Вы находитесь на странице: 1из 2

75532 Federal Register / Vol. 71, No.

241 / Friday, December 15, 2006 / Notices

federal action significantly affecting the Energy Regulatory Commission, 888 formal issuances and submittals in
quality of the human environment. First St., NE., Room 1A, Washington, DC specific dockets. This can reduce the
The EA assesses the potential 20426; amount of time you spend researching
environmental effects of the • Label one copy of the comments for proceedings by automatically providing
construction and operation of the the attention of the Gas Branch 2, you with notification of these filings,
proposed Maritimes Phase IV Project: PJ11.2. document summaries and direct links to
• Reference Docket No. C06–335–000; the documents. Go to http://
New Construction in Maine
and www.ferc.gov/esubscribenow.htm.
• Approximately, 1.7 miles of 30- • Mail your comments so that they
inch-diameter pipeline in Washington will be received in Washington, DC on Magalie R. Salas,
County (Baileyville Loop); or before January 10, 2007. Secretary.
• Baileyville Meter Station in The Commission strongly encourages [FR Doc. E6–21418 Filed 12–14–06; 8:45 am]
Washington County; electronic filing of any comments or BILLING CODE 6717–01–P
• Woodchopping Ridge Compressor interventions or protests to this
Station (18,085 horsepower [HP]) in proceeding. See 18 CFR
Hancock County; 385.2001(a)(1)(iii) and the instructions DEPARTMENT OF ENERGY
• Brewer Compressor Station (18,085 on the Commission’s Web site at
HP) in Penobscot County; http://www.ferc.gov under the Federal Energy Regulatory
• Searsmont Compressor Station Commission
‘‘e-Filing’’ link and the link to the User’s
(18,085 HP) in Waldo County;
• Westbrook Compressor Station Guide. Before you can file comments [Project No. 2230–034]
(26,666 HP) in Cumberland County; you will need to create a free account
which can be created by clicking on City and Borough of Sitka, AK; Notice
• Westbrook Meter Station in
‘‘Sign-up.’’ Soliciting Comments and Final
Cumberland County; and
• Eliot Compressor Station (8,943 HP) Comments will be considered by the Recommendations, Terms and
in York County. Commission but will not serve to make Conditions, and Prescriptions
the commentor a party to the
Modifications in Maine December 8, 2006.
proceeding. Any person seeking to
Take notice that the following
• Piping at the existing Richmond become a party to the proceeding must
file a motion to intervene pursuant to hydroelectric application has been filed
Compressor Station in Sagadahoc
Rule 214 of the Commission’s Rules of with the Commission and is available
County;
• Piping at the existing Baileyville Practice and Procedures (18 CFR for public inspection.
385.214).1 Only intervenors have the a. Type of Application: New Major
Compressor Station in Washington
right to seek rehearing of the License.
County; and
• Piping at the existing Baileyville b. Project No.: 2230–034.
Commission’s decision.
Meter Station in Washington County. Affected landowners and parties with c. Date Filed: March 28, 2006.
d. Applicant: City and Borough of
environmental concerns may be granted
Modifications in Massachusetts Sitka, Alaska.
intervenor status upon showing good
• At the existing Dracut Meter Station e. Name of Project: Blue Lake
cause by stating that they have a clear
in Middlesex County. Hydroelectric Project.
and direct interest in this proceeding
The purpose of the proposed f. Location: On Sawmill Creek, 5
which would not be adequately
Maritimes Phase IV Project is to provide miles southeast of the City of Sitka,
represented by any other parties. You do
the necessary infrastructure to transport Alaska. The project occupies lands of
not need intervenor status to have your
natural gas from the Canaport LNG the United States; specifically 1628.1
comments considered.
terminal currently under construction in Additional information about the acres of the Tongass National Forest.
New Brunswick, Canada to markets in project is available from the g. Filed Pursuant to: Federal Power
the Northeastern U.S. The EA has been Commission’s Office of External Affairs, Act 16 U.S.C. 791 (a)–825(r).
placed in the public files of the FERC. h. Applicant Contact: Andy Eggen,
at 1–866–208–FERC or on the FERC
A limited number of copies of the EA Acting Utility Director, City and
Internet Web site (http://www.ferc.gov)
are available for distribution and public Borough of Sitka, 105 Jarvis Street,
using the eLibrary link. Click on the
inspection at: Federal Energy Regulatory Sitka, AK 99835, (907) 747–4000.
eLibrary link, click on ‘‘General Search’’
Commission, Public Reference Room, i. FERC Contact: Thomas Dean, (202)
and enter the docket number excluding
888 First Street, NE., Room 2A, 502–6041 or thomas.dean@ferc.gov.
the last three digits in the Docket
Washington, DC 20426, (202) 502–8371. j. Deadline for filing comments and
Number field. Be sure you have selected
Copies of the EA have been mailed to final recommendations, terms and
an appropriate date range. For
Federal, State and local agencies, public conditions, and prescriptions is 60 days
assistance, please contact FERC Online
interest groups, interested individuals, from the issuance of this notice; reply
Support at FercOnlineSupport@ferc.gov
newspapers, and parties to this comments are due 105 days from the
or toll free at 1–866–208–3676, or for
proceeding. issuance date of this notice.
TTY, contact (202) 502–8659. The
Any person wishing to comment on All documents (original and eight
eLibrary link also provides access to the
the EA may do so. To ensure copies) should be filed with: Magalie R.
texts of formal documents issued by the
consideration prior to a Commission Salas, Secretary, Federal Energy
Commission, such as orders, notices,
decision on the proposal, it is important Regulatory Commission, 888 First
and rulemakings.
that we receive your comments before In addition, the Commission now Street, NE., Washington, DC 20426.
mstockstill on PROD1PC61 with NOTICES

the date specified below. Please The Commission’s Rules of Practice


offers a free service called eSubscription
carefully follow these instructions to require all intervenors filing documents
which allows you to keep track of all
ensure that your comments are received with the Commission to serve a copy of
in time and properly recorded: 1 Interventions may also be filed electronically via that document on each person that is on
• Send an original and two copies of the Internet in lieu of paper. See the previous the official service list for the project.
your comments to: Secretary, Federal discussion on filing comments electronically. Further, if an intervenor files comments

VerDate Aug<31>2005 15:47 Dec 14, 2006 Jkt 211001 PO 00000 Frm 00058 Fmt 4703 Sfmt 4703 E:\FR\FM\15DEN1.SGM 15DEN1
Federal Register / Vol. 71, No. 241 / Friday, December 15, 2006 / Notices 75533

or documents with the Commission free at 1–866–208–3676, or for TTY, DEPARTMENT OF ENERGY
relating to the merits of an issue that (202) 502–8659. A copy is also available
may affect the responsibilities of a for inspection and reproduction at the Federal Energy Regulatory
particular resource agency, they must address in item h above. Commission
also serve a copy of the document on You may also register online at
that resource agency. Notice of Application for Non-Project
http://www.ferc.gov/docs-filing/ Use of Project Lands and Waters and
Comments, recommendations, terms esubscription.asp to be notified via e-
and conditions, and prescriptions may Soliciting Comments, Motions To
mail of new filings and issuances Intervene, and Protests
be filed electronically via the Internet in related to this or other pending projects.
lieu of paper. The Commission strongly For assistance, contact FERC Online December 11, 2006.
encourages electronic filing. See 18 CFR Support.
385.2001(a)(1)(iii) and the instructions Take notice that the following
on the Commission’s Web site (http:// n. Anyone may submit comments on application has been filed with the
www.ferc.gov) under the ‘‘eFiling’’ link. this application. In determining the Commission and is available for public
k. This application has been accepted appropriate action to take, the inspection:
for filing and is now ready for Commission will consider all comments a. Application Type: Non-Project Use
environmental analysis. filed. Comments must be received on or of Project Lands and Waters.
l. Description of Project: The existing before the specified deadline date. b. Project No: 2210–143.
Blue Lake Project consists of the c. Date filed: October 10, 2006.
All filings must: (1) bear in all capital
following : (1) A 211-foot-high, 256-foot- d. Applicant: Appalachian Power
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
long concrete arch dam equipped with Company.
COMMENTS,’’ e. Name of Project: Smith Mountain
a 140-foot-long spillway and a release ‘‘RECOMMENDATIONS,’’ ‘‘TERMS
valve at the base of the dam; (2) a 1,225- Pumped Storage Project.
AND CONDITIONS,’’ or f. Location: The project is located on
acre reservoir with a normal water ‘‘PRESCRIPTIONS;’’ (2) set forth in the
surface elevation of 342 feet msl; (3) a the Roanoke River, in Bedford,
heading the name of the applicant and Pittsylvania, Franklin, and Roanoke
7,110-foot-long power conduit the project number of the application to
consisting of: (a) An 11.5-foot-diameter, Counties, Virginia.
which the filing responds; (3) furnish g. Filed Pursuant to: Federal Power
1,500-foot-long penstock; (b) an 84-inch- the name, address, and telephone
diameter, 460-foot-long penstock; (c) a Act, 16 U.S.C. 791(a)–825(r) and § § 799
number of the agency or other and 801.
10-inch-diameter, 4,650-foot-long lower individual submitting the filing; and (4)
penstock; (d) an 84-inch-diameter, 500- h. Applicant Contact: Teresa P.
otherwise comply with the requirements Rogers, Hydro Generation Department,
foot-long penstock; (e) a 20-inch- of 18 CFR 385.2001 through 385.2005.
diameter water supply tap; (f) an 84- Appalachian Power, P.O. Box 2021,
All comments, recommendations, terms Roanoke, VA 24022–2121, (540) 985–
inch-diameter butterfly valve; and (g) a and conditions or prescriptions must set
24-inch conduit drain valve; (4) a 2441.
forth their evidentiary basis and i. FERC Contact: Brian Romanek at
powerhouse containing two 3,000 kW otherwise comply with the requirements
generating units; (5) a 150-foot-long 202–502–6175, or e-mail:
of 18 CFR 4.34(b). Agencies may obtain Brian.Romanek@ferc.gov.
tailrace; (6) a 5-mile-long, 69-kV copies of the application directly from
transmission line; and (7) appurtenant j. Deadline for filing comments and or
the applicant. Each filing must be motions: January 12, 2007.
facilities. accompanied by proof of service on all
Two additional generating units are All documents (original and eight
persons listed on the service list copies) should be filed with: Magalie R.
connected to the project power conduit prepared by the Commission in this
as follows: Salas, Secretary, Federal Energy
proceeding, in accordance with 18 CFR Regulatory Commission, 888 First
The Fish Valve Unit consists of: (1) A
4.34(b) and 385.2010. Street, NE., Washington, DC 20426.
36-inch-diameter wye penstock
connected to the power conduit; (2) a o. Procedural schedule: The Please include the project number (P–
powerhouse containing one 670 kW application will be processed according 2210–143) on any comments or motions
generating unit; (3) a 7,700-foot-long, to the following Hydro Licensing filed. Comments, protests, and
12.47-kV transmission line; and (4) Schedule. Revisions to the schedule will interventions may be filed electronically
appurtenant facilities. be made as appropriate. The via the internet in lieu of paper. See, 18
The Pulp Mill Feeder Unit consists of: Commission staff proposes to issue a CFR 385.2001(a)(1)(iii) and the
(1) A 36-inch-diameter tee connected to single environmental assessment for instructions on the Commission’s web
the power conduit; (2) a 36-inch- comment rather than issuing a draft and site under the ‘‘e-Filing’’ link. The
diameter, 24-foot-long penstock; (3) a final EA. Comments, terms and Commission strongly encourages e-
powerhouse containing one 870 kW conditions, recommendations, filings.
generating unit; (4) a 470-foot-long 4.16- prescriptions, and reply comments, if k. Description of Application: The
kV transmission line; and (5) any, will be addressed in the EA. Staff licensee requests a variance be granted
appurtenant facilities. intend to give at least 30 days for to Willard Companies (Willard) for the
m. A copy of the application is entities to comment on the EA, and will construction of four floating docks
available for review at the Commission take into consideration all comments accommodating 17 boats and to
in the Public Reference Room or may be received on the EA before final action is maintain an existing boat ramp, all of
viewed on the Commission’s Web site at taken on the license application. which would serve a residential
http://www.ferc.gov using the Notice of the availability of the EA community, known as ‘‘The Farms at
mstockstill on PROD1PC61 with NOTICES

‘‘eLibrary’’ link. Enter the docket June 2007. Smith Mountain Lake’’ (located in
number, excluding the last three digits Franklin County near Rocky Mount,
in the docket number field to access the Magalie R. Salas, Virginia). The licensee is requesting the
document. For assistance, contact FERC Secretary. variance because the proposed action is
Online Support at [FR Doc. E6–21386 Filed 12–14–06; 8:45 am] not in conformance with the approved
FERCOnlineSupport@ferc.gov or toll- BILLING CODE 6717–01–P project Shoreline Management Plan

VerDate Aug<31>2005 15:47 Dec 14, 2006 Jkt 211001 PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 E:\FR\FM\15DEN1.SGM 15DEN1

Вам также может понравиться