SGSN cables.
...................................................................................................................................................................................................

Pass the cables into the cabinet the same way as for the PCM cables.
...................................................................................................................................................................................................

Attach the cable to the rack.


...................................................................................................................................................................................................

If the connecting position is unknown, do not connect the cables.


...................................................................................................................................................................................................

Label the cables at each end, near the connectors.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-74
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O3, O4, O5, O6, O7: Install Ethernet Cables

O7: Install Ethernet Cables for IP Telecom Traffic in Release


B11

....................................................................................................................................................................................................................................

O7: Install Ethernet Cables for IP Telecom Traffic in Release


B11
Overview
Nr

Materials

Reference

Kit

Labels IP telecom
traffic Ethernet
cables

Basic kit 3BK 27244 ABAA (JDMX)

IP telecom traffic
Ethernet cables
(ALETHD)

3BW 01804 JA

Procedure

Install the IP telecom traffic router cables:


...................................................................................................................................................................................................

Refer to the BSS Telecom Routing Configuration.


...................................................................................................................................................................................................

Pass the cables into the cabinet the same way as for the PCM cables.
...................................................................................................................................................................................................

Attach the cable to the rack.


...................................................................................................................................................................................................

If the connecting position is unknown, do not connect the cables.


...................................................................................................................................................................................................

Label the cables at each end, near the connectors.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-75
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O8: Install Optical Cables for STM1 in Release B11

How to Install Optical Cables for STM1 in Release B11

....................................................................................................................................................................................................................................

O8: Install Optical Cables for STM1 in Release B11


How to Install Optical Cables for STM1 in Release B11
Overview

Note: This task must be performed only if the STM1 option was selected at BSC side.
An optical fiber cable (patch cord) is a very sensitive object. Please handle it with
care.
When routing the optical fiber cables, ensure that the bending radius is higher than the
minimum bending radius provided by the manufacturer. Generally the bending radius
of a optical cable is greater than 20D, where D is the diameter of cable.
Follow the manufacturer's recommendations.
Refer to Site Specific Information (p. 2-6) for the number of STM1 cables to install.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-76
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O8: Install Optical Cables for STM1 in Release B11

Install Optical Cables in Cable Way

....................................................................................................................................................................................................................................

Install Optical Cables in Cable Way


Overview
Nr

Materials

Reference

Kit

Basic installation
kit for Optical Fibre
cable

3BK27700ABAA

Consumable supplies

Figure 3-28 Install Optical Cable in cable tray

Procedure

Install the optical cables in the cable way:


...................................................................................................................................................................................................

Install the optical cables in the STM1 compartment of the cable tray.
...................................................................................................................................................................................................

Attach the optical cables with plastic tie wraps.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-77
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O8: Install Optical Cables for STM1 in Release B11

Install Optical Cables in Cable Way

....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

Mark the optical cables with a marker.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-78
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O8: Install Optical Cables for STM1 in Release B11

Install SFP Modules

....................................................................................................................................................................................................................................

Install SFP Modules


Procedure

Install an SFP Module:


...................................................................................................................................................................................................

Connect the anti-static wrist strap.


...................................................................................................................................................................................................

Replace the protective rubber from the SFP module and insert straight into the slot until
the module clicks firmly into place. When inserting the SFP, be sure that the hinged face
is closed.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-79
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O8: Install Optical Cables for STM1 in Release B11

Install SFP Modules

....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

Disconnect the anti-static wrist strap.


E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-80
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O8: Install Optical Cables for STM1 in Release B11

Route Optical Cables

....................................................................................................................................................................................................................................

Route Optical Cables


Overview

Note: The optical fiber cable cannot be cut to the correct length. You must therefore
adjust the cable length by making loops with the cable in the rack or cable tray.
C1: Route Optical Cables by Top Entry of Rack

Run the optical cables from the top of rack:


...................................................................................................................................................................................................

Run the optical cables at the top rack entry.


Figure 3-29 Cables Rack Top Entry

...................................................................................................................................................................................................

Run the optical cables at the back of the rack from top to bottom. Attach the optical cables
with plastic tie wraps.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-81
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O8: Install Optical Cables for STM1 in Release B11

Route Optical Cables

....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

From the bottom of the rack pass optical cable in front of the rack, route them until you
reach front of the JBXTP3 boards. Attach the optical cables with plastic tie wraps from
this point. Refer to Figure 3-31, Optical Cable Connection on JBXTP3 Board (p. 3-84).
E...................................................................................................................................................................................................
N D O F S T E P S

C2: Route Optical Cables by Bottom Entry of Rack

Note: The optical fibre cable cannot be cut to the correct length. You must therefore
adjust the cable length making loops with the optical cable in the rack or cable tray.
Perform the following steps:
...................................................................................................................................................................................................

Run the optical cables at the bottom rack entry.


...................................................................................................................................................................................................

Run the optical cables from the bottom of the rack to the front side of the JBXTP3.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-82
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O8: Install Optical Cables for STM1 in Release B11

Route Optical Cables

....................................................................................................................................................................................................................................

Figure 3-30 Cables Routing Bottom Entry - Rear View

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-83
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
O8: Install Optical Cables for STM1 in Release B11

Route Optical Cables

....................................................................................................................................................................................................................................

The following figure shows the optical fibre cable connection positions on the front plate
of the JBXTP3 boards.
Figure 3-31 Optical Cable Connection on JBXTP3 Board

E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-84
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario

How to Finish Installation

....................................................................................................................................................................................................................................

Finish Installation
How to Finish Installation
Procedure

Finish the installation:


...................................................................................................................................................................................................

Fit the plinth cover.


Figure 3-32 Fit Rack Bottom Cover Plate

...................................................................................................................................................................................................

Fit the top cover and fix it with provided screws.


...................................................................................................................................................................................................

Fit the labels to the rack (for example: 9130 MFS/BSC Evolution n12).
...................................................................................................................................................................................................

Close the front door and leave the rack key to the door with the customer.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-85
3MN-00467-1011-RJZZA
Issue 1 March 2012

Scenario
Finish Installation

How to Finish Installation

....................................................................................................................................................................................................................................

Figure 3-33 Close Doors

...................................................................................................................................................................................................

Clear away packaging.


...................................................................................................................................................................................................

Clean the site. Do not put packages into the customer bin.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9130 BSC/MFS
3-86
3MN-00467-1011-RJZZA
Issue 1 March 2012