(iv) Minimize the burden of the control number. The OMB control • Frequency of response: One time
collection of information on those who numbers for EPA’s regulations in title 40 per delegation request
are to respond, including through the of the CFR, after appearing in the • Estimated total average number of
use of appropriate automated electronic, Federal Register when approved, are responses for each respondent: 8
mechanical, or other technological listed in 40 CFR part 9, are displayed • Estimated total annual burden
collection techniques or other forms of either by publication in the Federal hours: 41,577
information technology, e.g., permitting Register or by other appropriate means, • Estimated total annual respondent
electronic submission of responses. In such as on the related collection costs: $1,816,490. This includes an
particular, EPA is requesting comments instrument or form, if applicable. The estimated labor burden cost of
from very small businesses (those that display of OMB control numbers in $1,790,760 and operation and
employ less than 25) on examples of certain EPA regulations is consolidated maintenance costs result from
specific additional efforts that EPA in 40 CFR part 9. photocopying and postage expenses,
could make to reduce the paperwork Abstract: This information collection which are a total of $25,720.
burden for very small businesses is an application from State, territorial,
local, or tribal agencies (S/L/Ts) for Are There Changes in the Estimates
affected by this collection.
delegation of regulations developed From the Last Approval?
What Should I Consider When I under section 112 of the Clean Air Act We are in the process of reviewing the
Prepare My Comments for EPA? (Act). The five options for delegation are key assumptions in the ICR that affect
You may find the following straight delegation, rule adjustment, rule the overall burden estimation. These
suggestions helpful for preparing your substitution, equivalency by permit, or include, the number of delegation
comments: state program approval. The information activities expected to occur during the
1. Explain your views as clearly as is needed and used to determine if the upcoming clearance period, the
possible and provide specific examples. entity submitting an application has met delegation options most likely to be
2. Describe any assumptions that you the criteria established in the subpart E used by the delegated S/L/Ts, and the
used. rule, codified as 40 CFR part 63, subpart burden associated with each of the
3. Provide copies of any technical E, in accordance with section 112(l) of options. Depending on the outcome of
information and/or data you used that the Act. This information is necessary this review, there could be changes in
support your views. and required for the Administrator to the overall burden estimates.
4. If you estimate potential burden or determine the acceptability of approving
costs, explain how you arrived at the the S/L/T’s rules, requirements or What Is the Next Step in the Process for
estimate that you provide. programs in lieu of the Federal section This ICR?
5. Offer alternative ways to improve 112 rules or programs. Additionally, it EPA will consider the comments
the collection activity. is also necessary for the proper received and amend the ICR as
6. Make sure to submit your performance of our function, and will be appropriate. The final ICR package will
comments by the deadline identified used to ensure that the subpart E then be submitted to OMB for review
under DATES. approval criteria have been met. The and approval pursuant to 5 CFR
7. To ensure proper receipt by EPA, collection of information is authorized 1320.12. At that time, EPA will issue
be sure to identify the docket ID number under 42 U.S.C. 7401–7671q. another Federal Register notice
assigned to this action in the subject Burden Statement: The annual public pursuant to 5 CFR 1320.5(a)(1)(iv) to
line on the first page of your response. reporting and recordkeeping burden for announce the submission of the ICR to
You may also provide the name, date, this collection of information is OMB and the opportunity to submit
and Federal Register citation. estimated to average 341 hours per S/L/ additional comments to OMB. If you
T and 41 hours per application. Burden have any questions about this ICR or the
What Information Collection Activity or means the total time, effort, or financial
ICR Does This Apply to? approval process, please contact the
resources expended by persons to technical person listed under FOR
Affected entities: Entities potentially generate, maintain, retain, or disclose or FURTHER INFORMATION CONTACT.
affected by this action are S/L/Ts provide information to or for a Federal
participating in this voluntary program. agency. This includes the time needed Dated: April 20, 2007.
These government establishments are to review instructions; develop, acquire, Gregory A. Green,
classified as Air and Water Resource install, and utilize technology and Director, Outreach and Information Division.
and Solid Waste Management Programs systems for the purposes of collecting, [FR Doc. E7–8098 Filed 4–26–07; 8:45 am]
under Standard Industrial Classification validating, and verifying information, BILLING CODE 6560–50–P
(SIC) code 9511 and North American processing and maintaining
Industry Classification System (NAICS) information, and disclosing and
code 92411. No industries under any providing information; adjust the ENVIRONMENTAL PROTECTION
SIC or NAICS codes will be included existing ways to comply with any AGENCY
among respondents. previously applicable instructions and [ER–FRL6686–4]
Title: Application Requirements for requirements which have subsequently
the Approval and Delegation of Federal changed; train personnel to be able to Environmental Impact Statements and
Air Toxics Programs to State, Territorial, respond to a collection of information; Regulations; Availability of EPA
Local, and Tribal Agencies. search data sources; complete and Comments
ICR numbers: EPA ICR No. 1643.06, review the collection of information;
OMB Control No. 2060–0264. Availability of EPA comments
cprice-sewell on PROD1PC66 with NOTICES
VerDate Aug<31>2005 15:18 Apr 26, 2007 Jkt 211001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 E:\FR\FM\27APN1.SGM 27APN1
Federal Register / Vol. 72, No. 81 / Friday April 27, 2007 / Notices 21005
Interchange around the North Little of Juneau, AK, Wait Period Ends: 05/ Field, Naval Air Station (NAS)
Rock Metropolitan Area, New and 29/2007, Contact: Patti Sullivan 907– Oceana, VA; Marine Corps Air Station
Updated Information, Funding, 271–5454. (MCAS) Cherry Point, NC, Comment
Pulaski County, AR. EIS No. 20070159, Draft EIS, COE, FL, Period Ends: 05/09/2007, Contact:
Summary: EPA does not object to the Central and Southern Florida Project, Francine Blend 757–322–4332.
proposed project. Rating LO. Comprehensive Everglades Revision to FR Notice Published 02/