Академический Документы
Профессиональный Документы
Культура Документы
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Document Type: CAL
System / Subsystem:
Revision: 0A
Discipline: ELE
Status: IFR
Rev. Date:
CONTRACTOR DOCUMENT:
Page: 1 of 8
ELECTRICAL SYSTEM
GROUNDING CALCULATION
REV.
STATU
S
0A
IFR
DATE
REVISION MEMO
Issued For Review
ISSUED
CHECK
APP
R.
COMPANY
APPROVAL
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Document Type: CAL
System / Subsystem:
Revision: 0A
Discipline: ELE
CONTRACTOR DOCUMENT:
Status: IFR
Rev. Date:
Page: 2 of 8
REVISION TABLE
PAGES
PAGES
B C D E
REMARKS
ATT
ATTACHMENTS
EXHIBIT
PAGES
REVISIONS
REVISIONS
A
REMARKS
B C D E
REVISIONS
REMARKS
A
B C D E
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Document Type: CAL
CONTRACTOR DOCUMENT:
System / Subsystem:
Revision: 0A
Discipline: ELE
Status: IFR
Rev. Date:
Page: 3 of 8
1. GENERAL......................................................................................................................... 4
2. REFERENCES..................................................................................................................4
3. ABBREVIATION................................................................................................................4
4. SCOPE.............................................................................................................................. 5
4.1 Electrical system neutral grounding..........................................................................5
4.2 Electrical safety grounding........................................................................................5
4.3 Electrostatic grounding.............................................................................................5
5. GROUNDING CALCULATION PARAMETER...................................................................5
5.1 Soil resistivity............................................................................................................ 5
5.2 Grounding conductor................................................................................................5
5.3 Grounding electrode.................................................................................................6
5.4 Tolerable step and touch voltage..............................................................................7
6. GROUNDING CALCULATION ANALYSIS RESULT..........................................................7
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Document Type: CAL
System / Subsystem:
Revision: 0A
Discipline: ELE
CONTRACTOR DOCUMENT:
Status: IFR
Rev. Date:
Page: 4 of 8
1. GENERAL
The purpose of this document is to give guidance on the design of the grounding and
lightning protection system. The grounding system is provided for the safety of
personnel, equipment and the proper operation of the plant. The project specifications
and the applicable international standards are listed
This calculation will be revised whenever necessary to cope up with the changes on the
system components that may be caused by further engineering.
2. REFERENCES
The grounding and lightning protection system shall be design in accordance with the
applicable sections of the following standards and codes:
IEEE 142
IEEE 80-2000
NFPA 70
NFPA 780
3. ABBREVIATION
kVA
MVA
PF
LF
ACSR
GCB
HV
LV
LVSB
MDB
SDB
DB
Es
E
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Document Type: CAL
System / Subsystem:
Revision: 0A
Discipline: ELE
CONTRACTOR DOCUMENT:
Status: IFR
Rev. Date:
Page: 5 of 8
4. SCOPE
This document includes the following systems:
Resistivity
(ohm.m)
Depth
(Feet)
2500
0.328
Soil
17.28
3.28
Soil
48.55
9.84
Soil
32.9
16.4
Soil
26.67
22.96
Location
Switchyard
Area
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Document Type: CAL
System / Subsystem:
Revision: 0A
Discipline: ELE
Status: IFR
Rev. Date:
CONTRACTOR DOCUMENT:
Page: 6 of 8
= 9.84 feet
Diameter
= 3 /4 inch
Total resistance of the grounding grid calculated in accordance with IEEE 80-2000
calculated as follows:
a)
Rg
R1 R 2 R m2
R1 R 2 2 R m
R1
LC
2 LC k1 LC
k2
ln
A
a'
R2
2 nR L R
2 k1 LR
4 LR
1
ln
A
b
nR 1
Rm
2 LC
ln
LC LR
k 2 1
A
k1 LC
Where:
Rg
R1
R2
Rm
LC
2a
k1
k2
LR
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Document Type: CAL
System / Subsystem:
Revision: 0A
Discipline: ELE
CONTRACTOR DOCUMENT:
Status: IFR
Rev. Date:
Page: 7 of 8
2b
nR
L AREA
WAREA
hC
0.157
ts
0.157
ts
Where,
Cs
Ts
0.09 1
s
Cs 1
2hs 0.09
Where
Hs
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Document Type: CAL
System / Subsystem:
Revision: 0A
Discipline: ELE
CONTRACTOR DOCUMENT:
Status: IFR
Rev. Date:
Page: 8 of 8
Below is summary for the grounding calculation report, while complete ETAP calculation
shown on attachment-3
Grounding calculation
Area
Grounding
rod quantity
Total
resistance
Value
Touch
Potential
Tolerable
touch
potential
Step
Potential
Tolerable
step
potential
Switchyard
720
0.64 ohm
584.5
595.9
1090.2
1891.5
Note: Above calculation used L-G short circuit data maximum 13 kA, X/R=8.5%
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Document Type: CAL
System / Subsystem:
Revision: 0A
Discipline: ELE
CONTRACTOR DOCUMENT:
Rev. Date:
Page: 9 of 8
ATTACHMENT 1
GROUNDING LAYOUT PLAN
Status: IFR
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Document Type: CAL
System / Subsystem:
Revision: 0A
Discipline: ELE
CONTRACTOR DOCUMENT:
Rev. Date:
Page: 10 of 8
ATTACHMENT 2
ETAP 2D AND 3D MODEL
Status: IFR
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Document Type: CAL
CONTRACTOR DOCUMENT:
System / Subsystem:
Revision: 0A
Discipline: ELE
Rev. Date:
Page: 11 of 8
ATTACHMENT 3
GROUNDING CALCULATION REPORT
Status: IFR
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Document Type: CAL
System / Subsystem:
Revision: 0A
Discipline: ELE
Status: IFR
Rev. Date:
CONTRACTOR DOCUMENT:
Page: 12 of 8
: Ketigul Substation
Client
Subject
Date
Sampl
e ID
Unit
CPI Specification
Method
1
001-01 KETIGUL,POWER
HOLE 03
2
002-01 KETIGUL,POWER
HOLE 03
3
003-01 KETIGUL,POWER
HOLE 03
4
004-01 KETIGUL,POWER
HOLE 03
5
005-01 KETIGUL,POWER
HOLE 04
6
006-01 KETIGUL,POWER
HOLE 04
7
007-01 KETIGUL,POWER
HOLE 04
8
008-01 KETIGUL,POWER
HOLE 04
Time
Conductivity
pH
Umho/cm
PLANT,BORE :
SM2510B
529
SM 4500 H+
3,94
PLANT,BORE :
206
4,52
PLANT,BORE :
304
5,31
PLANT,BORE :
375
5,72
PLANT,BORE :
30,9
4,23
PLANT,BORE :
215
4,91
PLANT,BORE :
82,7
5,65
PLANT,BORE :
n/a
5,89
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Document Type: CAL
System / Subsystem:
Revision: 0A
Discipline: ELE
Status: IFR
Rev. Date:
CONTRACTOR DOCUMENT:
Page: 13 of 8
Description
BORE HOLE,03
BORE HOLE,03
BORE HOLE,03
BORE HOLE,03
BORE HOLE,04
BORE HOLE,04
BORE HOLE,04
BORE HOLE,04
Depth
Conductivity
(m)
1
3
5
7
1
3
5
7
(mhosicrn)
529
206
304
375
30,9
215
82,7
n/a
Resistivity (.m)
17,28
48,55
32,9
26,67
323,63
46,52
120,92
n/a
Sice data for bore hole 04 are not complete,data from bore hole 03 will be used in
this calculation.
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Document Type: CAL
System / Subsystem:
Revision: 0A
Discipline: ELE
CONTRACTOR DOCUMENT:
Project
: Ketigul Substation
Client
Subject
Date
Status: IFR
Rev. Date:
Page: 14 of 8
s
3I0
A
Cs
d
D
Dm
Em
Es
Estep50
Lp
Estep70
Etouch50
Etouch70
h
hs
IG
Description
Soil resistivity, m
Surface layer resistivity Crushed rock, m
Symmetrical fault current in substation for
conductor sizing, A
Total area enclosed by ground grid,m2
Surface layer derating factor
Diameter of grid conductor,m
Spacing between parallel conductors,m
Maximum distance between any two points
on the grid ,m
Mesh voltage at the center of the corner mesh
for the simplited method , V
Step voltage between a point above the outer
corner of the grid and a point 1 m diagonally
outside the grid for the simpliled method ,V
Tolerable step voltage for human with 50 kg
body weight ,V
Square area ground
Tolerable step voltage for human with 70 kg
body weight ,V
Tolerable touch voltage for human with 50 kg
body weight, V
Tolerable touch voltage for human with 70 kg
body weight, V
Depth of ground grid conductors, m
Surface layers thickness,
Maximum grid current that flows between
ground grid and surrounding earth ( including
Remark
17,28 m/323,63 m
2500 m
Unknown
Unknown
Unknown
Unknown
7m
Unknown
Unknown
Unknown
66m+77m+66m+77m
Unknown
Unknown
Unknown
0.5 m
Crushed rock
Unknown
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Document Type: CAL
System / Subsystem:
CONTRACTOR DOCUMENT:
dc offset),A
Revision: 0A
Discipline: ELE
Rev. Date:
Page: 15 of 8
Status: IFR