Вы находитесь на странице: 1из 2

Federal Register / Vol. 72, No.

25 / Wednesday, February 7, 2007 / Notices 5695

Description: AEP Generating Co (866) 208–3676 (toll free). For TTY, call Applicants: Buena Vista Energy, LLC.
submits an Application, Under Section (202) 502–8659. Description: Buena Vista Energy, LLC
204 of the Federal Power Act, for notification of non-material change in
Magalie R. Salas,
Authorization to Issue Securities. status.
Secretary. Filed Date: 01/29/2007.
Filed Date: 1/26/2007. [FR Doc. E7–1906 Filed 2–6–07; 8:45 am] Accession Number: 20070129–5047.
Accession Number: 20070126–5004. BILLING CODE 6717–01–P Comment Date: 5 p.m. Eastern Time
Comment Date: 5 p.m. Eastern Time on Tuesday, February 20, 2007.
on Friday, February 16, 2007. Docket Numbers: ER07–474–000.
DEPARTMENT OF ENERGY Applicants: New York Independent
Any person desiring to intervene or to
protest in any of the above proceedings Federal Energy Regulatory System Operator., Inc.
Commission Description: New York Independent
must file in accordance with Rules 211
System Operator, Inc submits proposed
and 214 of the Commission’s Rules of
Combined Notice of Filings #1 revisions to its Market Administration
Practice and Procedure (18 CFR 385.211
and Control Area Services Tariff and its
and 385.214) on or before 5 p.m. Eastern January 31, 2007. OATT.
time on the specified comment date. It Take notice that the Commission Filed Date: 01/29/2007.
is not necessary to separately intervene received the following exempt Accession Number: 20070131–0016.
again in a subdocket related to a wholesale generator filings: Comment Date: 5 p.m. Eastern Time
compliance filing if you have previously Docket Numbers: EG07–35–000. on Tuesday, February 20, 2007.
intervened in the same docket. Protests Applicants: Dillon Wind LLC. Docket Numbers: ER07–475–000.
will be considered by the Commission Description: Dillon Wind LLC submits Applicants: California Independent
in determining the appropriate action to its notice of Self-Certification of Exempt System Operator Corporation.
be taken, but will not serve to make Wholesale Generator Status. Description: California Independent
protestants parties to the proceeding. Filed Date: 01/26/2007. System Operator Corp submits its long-
Anyone filing a motion to intervene or Accession Number: 20070130–0259. term transmission rights.
protest must serve a copy of that Comment Date: 5 p.m. Eastern Time Filed Date: 01/29/2007.
document on the Applicant. In reference on Friday, February 16, 2007. Accession Number: 20070131–0018.
to filings initiating a new proceeding, Take notice that the Commission Comment Date: 5 p.m. Eastern Time
interventions or protests submitted on received the following electric rate on Tuesday, February 20, 2007.
or before the comment deadline need filings: Docket Numbers: ER07–480–000.
not be served on persons other than the Docket Numbers: ER02–2339–002. Applicants: MidAmerican Energy
Applicants: Citadel Energy Products Company.
Applicant.
LLC. Description: MidAmerican Energy Co
The Commission encourages Description: Citadel Energy Products
electronic submission of protests and submits an amended Network
LLC submits an amendment to its 7/28/ Integration Transmission Service
interventions in lieu of paper, using the 05 updated market power analysis Agreement and an amended Network
FERC Online links at http:// filing. Operating Agreement with the City of
www.ferc.gov. To facilitate electronic Filed Date: 01/26/2007. Geneseo, IL updated 1/16/07.
service, persons with Internet access Accession Number: 20070130–0077. Filed Date: 01/30/2007.
who will eFile a document and/or be Comment Date: 5 p.m. Eastern Time Accession Number: 20070131–0028.
listed as a contact for an intervenor on Friday, February 16, 2007. Comment Date: 5 p.m. Eastern Time
must create and validate an Docket Numbers: ER07–113–001. on Tuesday, February 20, 2007.
eRegistration account using the Applicants: Midwest Independent Any person desiring to intervene or to
eRegistration link. Select the eFiling Transmission System Operator, Inc. protest in any of the above proceedings
link to log on and submit the Description: Midwest ISO et al. must file in accordance with Rules 211
intervention or protests. submits proposed revisions to its Open and 214 of the Commission’s Rules of
Persons unable to file electronically Access Transmission and Energy Practice and Procedure (18 CFR 385.211
should submit an original and 14 copies Markets Tariff etc. and 385.214) on or before 5 p.m. Eastern
of the intervention or protest to the Filed Date: 01/29/2007. time on the specified comment date. It
Federal Energy Regulatory Commission, Accession Number: 20070131–0017. is not necessary to separately intervene
Comment Date: 5 p.m. Eastern Time again in a subdocket related to a
888 First St., NE., Washington, DC
on Tuesday, February 20, 2007. compliance filing if you have previously
20426.
Docket Numbers: ER07–343–001. intervened in the same docket. Protests
The filings in the above proceedings Applicants: Alcoa Power Generating will be considered by the Commission
are accessible in the Commission’s Inc. in determining the appropriate action to
eLibrary system by clicking on the Description: Alcoa Power Generating be taken, but will not serve to make
appropriate link in the above list. They Inc (APGI) on behalf of its Tapoco protestants parties to the proceeding.
are also available for review in the Division submits an amendment to the Anyone filing a motion to intervene or
Commission’s Public Reference Room in revised tariff sheets submitted on 12/20/ protest must serve a copy of that
Washington, DC. There is an 06 to Electric Rate Schedules Nos. 4, 5, document on the Applicant. In reference
eSubscription link on the web site that and 6, which is redesignated as APGI to filings initiating a new proceeding,
enables subscribers to receive e-mail Rate Schedule No. 17. interventions or protests submitted on
sroberts on PROD1PC70 with NOTICES

notification when a document is added Filed Date: 01/26/2007. or before the comment deadline need
to a subscribed dockets(s). For Accession Number: 20070130–0258. not be served on persons other than the
assistance with any FERC Online Comment Date: 5 p.m. Eastern Time Applicant.
service, please e-mail on Friday, February 16, 2007. The Commission encourages
FERCOnlineSupport@ferc.gov. or call Docket Numbers: ER07–374–001. electronic submission of protests and

VerDate Aug<31>2005 21:36 Feb 06, 2007 Jkt 211001 PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 E:\FR\FM\07FEN1.SGM 07FEN1
5696 Federal Register / Vol. 72, No. 25 / Wednesday, February 7, 2007 / Notices

interventions in lieu of paper, using the Project, located on Lake Elsinore and Telephone Company, P.O. Box 3222,
FERC Online links at http:// San Juan Creek, in the Town of Lake 193 Otto Street, Port Townsend, WA
www.ferc.gov. To facilitate electronic Elsinore, Riverside County, California. 98368; telephone: (360) 385–1733, fax:
service, persons with Internet access In the final EIS, Commission staff (360) 385–5177; e-mail:
who will eFile a document and/or be evaluated the co-applicant’s proposal glen.m@aptalaska.com.
listed as a contact for an intervenor and the alternatives for licensing the i. FERC Contact: Any questions on
must create and validate an proposed project. The final EIS this notice should be addressed to
eRegistration account using the documents the views of governmental Henry Ecton, (202) 502–8768, or E-mail
eRegistration link. Select the eFiling agencies, non-governmental address: henry.ecton@ferc.gov.
link to log on and submit the organizations, affected Indian tribes, the j. Deadline for filing comments,
intervention or protests. public, the license applicants, and protests, and/or motions: March 2, 2007.
Persons unable to file electronically Commission staff. All documents (original and eight
should submit an original and 14 copies Copies are available for review in copies) should be filed with: Magalie R.
of the intervention or protest to the Public Reference Room 2–A of the Salas, Secretary, Federal Energy
Federal Energy Regulatory Commission, Commission’s offices at 888 First Street, Regulatory Commission, 888 First
888 First St., NE., Washington, DC NE., Washington, DC. The EIS also may Street, NE., Washington, D.C. 20426.
20426. be viewed on the Commission’s Internet Comments, protests, and/or
The filings in the above proceedings Web site (http://www.ferc.gov) using the interventions may be filed electronically
are accessible in the Commission’s ‘‘eLibrary’’ link. Additional information via the Internet in lieu of paper. Any
eLibrary system by clicking on the about the project is available from the questions, please contact the Secretary’s
appropriate link in the above list. They Commission’s Office of External Affairs Office. See, 18 CFR 385.2001(a)(1)(iii)
are also available for review in the at (202) 502–6088, or on the and the instructions on the
Commission’s Public Reference Room in Commission’s Web site using the Commission’s web site at http://
Washington, DC. There is an eLibrary link. For assistance with www.ferc.gov.
eSubscription link on the Web site that eLibrary, contact Please include the docket number
enables subscribers to receive e-mail FERCOnlineSupport@ferc.gov. or call (DI07–2–000) on any comments,
toll-free at (866) 208–3676; for TTY protests, and/or motions filed.
notification when a document is added
k. Description of Project: The
to a subscribed dockets(s). For contact (202) 502–8659.
proposed Yerrick Creek Hydro Project
assistance with any FERC Online would include: (1) A small diversion
Magalie R. Salas,
service, please e-mail structure, with a sipon-type intake; (2)
Secretary.
FERCOnlineSupport@ferc.gov. or call a 36-inch-diameter, 11,000-foot-long
(866) 208–3676 (toll free). For TTY, call [FR Doc. E7–1910 Filed 2–6–07; 8:45 am]
BILLING CODE 6717–01–P
penstock; (3) a powerhouse containing a
(202) 502–8659. 1.5-MW Pelton-type turbine; (4) a 1.15-
Magalie R. Salas, mile-long transmission line, connected
Secretary. DEPARTMENT OF ENERGY to an existing power grid; and (5)
[FR Doc. E7–1924 Filed 2–6–07; 8:45 am] appurtenant facilities. The project will
BILLING CODE 6717–01–P
Federal Energy Regulatory not occupy any tribal or federal lands.
Commission When a Declaration of Intention is
filed with the Federal Energy Regulatory
DEPARTMENT OF ENERGY Notice of Declaration of Intention and Commission, the Federal Power Act
Soliciting Comments, Protests, and/or requires the Commission to investigate
Federal Energy Regulatory Motions to Intervene and determine if the interests of
Commission January 30, 2007.
interstate or foreign commerce would be
Take notice that the following affected by the project. The Commission
[Project No. 11858–002]
application has been filed with the also determines whether or not the
Elsinore Municipal Water District and Commission and is available for public project: (1) Would be located on a
the Nevada Hydro Company, Inc, CA; inspection: navigable waterway; (2) would occupy
Notice of Availability of the Final a. Application Type: Declaration of or affect public lands or reservations of
Environmental Impact Statement for Intention. the United States; (3) would utilize
the Proposed Lake Elsinore Advanced b. Docket No: DI07–2–000. surplus water or water power from a
Pumped Storage Project c. Date Filed: January 16, 2007. government dam; or (4) if applicable,
d. Applicant: Alaska Power & has involved or would involve any
January 30, 2007. Telephone Company. construction subsequent to 1935 that
The staff of the Federal Energy e. Name of Project: Yerrick Creek may have increased or would increase
Regulatory Commission (FERC or Hydro Project. the project’s head or generating
Commission) has prepared the final f. Location: The proposed Yerrick capacity, or have otherwise significantly
Environmental Impact Statement (EIS) Creek Hydro Project will be located on modified the project’s pre-1935 design
Lake Elsinore Advanced Pumped Yerrick Creek, tributary to the Tanana or operation.
Storage Project in the above-referenced River, near the town of Tok, Alaska, l. Locations of the Application: Copies
docket. affecting T. 18 N., R. 9 E, secs. 1, 2, 11, of this filing are on file with the
The final EIS was prepared to satisfy 14; T. 18 N, R. 10 E, sec. 6; and T. 19 Commission and are available for public
the requirements of the National N, R. 9 E, sec. 36, Copper River inspection. This filing may be viewed
Environmental Policy Act of 1969, as Meridian. on the Web at http://www.ferc.gov using
sroberts on PROD1PC70 with NOTICES

amended, and the FERC regulations, 18 g. Filed Pursuant to: section 23(b)(1) the ‘‘eLibrary’’ link, select ‘‘Docket#’’
CFR Part 380. The Office of Energy of the Federal Power Act, 16 U.S.C. and follow the instructions. For
Projects has reviewed the application 817(b). assistance, please contact FERC Online
for license for the proposed Lake h. Applicant Contact: Glen D. Martin, Support at
Elsinore Advanced Pumped Storage Project Manager, Alaska Power & FERCOnlineSupport@ferc.gov or toll-

VerDate Aug<31>2005 21:36 Feb 06, 2007 Jkt 211001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 E:\FR\FM\07FEN1.SGM 07FEN1

Вам также может понравиться