Вы находитесь на странице: 1из 3

4300 Federal Register / Vol. 72, No.

19 / Tuesday, January 30, 2007 / Notices

and 203 of the Trade Act of 2002 and Agency: National Endowment for the NUCLEAR REGULATORY
20 CFR 671.140. Arts. COMMISSION
Ira L. Mills, Title: Big Read Program Evaluation. [Docket No. 50–261]
Departmental Clearance Officer/Team OMB Number: New.
Leader. Carolina Power and Light; Notice of
Frequency: One Time. Consideration of Issuance of
[FR Doc. E7–1388 Filed 1–29–07; 8:45 am]
BILLING CODE 4510–30–P
Affected Public: Individuals. Amendment to Facility Operating
Estimated Number of Respondents: License, Proposed No Significant
14,120. Hazards Consideration Determination,
and Opportunity for a Hearing
NATIONAL FOUNDATION ON THE Estimated Time Per Respondent: 8
ARTS AND THE HUMANITIES minutes. The U.S. Nuclear Regulatory
Total Burden Hours: 1,883. Commission (the Commission) is
National Endowment for the Arts; considering issuance of an amendment
Submission for OMB Review: Total Annualized Capital/Startup to Renewed Facility Operating License
Comment Request Costs: 0. No. DPR–23 issued to Carolina Power
The National Endowment for the Arts Total Annual Costs (Operating/ and Light (the licensee) for operation of
(NEA) has submitted the following Maintaining Systems or Purchasing the H. B. Robinson Steam Electric Plant
public information collection request Services): 0. (HBRSEP), Unit No. 2 located in
(ICR) to the Office of Management and Description: The National Endowment Darlington County, South Carolina.
Budget (OMB) for review and approval for the Arts plans to conduct an The proposed amendment would
in accordance with the Paperwork evaluation to assess the Big Read modify Technical Specification (TS)
Reduction Act of 1995 [P.L. 104–13, 44 program at the national level. The Big 5.5.9 to add steam generator (SG)
U.S.C. Chapter 35]. Copies of this ICR, Read is an initiative of the National alternate repair criteria and TS 5.6.8 to
with applicable supporting Endowment for the Arts (NEA), in add additional SG reporting
documentation, may be obtained by partnership with the Institute of requirements.
Before issuance of the proposed
contacting Sunil Iyengar via telephone Museum and Library Services (IMLS)
license amendment, the Commission
at 202–682–5424 (this is not a toll-free and in cooperation with Arts Midwest,
will have made findings required by the
number) or e-mail at designed to revitalize the role of
Atomic Energy Act of 1954, as amended
research@arts.endow.gov. Individuals literature in American popular culture
(the Act), and the Commission’s
who use a telecommunications device by providing citizens with the
regulations.
for the deaf (TTY/TDD) may call 202– opportunity to read and discuss a single The Commission has made a
682–5496 between 10 a.m. and 4 p.m. book of fiction within their proposed determination that the
Eastern time, Monday through Friday. communities. The evaluation is aimed amendment request involves no
Comments should be sent to the at assessing the design of the 2007–08 significant hazards consideration. Under
Office of Information and Regulatory Big Read program and to assess the the Commission’s regulations in Title 10
Affairs, Attn: OMB Desk Officer for the program’s impact on literary reading of the CODE OF FEDERAL
National Endowment for the Arts, Office habits in participating communities. REGULATIONS (10 CFR), Section 50.92,
of Management and Budget, Room The activities include collecting this means that operation of the facility
10235, Washington, DC 20503 202–395– uniform data from all sites, coordinating in accordance with the proposed
7316, within 30 days from the date of local and national data collection—and amendment would not (1) Involve a
this publication in the Federal Register. still keep data collection burdens to a significant increase in the probability or
The Office of Management and Budget minimum. consequences of an accident previously
(OMB) is particularly interested in As a national study, the Big Read evaluated; or (2) create the possibility of
comments which: Evaluation will serve as a sound base a new or different kind of accident from
• Evaluate whether the proposed from which to make estimates of the any accident previously evaluated; or
collection of information is necessary impact of the initiatives on partnering (3) involve a significant reduction in a
for the proper performance of the organizations, communities, and margin of safety. As required by 10 CFR
functions of the agency, including individuals. The Big Read evaluation 50.91(a), the licensee has provided its
whether the information will have data will also provide information on analysis of the issue of no significant
practical utility; the characteristics of those who hazards consideration, which is
• Evaluate the accuracy of the participate in the initiative and the presented below:
agency’s estimate of the burden of the degree to which the initiative is
proposed collection of information 1. The Proposed Change Does Not Involve
reaching previously under-represented a Significant Increase in the Probability or
including the validity of the groups. Consequences of an Accident Previously
methodology and assumptions used; Evaluated.
• Enhance the quality, utility, and ADDRESSES: Sunil Iyengar, National The proposed change does not involve
clarity of the information to be Endowment for the Arts, 1100 physical changes to any plant structure,
collected; and Pennsylvania Avenue, NW., Room 616, system, or component. The inspection of the
• Minimize the burden of the Washington, DC 20506–0001, telephone portion of the steam generator tubes within
collection of information on those who (202) 682–5424 (this is not a toll-free the tubesheet region is being changed to
are to respond, including through the number), fax 202/682–5677. identify the appropriate scope of inspection
use of appropriate automated, and the criteria for plugging tubes that are
ycherry on PROD1PC64 with NOTICES

Murray Welsh, found with degradation. The proposed


electronic, mechanical, or other requirements will continue to ensure that the
technological collection techniques, or Director, Administrative Services, National
probability of a steam generator tube rupture
other forms of information technology, Endowment for the Arts.
accident is not increased. Therefore, the
e.g., permitting electronic submissions [FR Doc. E7–1391 Filed 1–29–07; 8:45 am] probability of occurrence for a previously
of responses. BILLING CODE 7537–01–P analyzed accident is not significantly

VerDate Aug<31>2005 15:36 Jan 29, 2007 Jkt 211001 PO 00000 Frm 00070 Fmt 4703 Sfmt 4703 E:\FR\FM\30JAN1.SGM 30JAN1
Federal Register / Vol. 72, No. 19 / Tuesday, January 30, 2007 / Notices 4301

increased. The consequences of a previously The Commission is seeking public filed in accordance with the
analyzed accident are dependent on the comments on this proposed Commission’s ‘‘Rules of Practice for
initial conditions assumed for the analysis, determination. Any comments received Domestic Licensing Proceedings’’ in 10
the behavior of the fission product barriers within 30 days after the date of CFR Part 2. Interested persons should
during the analyzed accident, the availability
and successful functioning of the equipment publication of this notice will be consult a current copy of 10 CFR 2.309,
assumed to operate in response to the considered in making any final which is available at the Commission’s
analyzed event, and the setpoints at which determination. PDR, located at One White Flint North,
these actions are initiated. The proposed Normally, the Commission will not Public File Area O1 F21, 11555
inspection and repair requirements will issue the amendment until the Rockville Pike (first floor), Rockville,
ensure that the plant continues to meet expiration of 60 days after the date of Maryland. Publicly available records
applicable design and safety analyses publication of this notice. The will be accessible from the Agencywide
acceptance criteria. The proposed change Commission may issue the license Documents Access and Management
does not affect the performance of any amendment before expiration of the 60- System’s (ADAMS) Public Electronic
equipment used to mitigate the consequences
day period provided that its final Reading Room on the Internet at the
of an analyzed accident. As a result, no
analysis assumptions are impacted and there determination is that the amendment NRC Web site, http://www.nrc.gov/
are no adverse effects on the factors that involves no significant hazards reading-rm/doc-collections/cfr/. If a
contribute to offsite or onsite dose as a result consideration. In addition, the request for a hearing or petition for
of an accident. The proposed change does not Commission may issue the amendment leave to intervene is filed by the above
affect setpoints that initiate protective or prior to the expiration of the 30-day date, the Commission or a presiding
mitigative actions. The proposed change comment period should circumstances officer designated by the Commission or
ensures that plant structures, systems, and change during the 30-day comment by the Chief Administrative Judge of the
components are maintained consistent with period such that failure to act in a Atomic Safety and Licensing Board
the safety analysis and licensing bases. Based
on this evaluation, there is no significant
timely way would result, for example, Panel, will rule on the request and/or
increase in the consequences of a previously in derating or shutdown of the facility. petition; and the Secretary or the Chief
analyzed accident. Therefore, this change Should the Commission take action Administrative Judge of the Atomic
does not involve a significant increase in the prior to the expiration of either the Safety and Licensing Board will issue a
probability or consequences of an accident comment period or the notice period, it notice of a hearing or an appropriate
previously evaluated. will publish in the Federal Register a order.
2. The Proposed Change Does Not Create notice of issuance. Should the As required by 10 CFR 2.309, a
the Possibility of a New or Different Kind of Commission make a final No Significant petition for leave to intervene shall set
Accident From Any Previously Evaluated. Hazards Consideration Determination, forth with particularity the interest of
The proposed change does not involve any
physical alteration of plant systems,
any hearing will take place after the petitioner in the proceeding, and
structures, or components. No new or issuance. The Commission expects that how that interest may be affected by the
different equipment is being installed. No the need to take this action will occur results of the proceeding. The petition
installed equipment is being operated in a very infrequently. should specifically explain the reasons
different manner. There is no change to the Written comments may be submitted why intervention should be permitted
parameters within which the plant is by mail to the Chief, Rulemaking, with particular reference to the
normally operated or in the setpoints that Directives and Editing Branch, Division following general requirements: (1) The
initiate protective or mitigative actions. The of Administrative Services, Office of name, address and telephone number of
proposed inspection and repair criteria will Administration, U.S. Nuclear Regulatory the requestor or petitioner; (2) the
establish appropriate requirements to ensure Commission, Washington, DC 20555– nature of the requestor’s/petitioner’s
that the steam generator tubes are properly
maintained. As a result, no new failure
0001, and should cite the publication right under the Act to be made a party
modes are being introduced. Therefore, the date and page number of this Federal to the proceeding; (3) the nature and
proposed change does not create the Register notice. Written comments may extent of the requestor’s/petitioner’s
possibility of a new or different kind of also be delivered to Room 6D59, Two property, financial, or other interest in
accident from any accident previously White Flint North, 11545 Rockville the proceeding; and (4) the possible
evaluated. Pike, Rockville, Maryland, from 7:30 effect of any decision or order which
3. The Proposed Change Does Not Involve a.m. to 4:15 p.m. Federal workdays. may be entered in the proceeding on the
a Significant Reduction in the Margin of Documents may be examined, and/or requestors/petitioner’s interest. The
Safety. copied for a fee, at the NRC’s Public petition must also identify the specific
There is no impact on any margin of safety Document Room (PDR), located at One contentions which the petitioner/
resulting from the proposed steam generator
tube inspection and repair criteria. The
White Flint North, Public File Area O1 requestor seeks to have litigated at the
integrity of the steam generator tubes and F21, 11555 Rockville Pike (first floor), proceeding.
associated primary to secondary leakage Rockville, Maryland. Each contention must consist of a
criteria will be maintained consistent with The filing of requests for hearing and specific statement of the issue of law or
the applicable safety margins as established petitions for leave to intervene is fact to be raised or controverted. In
for HBRSEP, Unit No. 2, by use of the discussed below. addition, the petitioner/requestor shall
proposed steam generator alternate repair Within 60 days after the date of provide a brief explanation of the bases
criteria. Therefore, this change does not publication of this notice, the licensee for the contention and a concise
involve a significant reduction in the margin may file a request for a hearing with statement of the alleged facts or expert
of safety. respect to issuance of the amendment to opinion which support the contention
The NRC staff has reviewed the the subject facility operating license and and on which the petitioner intends to
licensee’s analysis and, based on this any person whose interest may be rely in proving the contention at the
review, it appears that the three affected by this proceeding and who hearing. The petitioner/requestor must
ycherry on PROD1PC64 with NOTICES

standards of 10 CFR 50.92(c) are wishes to participate as a party in the also provide references to those specific
satisfied. Therefore, the NRC staff proceeding must file a written request sources and documents of which the
proposes to determine that the for a hearing and a petition for leave to petitioner is aware and on which the
amendment request involves no intervene. Requests for a hearing and a petitioner intends to rely to establish
significant hazards consideration. petition for leave to intervene shall be those facts or expert opinion. The

VerDate Aug<31>2005 15:36 Jan 29, 2007 Jkt 211001 PO 00000 Frm 00071 Fmt 4703 Sfmt 4703 E:\FR\FM\30JAN1.SGM 30JAN1
4302 Federal Register / Vol. 72, No. 19 / Tuesday, January 30, 2007 / Notices

petition must include sufficient verification number is (301) 415–1966. Spent Fuel Storage Installation (ISFSI)
information to show that a genuine A copy of the request for hearing and License No. SFGL–16 for BRP currently
dispute exists with the applicant on a petition for leave to intervene should held by Consumers Energy Company
material issue of law or fact. also be sent to the Office of the General (Consumers). The transfer would be to
Contentions shall be limited to matters Counsel, U.S. Nuclear Regulatory Entergy Nuclear Palisades, LLC (Entergy
within the scope of the amendment Commission, Washington, DC 20555– Nuclear Palisades) to possess and own,
under consideration. The contention 0001, and it is requested that copies be and Entergy Nuclear Operations, Inc.
must be one which, if proven, would transmitted either by means of facsimile (ENO), to control and operate, the ISFSI.
entitle the petitioner to relief. A transmission to 301–415–3725 or by e- The Commission is also considering
petitioner/requestor who fails to satisfy mail to OGCMailCenter@nrc.gov. A copy amending the licenses for
these requirements with respect to at of the request for hearing and petition administrative purposes to reflect the
least one contention will not be for leave to intervene should also be proposed transfer.
permitted to participate as a party. sent to David T. Conley, Associate According to an application for
Those permitted to intervene become General Counsel II—Legal Department, approval filed by Consumers, Entergy
parties to the proceeding, subject to any Progress Energy Service Company, LLC, Nuclear Palisades, and ENO, Entergy
limitations in the order granting leave to Post Office Box 1551, Raleigh, North Nuclear Palisades would acquire
intervene, and have the opportunity to Carolina 27602, attorney for the ownership of the facility following
participate fully in the conduct of the licensee. approval of the proposed license
hearing. For further details with respect to this transfer, and ENO would control and
If a hearing is requested, the action, see the application for operate ISFSI. No physical change to the
Commission will make a final amendment dated January 19, 2007, BRP facility or operational changes are
determination on the issue of no which is available for public inspection being proposed in the application.
significant hazards consideration. The at the Commission’s PDR, located at The proposed amendment would
final determination will serve to decide One White Flint North, File Public Area replace references to Consumers in the
when the hearing is held. If the final O1 F21, 11555 Rockville Pike (first license with references to Entergy
determination is that the amendment floor), Rockville, Maryland. Publicly Nuclear Palisades and ENO to reflect the
request involves no significant hazards available records will be accessible from proposed transfer.
consideration, the Commission may Pursuant to 10 CFR 50.80 and 10 CFR
the Agencywide Documents Access and
issue the amendment and make it 72.50, no license, or any right
Management System’s (ADAMS) Public
immediately effective, notwithstanding thereunder, shall be transferred, directly
Electronic Reading Room on the Internet
the request for a hearing. Any hearing or indirectly, through transfer of control
at the NRC Web site, http://
held would take place after issuance of of any license unless the Commission
www.nrc.gov/reading-rm/adams.html.
the amendment. If the final shall give its consent in writing. The
Persons who do not have access to
determination is that the amendment Commission will approve an
ADAMS or who encounter problems in
request involves a significant hazards application for the transfer of a license,
accessing the documents located in if the Commission determines that the
consideration, any hearing held would
ADAMS, should contact the NRC PDR proposed transferee is qualified to hold
take place before the issuance of any
Reference staff by telephone at 1–800– the license, and that the transfer is
amendment.
Nontimely requests and/or petitions 397–4209, 301–415–4737, or by e-mail otherwise consistent with applicable
and contentions will not be entertained to pdr@nrc.gov. provisions of law, regulations, and
absent a determination by the Dated at Rockville, Maryland, this 23rd day orders issued by the Commission
Commission or the presiding officer of of January 2007. pursuant thereto.
the Atomic Safety and Licensing Board For the Nuclear Regulatory Commission. Before issuance of the proposed
that the petition, request and/or the Chandu P. Patel, conforming license amendment, the
contentions should be granted based on Project Manager, Plant Licensing Branch II– Commission will have made findings
a balancing of the factors specified in 10 2, Division of Operating Reactor Licensing, required by the Atomic Energy Act of
CFR 2.309(c)(1)(i)–(viii). Office of Nuclear Reactor Regulation. 1954, as amended (the Act), and the
A request for a hearing or a petition [FR Doc. E7–1417 Filed 1–29–07; 8:45 am] Commission’s regulations.
for leave to intervene must be filed by: BILLING CODE 7590–01–P
As provided in 10 CFR 2.1315, unless
(1) First class mail addressed to the otherwise determined by the
Office of the Secretary of the Commission with regard to a specific
Commission, U.S. Nuclear Regulatory NUCLEAR REGULATORY application, the Commission has
Commission, Washington, DC 20555– COMMISSION determined that any amendment to the
0001, Attention: Rulemaking and license of a utilization facility or to the
Adjudications Staff; (2) courier, express [Dockets No. 50–155 and 72–043] license of an ISFSI which does no more
mail, and expedited delivery services: Consumers Energy Company Big Rock than conform the license to reflect the
Office of the Secretary, Sixteenth Floor, Point Plant; Notice of Consideration of transfer action involves no significant
One White Flint North, 11555 Rockville Approval of Transfer of Facility hazards consideration and no genuine
Pike, Rockville, Maryland, 20852, Operating License and Conforming issue as to whether the health and safety
Attention: Rulemaking and Amendment and Opportunity for a of the public will be significantly
Adjudications Staff; (3) E-mail Hearing affected. No contrary determination has
addressed to the Office of the Secretary, been made with respect to this specific
U.S. Nuclear Regulatory Commission, The U.S. Nuclear Regulatory license amendment application. In light
hearingdocket@nrc.gov; or (4) facsimile Commission (the Commission) is of the generic determination reflected in
ycherry on PROD1PC64 with NOTICES

transmission addressed to the Office of considering the issuance of an order 10 CFR 2.1315, no public comments
the Secretary, U.S. Nuclear Regulatory under 10 CFR 50.80 and 10 CFR 72.50 with respect to significant hazards
Commission, Washington, DC, approving the transfer of Facility considerations are being solicited,
Attention: Rulemakings and Operating License No. DPR–6 for Big notwithstanding the general comment
Adjudications Staff at (301) 415–1101, Rock Point (BRP) Plant and Independent procedures contained in 10 CFR 50.91.

VerDate Aug<31>2005 15:36 Jan 29, 2007 Jkt 211001 PO 00000 Frm 00072 Fmt 4703 Sfmt 4703 E:\FR\FM\30JAN1.SGM 30JAN1

Вам также может понравиться