Вы находитесь на странице: 1из 21

Monday, 15 June 2015

Time
8.00 am

Events
Today is the first day of internship. As I enter Natural Resource and
Environmental Board (NREB) office at 8.00 am, I was introduced to Mr
Joseph Uyo as the person that will be my supervisor throughout this internship.
He introduced me to every employees that were present at the particular time
and he also brings me around the place. He then brings me to his office to
discuss stuff regarding internship at NREB.

11.00 am

Mr Joseph Uyo hands me my training schedule and assign me tasks that I


would be doing throughout this internship. From the training schedule, I would
be involved in Human Resource, Administration and Finance Department these
2 weeks.

2.00 pm

I was given Natural Resource and Environmental Ordinance (NREO). I was


required to read and understand the laws written on the NREO as NREB
focused more on enforcing rules.

Tuesday, 16 June 2015


Time
8.00 am

Events
Arrived at the office on time.

8.30 am

A meeting was held and I was invited to join the meeting as well. The meeting
is about the upcoming activities that are going to be held.

12.30 pm

Lunch

2.00 pm

We continue the meeting with the second part of the agenda. Like any other
meeting, there were few suggestions being exchange for betterment of the
event.

Wednesday, 17 June 2015


Time
8.00 am

Events
Arrived at the office on time. As I continue reading the III Part of the
Ordinance at 8.00 am, I learn that the Board makes order for the conservation
of natural resources to prevent injury to the natural resources and for protection

12.30 pm

Lunch

2.00 pm

As I continue to study Part V of the Ordinances regarding Fund and Financial


Provision, I learned that the Funds given to NREB is used to pay any

expenditure lawfully incurred by the Boards which includes legal fees and
other fees and costs, the salaries, remuneration and allowances of members,
committees, officers and servants appointed and employed by the Board,
including superannuation allowances, provident fund, pensions and gratuities.

Thursday, 18 June 2015


Time
8.00 AM

Events
Arrived at the office on time

8.15 AM

On the last part of the ordinance, Part VI, is about miscellaneous provisions is
according to Miss Sati is a significant part of ordinance and interrelated to
NREB Miris line of work.

11.45 AM

Lunch

2.00 PM

The last part of the ordinance explains about the specific offence such as open
burning of refuse or other combustible materials on any land, the penalty of
any person who without the written permission of the Controller, cuts, destroys
or burns vegetation in any area which is not Native Customary Land or Native
Area Land. It also explains about miscellaneous offences, pollution of lands,
presumption, defence, default in compliance with notice or order, power of
entry and investigation, power of seizure, offence by bodies of persons, power
to prosecute and legal representation, public servants, personal immunity of
members, officers and employees, Public Authority Protection Act 1948, and
Security for protection under laws

Friday, 19 June 2015


Time
8.00 AM

Events
Arrived at workplace on time

8.10 AM

As I finished reading the Natural Resource and Environmental Ordinance


yesterday, I continue to read and study about ISO 9001:2008 as it is a part of
my task later to maintain and updating the files and records the relevant section
of ISO 9001:2008 Standard.

12.30 PM

Lunch

2.00 PM

Continue reading and learning about ISO 9001:2008

Monday, 22 June 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Study about case study on Environmental Management Plan Proposed Mixed


Development (Miri Waterfront Transformation) at Miri Waterfront, Miri
Division

12.30 PM

Lunch

2.00 PM

Continue studying about case study on Environmental Management Plan


Proposed Mixed Development (Miri Waterfront Transformation) at Miri
Waterfront, Miri Division

Tuesday, 23 June 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Study about case study on Environmental Management Plan Proposed Mixed


Development (Miri Waterfront Transformation) at Miri Waterfront, Miri
Division

12.30 PM

Lunch

2.00 PM

Continue studying about case study on Environmental Management Plan


Proposed Mixed Development (Miri Waterfront Transformation) at Miri
Waterfront, Miri Division

Wednesday, 24 June 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Study about case study on Environmental Management Plan Proposed Mixed


Development (Miri Waterfront Transformation) at Miri Waterfront, Miri
Division

12.30 PM

Lunch

2.00 PM

Continue studying about case study on Environmental Management Plan


Proposed Mixed Development (Miri Waterfront Transformation) at Miri

Waterfront, Miri Division

Thursday, 25 June 2015


Time
8.00 AM

Events
Arrived at the office on time

8.30 AM

Followed Mdm Radziah binti Yusuf to SK Lutong for Pencinta Alam Sekitar
Clubs annual report and meeting headmaster/teachers in charge for the club.

10.30 AM

Followed Mdm Radziah binti Yusuf to SJK Chung Hua for Pencinta Alam
Sekitar Clubs annual report and meeting headmaster/teachers in charge for the
club.

12.50 PM

Lunch

2.00 PM

Make report about the visitation at school today

Friday, 26 June 2015


Time
8.00 AM

Events
Arrived at the office on time

8.30 AM

Followed Mdm Radziah binti Yusuf to SK Pendidikan Khas for Pencinta Alam
Sekitar Clubs annual report and meeting headmaster/teachers in charge for the
club.

10.30 AM

Followed Mdm Radziah binti Yusuf to SK Anchi for Pencinta Alam Sekitar
Clubs annual report and meeting headmaster/teachers in charge for the club.

12.00 PM

Lunch

2.00 PM

Make report about the visitation today

Monday, 29 June 2015


Time
8.00 AM

Events
Arrived at the office on time

10.30 AM

Collect water sample of Sg. Baram Point NB1: Express Wharf

11.00 AM

Collect water sample of Sg. Baram Point NB 2: Miri Port

11.40 AM

Collect water sample of Sg Baram Point NB3: Asian Bridge

12.00 AM

Lunch

1.30 PM

Sending water sample to Bintulu (Overnight at Bintulu)

Tuesday, 30 June 2015


Time
8.00 AM

Events
Sent water sample to Jabatan Kimia Malaysia, Bintulu branch

12.30 PM

Drove back to Miri (Day off for the rest of the day)

Wednesday, 1 July 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Make report regarding water sampling at Sg. Baram

12.30 PM

Lunch

2.00 PM

Continue with report regarding water sampling at Sg. Baram

Thursday, 2 July 2015


Time
8.00 AM

Events
Arrived at the workplace on time.

8.30 AM

Went to Marudi for inspection with 3 senior staffs which are Mdm Sati, Mr
Kennedy and Mr Salleh after they received report from NREB HQ in Kuching
regarding open burning. The signal was detected by satellite and we went there
according to the direction by GPS tracker

10.30 AM

Arrived at Marudi area (plantation/forest). The inspection began.

10.45 AM

We arrived at the place according to coordinate. The forest has been burnt
down and there are no longer flames. We talked to the workers and warn them
that their burning licence is going to expired tomorrow so they are not allow to

burn anymore forest.


1.00 PM

Lunch

2.00 PM

We went back using the same route as we used previously and we saw another
group of people without licence is burning down forest. Thus, we immediately
go there and warn them of the consequence of open burning without legal
licence and the fines that we will enforce upon them if they did not put off the
fire.

Friday, 3 July 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Make report regarding hotspot inspection at Marudi area yesterday

12.30 PM

Lunch

2.00 PM

Continue with report regarding hotspot inspection at Marudi area yesterday

Monday, 6 July 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.30 AM

I was invited to go along to building construction called Pull Men Hotel and
Resort as a part if an inspection

8.45 AM

We arrived at the building construction and we enter the building up to 22th


floor to meet the manager of the construction site. He hand in Environment
Inspection Assessment (EIA) to us and we make sure that the construction site
is doing what was written on the report.

10.00 AM

We walked around the construction site and arrived at the dumping site. We
found out that their waste management is not in order and have disturbed land
next to the construction site. Warning has been given to the manager of the
construction site and arrived as well as the owner of the land.

12.30 PM

Lunch

2.00 PM

Back at the office to make report about inspection this morning.

Tuesday, 7 July 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Make report regarding hotspot inspection at Pullman Hotel yesterday

12.30 PM

Lunch

2.00 PM

Continue with report regarding hotspot inspection at Pullman Hotel yesterday

Wednesday, 8 July 2015


Time
8.00 AM

Events
Arrived at the workplace on time

9.00 AM

Given briefing about 5S by Mdm Pauline and was asked to arrange documents,
chairs and tables according to code number.

11.00 AM

Make a short report/summary on regarding 5S and to be given to Mdm Pauline

12.30 PM

Lunch

2.00 PM

Continue with the progress report regarding 5S

Thursday, 9 July 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue with case study on Environmental Management Plan Proposed


Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri
Division

12.30 PM

Lunch

2.00 PM

Continue with case study on Environmental Management Plan Proposed


Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri
Division

Friday, 10 July 2015


Time
8.00 AM

Events
Arrived at the workplace on time

9.00 AM

I went for weekly town inspection called Proactive with Mdm Jessica and
another intern, Kristie Nina. The inspection is necessary to monitor the
environment and to make sure that there is no open burning done around Miri
area.

11.00 AM

Continue with case study on Environmental Management Plan Proposed


Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri
Division

12.00 PM

Lunch

2.00 PM

Continue with case study on Environmental Management Plan Proposed


Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri
Division

Monday, 13 July 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Start on new case study on Environmental Management Plan Proposed


Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri
Division

12.00 PM

Lunch

2.00 PM

Continue working on case study on Environmental Management Plan


Proposed Mixed Development (Miri Waterfront Transformation) at Miri
Waterfront, Miri Division

Tuesday, 14 July 2015


Time
8.00 AM
8.10 AM

Events
Arrived at the workplace on time
Continue working on case study on Environmental Management Plan
Proposed Mixed Development (Miri Waterfront Transformation) at Miri
Waterfront, Miri Division

12.00 PM

Lunch

2.00 PM

Continue working on case study on Environmental Management Plan


Proposed Mixed Development (Miri Waterfront Transformation) at Miri
Waterfront, Miri Division

Wednesday, 15 July 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue working on case study on Environmental Management Plan


Proposed Mixed Development (Miri Waterfront Transformation) at Miri
Waterfront, Miri Division

12.00 PM

Lunch

2.00 PM

Continue working on case study on Environmental Management Plan


Proposed Mixed Development (Miri Waterfront Transformation) at Miri
Waterfront, Miri Division

Thursday, 16 July 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue working on case study on Environmental Management Plan


Proposed Mixed Development (Miri Waterfront Transformation) at Miri
Waterfront, Miri Division

12.00 PM

Lunch

2.00 PM

Continue working on case study on Environmental Management Plan


Proposed Mixed Development (Miri Waterfront Transformation) at Miri
Waterfront, Miri Division

Friday, 17 July 2015 ---- Hari Raya Aidilfitri


Monday, 20 July 2015

Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue working on case study on Environmental Management Plan


Proposed Mixed Development (Miri Waterfront Transformation) at Miri
Waterfront, Miri Division

12.00 PM

Lunch

2.00 PM

Continue working on case study on Environmental Management Plan


Proposed Mixed Development (Miri Waterfront Transformation) at Miri
Waterfront, Miri Division

Tuesday, 21 July 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue working on case study on Environmental Management Plan


Proposed Mixed Development (Miri Waterfront Transformation) at Miri
Waterfront, Miri Division

12.00 PM

Lunch

2.00 PM

Continue working on case study on Environmental Management Plan


Proposed Mixed Development (Miri Waterfront Transformation) at Miri
Waterfront, Miri Division

Wednesday, 22 July 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue working on case study on Environmental Management Plan


Proposed Mixed Development (Miri Waterfront Transformation) at Miri
Waterfront, Miri Division

10.30 AM

Site inspection at Farmrite Sdn Bhd. (Pig Farm). This inspection is conducted
due to complaints received from Jabatan Alam Sekitar. The inspection was
assisted by Mdm Jessica Dubah, Miss Irrwannie, Mr Cassidy and Mr Kennedy
Nujong.

12.30 PM

Lunch

2.00 PM

Make report about inspection at Farmrite Sdn Bhd.

Thursday, 23 July 2015


Time
8.00 AM

Arrived at the workplace on time

Events

8.10 AM

Continue working on report about inspection at Farmrite Sdn. Bhd.

12.30 PM

Lunch

2.00 PM

Continue working on report about inspection at Farmrite Sdn. Bhd.

Friday, 24 July 2015


Time
8.00 AM

Events
Arrived at the workplace on time

9.00 AM

I went for weekly town inspection called Proactive with Mdm Jessica and
another intern, Joanna Johny. The inspection is necessary to monitor the
environment and to make sure that there is no open burning done around Miri
area.

11.00 AM

Start working on case study on Preliminary EIA for Demolition and


Restoration of Piasau Camp, Miri, Sarawak

12.00 PM

Lunch

2.00 PM

Continue working on case study on Preliminary EIA for Demolition and


Restoration of Piasau Camp, Miri, Sarawak

Monday, 27 July 2015


Time
8.00 AM
8.10 AM

Events
Arrived at the workplace on time
Start with new case study entitled Preliminary EIA for Demolition and
Restoration of Piasau Camp, Miri, Sarawak

12.30 PM

Lunch

2.00 PM

Continue with case study entitled Preliminary EIA for Demolition and
Restoration of Piasau Camp, Miri, Sarawak

Tuesday, 28 July 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue with case study entitled Preliminary EIA for Demolition and
Restoration of Piasau Camp, Miri, Sarawak

12.30 PM

Lunch

2.00 PM

Continue with case study entitled Preliminary EIA for Demolition and
Restoration of Piasau Camp, Miri, Sarawak

Wednesday, 29 July 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue with case study entitled Preliminary EIA for Demolition and
Restoration of Piasau Camp, Miri, Sarawak

12.30 PM

Lunch

2.00 PM

Continue with case study entitled Preliminary EIA for Demolition and
Restoration of Piasau Camp, Miri, Sarawak

Thursday, 30 July 2015


Time
7.00 AM

Events
Drive to Long Lama for Raya Aidilfitri Celebration and Officiating the
building of Long Lama Bridge

9.00 AM

Arrived at the Long Lama and the ceremony started as well. Tan Sri Adenan
Satem, Chief Minister of Sarawak gives speech about the project of Long
Lama Bridge (more details on report)

12.00 PM

Ceremony ended and drive back to Miri. Given rest for the day

Friday, 31 July 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue with case study entitled Preliminary EIA for Demolition and
Restoration of Piasau Camp, Miri, Sarawak

12.30 PM

Lunch

2.00 PM

Continue with case study entitled Preliminary EIA for Demolition and
Restoration of Piasau Camp, Miri, Sarawak

Monday, 3 August 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue with case study entitled Preliminary EIA for Demolition and
Restoration of Piasau Camp, Miri, Sarawak

12.30 PM

Lunch

2.00 PM

Continue with case study entitled Preliminary EIA for Demolition and
Restoration of Piasau Camp, Miri, Sarawak

Tuesday, 4 August 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Start on new case study called Environmental Impact Assessment (EIA) for
Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

12.30 PM

Lunch

2.00 PM

Continue with case study called Environmental Impact Assessment (EIA) for
Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

Wednesday, 5 August 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue with case study called Environmental Impact Assessment (EIA) for
Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

12.30 PM

Lunch

2.00 PM

Continue with case study called Environmental Impact Assessment (EIA) for
Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

Thursday, 6 August 2015 (Visitation trip to Zha Environmental Sdn Bhd)


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue working on case study entitled ___

11.00 AM

Visitation Zha Environment Sdn Bhd with Mr Joseph Uyo, Miss Sati anak
Bandat, Mr Kemri bin Punut, Mr Seman bin Haji Ali and two other interns
which is Karenza Peter and Corina Irish. This company gathers all used tyres
and to be sent to Kuching to be break down.

1.00 PM

Lunch

2.00 PM

Make report about visitation at Zha Environmental Sdn Bhd

Friday, 7 August 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Setting up the place for Raya Aidilfitri celebration

9.30 AM

Raya Aidilfitri celebration

2.00 PM

Continue to make report about visitation at ZHA Environmental Sdn Bhd

Monday, 10 August 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue with case study called Environmental Impact Assessment (EIA) for
Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

12.30 PM

Lunch

2.00 PM

Continue with case study called Environmental Impact Assessment (EIA) for
Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

Tuesday, 11 August 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue with case study called Environmental Impact Assessment (EIA) for
Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

12.30 PM

Lunch

2.00 PM

Continue with case study called Environmental Impact Assessment (EIA) for
Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

Wednesday, 12 August 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue with case study called Environmental Impact Assessment (EIA) for
Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

12.30 PM

Lunch

2.00 PM

Accompanying Mdm Jessica to give speech about Environmental Issues and


NREBs Part to Tackle The Issues at Parkcity Hotel, Miri.

Thursday, 13 August 2015


Time

Events

8.00 AM

Arrived at the workplace on time

8.10 AM

Continue with case study called Environmental Impact Assessment (EIA) for
Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

12.30 PM

Lunch

2.00 PM

Continue with case study called Environmental Impact Assessment (EIA) for
Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

Friday, 14 August 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue with case study called Environmental Impact Assessment (EIA) for
Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

12.30 PM

Lunch

2.00 PM

Continue with case study called Environmental Impact Assessment (EIA) for
Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

Monday, 17 August 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.05 AM

Start preparing for the arrival of lecturer

9.00 AM

Arrival of lecturer from Faculty of Science

11.00 AM

Continue working on case study called Environmental Impact Assessment


(EIA) for Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division,
Sarawak

12.30 PM

Lunch

2.00 PM

Continue working on case study called Environmental Impact Assessment


(EIA) for Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division,
Sarawak

Tuesday, 18 August 2015


Time
8.00 AM

Events
Arrived at the office on time

8.10 AM

Start working new case study called Environmental Monitoring Report:


Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II),
Miri Division, Sarawak, Malaysia

12.30 PM

Lunch

2.00 PM

Continue working on case study entitled Environmental Monitoring Report:


Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II),
Miri Division, Sarawak, Malaysia

Wednesday, 19 August 2015


Time
8.00 AM

Events
Arrived at the office on time

8.10 AM

Start working new case study called Environmental Monitoring Report:


Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II),
Miri Division, Sarawak, Malaysia

12.30 PM

Lunch

2.00 PM

Continue working on case study entitled Environmental Monitoring Report:


Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II),
Miri Division, Sarawak, Malaysia

Thursday, 20 August 2015


Time
8.00 AM

Events
Arrived at the office on time

9.00 AM

I went for Lambir Sanitary Landfill site search with Mr Joseph Uyo, Mr Kemri
bin Punut, and Miss Monisavily Ongan Gak. The site search involved other
departments such as LAKU, MCC, Land Survey and Majlis Daerah Subis.

12.30 PM

Lunch

2.00 PM

Make report regarding the Lambir Sanitary Landfill site search

Friday, 21 August 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue working on report regarding the Lambir Sanitary Landfill site search

11.45 AM

Lunch

2.15 PM

Continue working on case study entitled Environmental Monitoring Report:


Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II),
Miri Division, Sarawak, Malaysia

Monday, 24 August 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue working on case study entitled Environmental Monitoring Report:


Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II),
Miri Division, Sarawak, Malaysia

10.00 AM

Mr Joseph Uyo taught Miss Monisavily Ongan Gak and I about transferring
raw data regarding air pollution around Miri area. The software used are called
__
Lunch

12.30 PM
2.00 PM

Continue working on case study entitled Environmental Monitoring Report:


Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II),
Miri Division, Sarawak, Malaysia

Tuesday, 25 August 2015


Time
8.00 AM
8.10 AM

Events
Arrived at the workplace on time
Continue working on case study entitled Environmental Monitoring Report:
Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II),

Miri Division, Sarawak, Malaysia


12.30 PM

Lunch

2.00 PM

Continue working on case study entitled Environmental Monitoring Report:


Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II),
Miri Division, Sarawak, Malaysia

Wednesday, 26 August 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue working on case study entitled Environmental Monitoring Report:


Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II),
Miri Division, Sarawak, Malaysia

12.30 PM

Lunch

2.00 PM

Continue working on case study entitled Environmental Monitoring Report:


Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II),
Miri Division, Sarawak, Malaysia

Thursday, 27 August 2015


Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Continue working on case study entitled Environmental Monitoring Report:


Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II),
Miri Division, Sarawak, Malaysia

12.30 PM

Lunch

2.00 PM

Continue working on case study entitled Environmental Monitoring Report:


Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II),
Miri Division, Sarawak, Malaysia

Friday, 28 August 2015


Time

Events

8.00 AM

Arrived at the workplace on time

8.10 AM

Continue working on case study entitled Environmental Monitoring Report:


Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II),
Miri Division, Sarawak, Malaysia

12.30 PM

Lunch

2.00 PM

Continue working on case study entitled Environmental Monitoring Report:


Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II),
Miri Division, Sarawak, Malaysia

Monday, 31 August 2015 National Day


Tuesday, 1 September 2015
Time
8.00 AM

Events
Arrived at the workplace on time

8.10 AM

Start working final report

12.30 PM

Lunch

2.00 PM

Continue working on final report

Wednesday, 2 September 2015


Time
8.00 AM

Arrived at the workplace on time

Events

8.10 AM

Start working final report

12.30 PM

Lunch

2.00 PM

Continue working on final report

Thursday, 3 September 2015


Time
8.00 AM
9.00 AM

Events
Arrived at the workplace on time
I followed Mdm Radziah binti Yusuf, Miss Monisavily Ongan Gak and Miss
Karenza Patrick to SK Agama for Pencinta Alam Sekitar Clubs annual report
and meeting headmaster/teachers in charge for the club.

10.30 AM

I followed Mdm Radziah binti Yusuf, Miss Monisavily Ongan Gak and Miss
Karenza Patrick to SK Temenggung Datuk Muip for Pencinta Alam Sekitar
Clubs annual report and meeting headmaster/teachers in charge for the club.

12.30 PM

Lunch

2.30 PM

I followed Mdm Radziah binti Yusuf, Miss Monisavily Ongan Gak and Miss
Karenza Patrick to SM Sains for Pencinta Alam Sekitar Clubs annual report
and meeting headmaster/teachers in charge for the club.

Friday, 4 September 2015


Time
8.00 AM

Events
Arrived at the workplace on time

9.00 AM

I followed Mdm Radziah binti Yusuf, Miss Joanna Johny and Miss Corina Irish
Jennis to SMK Lopeng Tengah for Pencinta Alam Sekitar Clubs annual report
and meeting headmaster/teachers in charge for the club.

10.30 AM

I followed Mdm Radziah binti Yusuf, Miss Joanna Johny and Miss Corina Irish
Jennis to Kolej Tun Datu Tuanku Haji Bujang for Pencinta Alam Sekitar
Clubs annual report and meeting headmaster/teachers in charge for the club.

12.00 PM

Lunch

2.30 PM

I followed Mdm Radziah binti Yusuf, Miss Joanna Johny and Miss Corina Irish
Jennis to SMK Riam for Pencinta Alam Sekitar Clubs annual report and
meeting headmaster/teachers in charge for the club.

Вам также может понравиться