78186 Federal Register / Vol. 71, No.

249 / Thursday, December 28, 2006 / Notices

filing comments, it will be presumed to for the project. Further, if an intervenor Commission’s Rules may become a
have no comments. One copy of an files comments or documents with the party to the proceeding. Any comments,
agency’s comments must also be sent to Commission relating to the merits of an protests, or motions to intervene must
the Applicant’s representatives. issue that may affect the responsibilities be received on or before the specified
of a particular resource agency, they comment date for the particular
Magalie R. Salas,
must also serve a copy of the document application.
Secretary. on that resource agency. q. Filing and Service of Responsive
[FR Doc. E6–22229 Filed 12–27–06; 8:45 am] k. Competing Application: Project No. Documents: Any filings must bear in all
BILLING CODE 6717–01–P 12727–000, Date Filed: August 17, 2006, capital letters the title ‘‘COMMENTS’’,
Date Issued: October 11, 2006, Due Date: ‘‘PROTEST’’, or ‘‘MOTION TO
December 11, 2006. INTERVENE’’, as applicable, and the
DEPARTMENT OF ENERGY l. Description of Project: The proposed Project Number of the particular
project would consist of: (1) 200 to 400 application to which the filing refers.
Federal Energy Regulatory Power Buoys having a total installed Any of the above-named documents
Commission capacity of 100 megawatts, (2) a must be filed by providing the original
proposed 13.8 kilovolt transmission and the number of copies provided by
Notice of Application Accepted for
line, and (3) appurtenant facilities. The the Commission’s regulations to: The
Filing and Soliciting Comments,
project is estimated to have an annual Secretary, Federal Energy Regulatory
Motions To Intervene, and Protests generation of 306.6 gigawatt-hours per- Commission, 888 First Street, NE.,
December 20, 2006. unit per-year, which would be sold to a Washington, DC 20426. An additional
Take notice that the following local utility. copy must be sent to Director, Division
hydroelectric application has been filed m. Locations of Applications: A copy of Hydropower Administration and
with the Commission and is available of the application is available for Compliance, Federal Energy Regulatory
for public inspection: inspection and reproduction at the Commission, at the above-mentioned
a. Type of Application: Preliminary Commission in the Public Reference address. A copy of any notice of intent,
Permit. Room, located at 888 First Street NE., competing application or motion to
b. Project No: 12750–000. Room 2A, Washington DC 20426, or by intervene must also be served upon each
c. Date Filed: November 2, 2006. calling (202) 502–8371. This filing may representative of the Applicant
d. Applicant: Oregon Wave Energy also be viewed on the Commission’s specified in the particular application.
Partners, LLC. Web site at http://www.ferc.gov using Comments, protests and interventions
e. Name of Project: Newport OPT the ‘‘eLibrary’’ link. Enter the docket may be filed electronically via the
Wave Park Project. number excluding the last three digits in Internet in lieu of paper; see 18 CFR
f. Location: The proposed tidal project the docket number field to access the 385.2001(a)(1)(iii) and the instructions
would be located in the Pacific Ocean document. For assistance, call toll-free on the Commission’s Web site under the
about 3 to 6 miles off shore in Lincoln 1–866–208–3676 or e-mail
‘‘e-Filing’’ link. The Commission
County, Oregon. FERCOnlineSupport@ferc.gov. For TTY,
strongly encourages electronic filings.
g. Filed Pursuant to: Federal Power call (202) 502–8659. A copy is also r. Agency Comments: Federal, State,
Act, 16 U.S.C. 791(a)-825(r). available for inspection and and local agencies are invited to file
h. Applicant Contacts: Charles F. reproduction at the address in item h. comments on the described application.
Dunleavy, Oregon Wave Energy above. A copy of the application may be
Partners, LLC, 1590 Reed Road, n. Individuals desiring to be included
obtained by agencies directly from the
Pennington, NJ 08534, phone: (609)- on the Commission(s mailing list should
Applicant. If an agency does not file
730–0400. so indicate by writing to the Secretary
comments within the time specified for
i. FERC Contact: Mr. Robert Bell, of the Commission.
o. Proposed Scope of Studies under filing comments, it will be presumed to
(202) 502–6062.
j. Deadline for filing motions to Permit: A preliminary permit, if issued, have no comments. One copy of an
intervene, protests and comments: 60 does not authorize construction. The agency’s comments must also be sent to
days from the issuance date of this term of the proposed preliminary permit the Applicant’s representatives.
notice. would be 36 months. The work Magalie R. Salas,
All documents (original and eight proposed under the preliminary permit Secretary.
copies) should be filed with: Magalie R. would include economic analysis, [FR Doc. E6–22230 Filed 12–27–06; 8:45 am]
Salas, Secretary, Federal Energy preparation of preliminary engineering BILLING CODE 6717–01–P
Regulatory Commission, 888 First plans, and a study of environmental
Street, NE., Washington, DC 20426. impacts. Based on the results of these
Comments, protests, and interventions studies, the Applicant would decide DEPARTMENT OF ENERGY
may be filed electronically via the whether to proceed with the preparation
Internet in lieu of paper; see 18 CFR of a development application to Federal Energy Regulatory
385.2001(a)(1)(iii) and the instructions construct and operate the project. Commission
on the Commission’s Web site under the p. Comments, Protests, or Motions to
[Project No. 2301–022]
‘‘e-Filing’’ link. The Commission Intervene: Anyone may submit
strongly encourages electronic filings. comments, a protest, or a motion to PPL Montana; Notice of
Please include the project number (P– intervene in accordance with the Teleconference to Discuss Additional
12750–000) on any comments or requirements of Rules of Practice and Information Needs for the Mystic Lake
motions filed. Procedure, 18 CFR 385.210, 385.211,
sroberts on PROD1PC70 with NOTICES

Hydroelectric Project
The Commission’s Rules of Practice 385.214. In determining the appropriate
and Procedure require all intervenors action to take, the Commission will December 20, 2006.
filing documents with the Commission consider all protests or other comments a. Date and Time of Teleconference:
to serve a copy of that document on filed, but only those who file a motion January 8, 2007; 9 a.m. MST (11 a.m.
each person in the official service list to intervene in accordance with the EST).

VerDate Aug<31>2005 20:03 Dec 27, 2006 Jkt 211001 PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 E:\FR\FM\28DEN1.SGM 28DEN1
Federal Register / Vol. 71, No. 249 / Thursday, December 28, 2006 / Notices 78187

b. Teleconference Call: Call-in 2106 with the required connection with the proposed rate
procedures and an agenda will be accommodations. schedule. On August 10, 2006,
posted to the Commission’s Web site For additional information, please Southwestern published notice in the
soon at: http://www.ferc.gov/ contact Tom Burgess at (202) 502–6058, Federal Register (71 FR 45820), of a 60-
EventCalendar/EventsList.aspx?Date=1/ thomas.burgess@ferc.gov or Lorna day comment period, together with a
6/2007&CalendarID=0. Hadlock at (202) 502–8737, combined Public Information and
c. FERC Contact: Steve Hocking at lorna.hadlock@ferc.gov. Comment Forum, to provide an
(202) 502–8753 or opportunity for customers and other
Magalie R. Salas,
steve.hocking@ferc.gov. interested members of the public to
Secretary. review and comment on a proposed rate
d. Purpose of Teleconference: PPL
Montana filed an application to [FR Doc. E6–22216 Filed 12–27–06; 8:45 am] increase for the Willis project. The
relicense the Mystic Lake Hydroelectric BILLING CODE 6717–01–P public forum was canceled when no one
Project on December 15, 2006. expressed an intention to participate.
Commission staff may include a Written comments were accepted
‘‘Wilderness Avoidance Alternative’’ in DEPARTMENT OF ENERGY through October 10, 2006. One comment
our NEPA analysis to analyze lowered was received from Gillis & Angley,
Southwestern Power Administration Counsellors at Law, on behalf of Sam
lake levels in both Mystic and West
Rosebud Lakes, if needed, to prevent Robert D. Willis Hydropower Rate Rayburn Municipal Power Agency and
these two lakes from encroaching upon Schedules the Vinton Public Power Authority,
the Absaroka-Beartooth Wilderness which stated that they had no objection
Area. This teleconference is to help AGENCY: Southwestern Power to the proposed rate adjustment.
Commission staff determine whether Administration, DOE. Information regarding this rate
any additional information is needed to ACTION: Notice of Rate Order. proposal, including studies and other
analyze a ‘‘Wilderness Avoidance supporting material, is available for
SUMMARY: Pursuant to Delegation Order public review and comment in the
Alternative’’ in our NEPA document.
Nos. 00–037.00, effective December 6, offices of Southwestern Power
Magalie R. Salas, 2001, and 00–001.00B, effective July 28, Administration, One West Third Street,
Secretary. 2005, the Deputy Secretary has Tulsa, Oklahoma 74103.
[FR Doc. E6–22228 Filed 12–27–06; 8:45 am] approved and placed into effect on an Following review of Southwestern’s
BILLING CODE 6717–01–P interim basis Rate Order No. SWPA–57, proposal within the Department of
which increases the power rate for the Energy, I approved Rate Order No.
Robert Douglas Willis Hydropower SWPA–57, on an interim basis, which
DEPARTMENT OF ENERGY Project (Willis) pursuant to the increases the existing Robert D. Willis
following Willis Rate Schedule: rate to $815,580, per year, for the period
Federal Energy Regulatory January 1, 2007, through September 30,
Rate Schedule RDW–06, Wholesale Rates
Commission for Hydro Power and Energy Sold to Sam 2010.
Rayburn Municipal Power Agency (Contract Dated: December 21, 2006.
[Docket No. RP06–614–000] No. DE–-PM75–85SW00117) Clay Sell,
The effective period for the rate schedule
specified in Rate Order No. SWPA–57 is Deputy Secretary.
Transwestern Pipeline Company, LLC;
Notice of Informal Settlement January 1, 2007, through September 30, 2010. United States of America Department of
Conference FOR FURTHER INFORMATION CONTACT: Mr. Energy, Deputy Secretary of Energy
December 19, 2006. Forrest E. Reeves, Assistant In the Matter of: Southwestern Power
Take notice that an informal Administrator, Office of Corporate Administration; Robert D. Willis
settlement conference will be convened Operations, Southwestern Power Hydropower Project Rate
in this proceeding commencing at 10 Administration, Department of Energy,
Rate Order No. SWPA–57
a.m. (EST) on Tuesday, January 9, 2007, One West Third Street, Tulsa, Oklahoma
at the offices of the Federal Energy 74103, (918) 595–6696, Order Confirming, Approving and
Regulatory Commission, 888 First gene.reeves@swpa.gov. Placing Increased Power Rate Schedule
Street, NE., Washington, DC 20426, for SUPPLEMENTARY INFORMATION: The in Effect on an Interim Basis
the purpose of exploring the possible existing hydroelectric power rate for the Pursuant to sections 302(a) and 301(b)
settlement of the above-referenced Robert Douglas Willis project is of the Department of Energy
docket. $648,096 per year. The Federal Energy Organization Act, Public Law 95–91, the
Any party, as defined by 18 CFR Regulatory Commission approved this functions of the Secretary of the Interior
385.102(c), or any participant as defined rate on a final basis on June 21, 2006, and the Federal Power Commission
by 18 CFR 385.102(b), is invited to for the period January 1, 2006, through under section 5 of the Flood Control Act
attend. Persons wishing to become a September 30, 2009. The 2006 Willis of 1944, 16 U.S.C. 825s, relating to the
party must move to intervene and Power Repayment Studies indicate the Southwestern Power Administration
receive intervenor status pursuant to the need for an increase in the annual rate (Southwestern) were transferred to and
Commission’s regulations (18 CFR by $167,484 or 25.8 percent beginning vested in the Secretary of Energy. By
385.214). January 1, 2007. Delegation Order No. 0204–108,
FERC conferences are accessible The Administrator, Southwestern effective December 14, 1983, the
under section 508 of the Rehabilitation Power Administration (Southwestern) Secretary of Energy delegated to the
sroberts on PROD1PC70 with NOTICES

Act of 1973. For accessibility has followed Title 10, Part 903 Subpart Administrator of Southwestern the
accommodations please send an e-mail A, of the Code of Federal Regulations, authority to develop power and
to accessibility@ferc.gov or call toll free ‘‘Procedures for Public Participation in transmission rates, delegated to the
1–866–208–3372 (voice) or 202–208– Power and Transmission Rate Deputy Secretary of the Department of
1659 (TTY), or send a FAX to 202–208– Adjustments and Extensions’’ in Energy the authority to confirm,