Task PhasSub phParticulars


1 Pre Construction Process
1.1
Bankground Research
Searcing for location
Price comparison of locations
Utility comparison of locations
1.2
Engineerig of the building
Basic structureture of the building
Loads and Pillers
Roof structures
Geothehnical engineering
1.3
Building Permission
Application for the permit building plan
Sanction letter from the government
1.4
Construction of the Buildind
Finding Contractors and sub contractors
Bidding for Contractors
Selection of contractors
Selection of Supplier
Description of supplied materials
1.5
Scheduling of the Work
Time allotment of the work
Division of labour
1.6
Financing The Project
Comparison between banlks and othe lenders for loan
Application of Construction loan
mortgage and securities
Sanctioned loan from the bank
2 Fundamental Phase
2.1
Temporary arrangement to work
Temporaty Water
Temporaty Electricity
Temporary toilet
Temporary disposal
2.2
Layout Design
Survey and measurement
Layot designing
2.3
Construction Foundation
Excavation
Basement developemnt
2.4
Safety and longivity
Dampproofing
Waterproofing

2.4.c
2.5.a
2.5.b

3.1.a
3.1.b
3.1.c
3.1.d
3.1.e

4.1.a
4.1.b
4.1.c
4.1.d
4.2.a
4.3.a
4.3.b
4.4.a

5.1.a
5.1.b
5.1.c
5.1.d
5.1.e
5.2.a
5.2.b
5.2.c
5.2.d

Window well
2.5
Plumbing
Water connection
Sewer
3 Basic Construction
3.1
Construction
Floors
Walls
Wall insulation
Starecases and lift provision
Roof structures
4 Interior
4.1
Carpentary
Windows
Doors
Shelves and cupboard
bims and sasing
4.2
Grills
Grills in windows
4.3
Electricity
Making points for appliences
Arrangement of the connection
4.4
Paint
Colouring and painting
5 Finishing phase
5.1
Fittings and Fixtures
Bathroom fittings
Kitchen Fittings
Gas connection
House wrap
Exterios concrete
5.2
Decoration
Finishing hardware, plumbing and electrical
Carpet
Final inspestion
Final clean

Prerequisit IDs Procurement?

Procurement document ID

1.1.a
1.1.a
1.1
1.1
1.2.a
1.2.a
1.2.a
1.2
1.2
1.3.a
1.3
1.3
1.4.a
1.4.b
1.4.c
1.4.d
1.4
1.4
1.4
1.4
1.4
1.6.a
1.6.a
1.6.a
1.5 &1.6
1.5 &1.6
1.5 &1.6
2.1.a
2.1.a
2.1.b

X
X
X
X

2.1/Water
2.1/Electricity
2.1/Toilet
2.1/Disposal

2.3/Basement

2.1
2.1
2.2.a
2.2.b
2.2
2.3.a

2.3
2.3 X
2.3 X

2.4/Dampproofing
2.4/Waterproofing

2.3
2.4
2.4
2.5.a

3.1.a
3.1.b
3.1.c
3.1.e

2.5
2.5
2.5 X
X
X
X
X
3
3X
3.1 X
3.1 X

3.1/Floor
3.1/Walls
3.1/Wall Insulation
3.1/Starecases
3.1/Roof
4.1/Window
4.1/Doors
4.1Shelves

4.1.a
4.1.b
4.1
4.1 X
4.2
4.2 X

4.2/Grill
4.3/Electric cnnection

4.3.a
4.3.b

5.1.a
5.1.b
5.1.c
5.1.d

4.3 X
4.3
4.4
4.4 X
X
X
X
5.1
5.1
5.1 X

5.2.a
5.2.b

4.4/Paint

5.1/Bathroom Fittings
5.1/Kitchen Fittings
5.1/House Wrap
5.1/Exterior

5.2/Carpet

Comment

To start he work temporary living


arrangements ware made with basic
facilities like water, toilet and
electricity

Construction materials were procured


Construction materials were procured
Construction materials were procured

Construction materials were


procured

Woods and carpentary materials


were procured

Grills were bought


Connection were made with supplier

Colours were bought

Hardwear materials were bought

Construction materials were


procured

Carpets were bought

Document ID
2.1/Water
2.1/Electricity
2.1/Toilet
2.1/Disposal
2.3/Basement
2.4/Dampproofing
2.4/Waterproofing
3.1/Floor
3.1/Walls
3.1/Wall Insulation
3.1/Starecases
3.1/Roof
4.1/Window
4.1/Doors
4.1Shelves
4.2/Grill
4.3/Electric cnnection
4.4/Paint
5.1/Bathroom Fittings
5.1/Kitchen Fittings
5.1/House Wrap
5.1/Exterior
5.2/Carpet

Title
Arrangement
Arrangement
Arrangement
Arrangement

of
of
of
of

Water Supply Line for a temporary basis


Electricity Supply Line for a temporary basis
Toilet Construction for a temporary basis
Waste Disposal for a temporary basis

Procurement of material for basement development


Procurement of chemicalsfor damp proofing
Procurement of chemicalsfor Waterproofing
Procuremet of marbels for floor
Procurement of concrete for basement development
Procurement of Insulation material
Procure for Construction material
Procure for Construction material
Woods for Interior
Woods for Interior
Woods for Interior
Procurement of grills
Arrangement of electricity connection
Arrangement of Paint colours
Procurement of Bathroom Fittings
Procurement of Kitchen Fittings
Procurement for house wrap
Construction material for Experior
Procurement of Carpet

Comment
A temporary arrangement was done for the living of the workers. This includes a
construction for residing, a toilet, water supply line, electricity line and post
construction disposal connection
Construction materials like cement, stonecheaps, sand were procured for
basement, walls and roofs. These materials were procured collectively.
Different chemicals were procured for the safety and longivity of the
construction
Marbels were bought for flooring
Construction materials like cement, stonecheaps, sand were procured for
basement, walls and roofs. These materials were procured collectively.

Wooden logs were bought for the interior

Fitting grills were bought from windows


Deal with electricity supplier was made
Multiple
Hardwares were arranged for Kitchen and Bathroom fittings
Construction materials like cement, stonecheaps, sand were procured for
basement, walls and roofs. These materials were procured collectively.
Carpets for decoration were bought