Вы находитесь на странице: 1из 2

66944 Federal Register / Vol. 71, No.

222 / Friday, November 17, 2006 / Notices

proposed collection of information is in (2) Collection title: Standby Support Draft EISs
an interim final rule pertaining to for Certain Nuclear Plant Delays. EIS No. 20060206, ERP No. D–FRC–
standby support that was published in (3) Type of review: New collection. E03015–MS, Clean Energy Liquefied
the Federal Register on May 15, 2006. (4) Type of respondents: Sponsors of Natural Gas (LNG) Import Terminal
Request for Comments: Pursuant to 44 new advanced nuclear facilities. and Natural Gas Pipeline Facilities,
U.S.C. 3506(c)(2)(A), the Department (5) Estimated number of respondents: Construction and Operation, U.S.
invites comment on: (1) Whether the Three to five per year. Army COE Section 10 and 404
recordkeeping requirements in the (6) Estimated total burden hours: 218. Permits, (FERC/EIS–0192D), Port of
interim final rule are necessary for the (7) Frequency of response: Single Pascagoula, Jackson County, MS.
proper performance of the functions of submission.
the agency, including whether the (8) Abstract: On May 15, 2006, the Summary: EPA expressed
information has practical utility; (2) the Department published an interim final environmental concerns about air
accuracy of the Department’s estimate of rule to implement section 638 of the quality impacts, dredged material
the burden of the proposed information Energy Policy Act of 2005 that disposal, environmental justice, and risk
collection, including the validity of the authorizes the Secretary of Energy to analysis. Rating EC2.
methodology and assumptions used; (3) enter into Standby Support Contracts EIS No. 20060207, ERP No. D–FRC–
ways to enhance the quality, utility, and with sponsors of advanced nuclear E03016–MS, Casotte Landing
clarity of the information to be power facilities to provide risk Liquefied Natural Gas (LNG) Import
collected; and (4) ways to minimize the insurance for certain delays attributed to and Interstate Natural Gas
burden of the collection of information the regulatory process or litigation. (71 Transmission Facilities, Construction
on those who choose to respond, FR 28200). That rule contains the and Operation, U.S. Army COE
including through the use of automated following recordkeeping requirements Section 404 Permit, (FERC/EIS–
collection techniques or other forms of that must be approved by OMB 0193D), near the City of Pascagoula,
information technology. Additional pursuant to the Paperwork Reduction Jackson County, MS.
information about the Department’s Act of 1995 (44 U.S.C. 3501 et seq.) Summary: EPA expressed
proposed information collection may be before sponsors can be required to environmental concerns about air
obtained from the contact person named comply with them: (1) Section 950.10(b) quality impacts, dredged material
in this notice. contains information collection disposal, environmental justice, and risk
DATES: Comments regarding this requirements pertaining to eligibility; analysis. Rating EC2.
collection must be received on or before (2) Section 950.12(a) contains EIS No. 20060354, ERP No. D–FHW-
December 18, 2006. If you anticipate information collection requirements F40437–MN, Scott County State Aid
that you will be submitting comments, pertaining to fulfillment of conditions Highway (CSAH) 21 Project,
but find it difficult to do so within the precedent to a Standby Support Extension from CSAH 42 in Prior
period of time allowed by this notice, Contract; and (3) Section 950.23 Lake to CSAH 18 at Southbridge
please advise the OMB Desk Officer of contains information collection Parkway in Shakopee, U.S. Army COE
your intention to make a submission as requirements pertaining to submission Section 404 Permit, Scott County,
soon as possible. The Desk Officer may of claims for payment of covered costs MN.
be telephoned at 202–395–4650. under a Standby Support Contract. Summary: EPA expressed
ADDRESSES: Written comments should Issued in Washington, DC, on November 8, environmental concerns about
be sent to: DOE Desk Officer, Office of 2006. cumulative impacts to water quality and
Information and Regulatory Affairs, Lorretta D. Bryant, quantity, wetlands, aquatic resources,
Office of Management and Budget, New Acting Director, Records Management forest and wildlife habitat, and the
Executive Office Building, Room 10102, Division, Office of the Chief Information Shakopee Mdewakanton Sioux
735 17th Street, NW., Washington, DC Officer. Community, and requests further
20503. [FR Doc. E6–19482 Filed 11–16–06; 8:45 am] clarification on the range of alternatives.
Comments should also be addressed BILLING CODE 6450–01–P Rating EC2.
to: Jeffrey Martus, IM–11/Germantown EIS No. 20060364, ERP No. D–BIA–
Building, U.S. Department of Energy, L65523–WA, Spokane Tribes
1000 Independence Ave SW., Integrated Resource Management
ENVIRONMENTAL PROTECTION
Washington, DC 20585–1290. Plan, Implementation, Stevens
AGENCY
or by fax at 301–903–9061 or by e-mail County, WA.
at Jeffrey.martus@hq.doe.gov. [ER–FRL–6681–3]
Summary: EPA expressed
FOR FURTHER INFORMATION CONTACT: environmental concerns about water
Environmental Impact Statements and
Kenneth Chuck Wade, Project Manager, Regulations; Availability of EPA quality and quantity impacts. EPA also
Office of Nuclear Energy, NE–30, U.S. Comments has concerns about use of the Midnite
Department of Energy, Room A–264, Mine site before contamination cleanup
19901 Germantown Road, Germantown, Availability of EPA comments is completed and monitoring shows the
MD 20874–1290. (301) 903–6509 or prepared pursuant to the Environmental site poses no further threats to human
Marvin Shaw, Attorney-Advisor, U.S. Review Process (ERP), under section health and the environment. Rating EC1.
Department of Energy, Office of the 309 of the Clean Air Act and Section
General Counsel, GC–52, 1000 102(2)(c) of the National Environmental Final EISs
Independence Avenue, SW., Policy Act as amended. Requests for EIS No. 20060390, ERP No. F–FHW–
Washington DC 20585. (202) 586–2906. copies of EPA comments can be directed D40327–PA, Southern Beltway
jlentini on PROD1PC65 with NOTICES

SUPPLEMENTARY INFORMATION: The to the Office of Federal Activities at Transportation Project, Improvement
information collection packages listed 202–564–7167. An explanation of the from US–22 in Robinson Township to
in this notice for public comment ratings assigned to draft environmental Interstate 79 in South Fayette
include the following: impact statements (EISs) was published Township and Cecil Township,
(1) OMB No. None. in FR dated April 7, 2006 (71 FR 17845). Funding and U.S. Army COE Section

VerDate Aug<31>2005 16:31 Nov 16, 2006 Jkt 211001 PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 E:\FR\FM\17NON1.SGM 17NON1
Federal Register / Vol. 71, No. 222 / Friday, November 17, 2006 / Notices 66945

404 Permit, Washington, Allegheny MD State Line to DE–1, South of the ACTION: Notice of settlement.
Counties, PA. Chesapeake and Delaware Canal, New
Castle County, DE, Comment Period SUMMARY: Under section 122 (h) of the
Summary: EPA does not object to the Comprehensive Environmental
preferred alternative. Ends: 02/01/2007, Contact: Robert
Kleinburd 302–734–2966. Response, Compensation and Liability
EIS No. 20060403, ERP No. F–AFS– Act (CERCLA), the United States
EIS No. 20060470, Final EIS, FHW, CO,
K65310–CA, Freeman Project, Reduce Environmental Protection Agency has
I–25 Valley Highway Project,
Hazardous Fuel and Improving Forest entered into a settlement for
Transportation Improvement from
Health, Implementation, Lake Logan to U. S. 6, Denver County, CO, reimbursement of past response costs
Recreation Area, Beckworth Ranger Wait Period Ends: 12/18/2006, concerning the Industrial Metal Alloys
District, Plumas National Forest, Contact: Chris Horn 720–963–3017. Superfund Site located in Winston-
Plumas County, CA. EIS No. 20060471, Draft EIS, FHW, IL, Salem, Forsyth County, North Carolina..
Summary: EPA continues to express Prairie Parkway Study, Transportation DATES: The Agency will consider public
concerns about water and air quality System Improvement between comments on the settlement until
impacts, and recommends consideration Interstate 80 (I–80) and Interstate 88 December 18, 2006. The Agency will
of Alternative 3 as the preferred (I–88) Grundy, Kendall and Kane consider all comments received and
alternative. Counties, Il, Comment Period Ends: may modify or withdraw its consent to
Dated: November 14, 2006. 01/16/2007 Contact: Matt Fuller 217– the settlement if comments received
Robert W. Hargrove, 492–4625. disclose facts or considerations which
EIS No. 20060472, Draft EIS, MMS, 00, indicate that the settlement is
Director, NEPA Compliance Division, Office
of Federal Activities.
Gulf of Mexico Outer Continental inappropriate, improper, or inadequate.
Shelf Oil and Gas Lease Sales: 2007– ADDRESSES: Copies of the settlement are
[FR Doc. E6–19472 Filed 11–16–06; 8:45 am]
2012 Western Planning Area Sales available from Ms. Paula V. Batchelor.
BILLING CODE 6560–50–P
204, 207, 210, 215, and 218: Central Submit your comments, identified by
Planning Area Sales 205, 206, 208, Docket ID No. EPA–RO4–SFUND–2006–
213, 216, and 222, : TX, LA, MS, AL 0863 or Site name Industrial Metal
ENVIRONMENTAL PROTECTION
and Fl, Comment Period Ends: 01/02/ Alloy Superfund Site by one of the
AGENCY
2007, Contact: Mary Boatman 703– following methods:
[ER–FRL–6681–2] 787–1662. • http://www.regulations.gov: Follow
EIS No. 20060473, Final EIS, FHW, MO, the online instructions for submitting
Environmental Impacts Statements; Interstate 29/35 Paseo Bridge comments.
Notice of Availability Corridor, Reconstruct and Widen I– • E-mail: Batchelor.Paula@epa.gov.
29/35, Missouri River, North Kansas • Fax: 404/562–8842/Attn Paula V.
Responsible Agency: Office of Federal City and Kansas City, Clay and Batchelor.
Activities, General Information (202) Jackson Counties, MO, Wait Period • Mail: Ms. Paula V. Batchelor, U.S.
564–7167 or http://www.epa.gov/ Ends: 12/18/2006, Contact: Peggy EPA Region 4, WMD–SEIMB, 61 Forsyth
compliance/nepa/. Casey 573–636–7104. Street, SW., Atlanta, Georgia 30303. ‘‘In
Weekly receipt of Environmental Impact addition, please mail a copy of your
Statements Amended Notices comments on the information collection
Filed 11/06/2006 Through 11/10/2006 EIS No. 20060404, Final EIS, SFW, AK, provisions to the Office of Information
Pursuant to 40 CFR 1506.9 Kodiak National Wildlife Refuge, and Regulatory Affairs, Office of
EIS No. 20060466, Final EIS, BLM, WY, Draft Revised Comprehensive Management and Budget (OMB), Attn:
Pit 14 Coal Lease-by-Application Conservation Plan, Implementation, Desk Officer for EPA, 725 17th St. NW.,
Project, Black Butte Coal Mine, AK, Wait Period Ends: 12/15/2006, Washington, DC 20503.’’ Instructions:
Surface Mining Operations, Federal Contact: Mikel R. Haase 907–786– Direct your comments to Docket ID No.
Coal Lease Application WYW160394, 3402. EPA–R04–SFUND–2006–0863. EPA’s
Sweetwater County, WY, Wait Period Revision of FR Notice Published on policy is that all comments received
Ends: 12/18/2006, Contact: Teri 10/06/2006: CEQ Wait Period Ending will be included in the public docket
Deakin 307–352–0211. 11/06/2006 has been Extended to 12/15/ without change and may be made
EIS No. 20060467, Draft EIS, FHW, CA, 2006 available online at http://
Interstate 5 (Santa Ana Freeway) Dated: November 14, 2006. www.regulations.gov, including any
Project, Improvement from State Robert W. Hargrove,
personal information provided, unless
Route 91 in Orange County to the comment includes information
Director, NEPA Compliance Division, Office
Interstate 605 in Los Angeles County, of Federal Activities. claimed to be Confidential Business
CA, Comment Period Ends: 01/05/ Information (CBI) or other information
[FR Doc. E6–19474 Filed 11–16–06; 8:45 am]
2007, Contact: Steve Healow 916– whose disclosure is restricted by statute.
BILLING CODE 6560–50–P
498–5849. Do not submit information that you
EIS No. 20060468, Final EIS, NPS, CA, consider to be CBI or otherwise
Sequoia and Kings Canyon National ENVIRONMENTAL PROTECTION protected through www.regulations.gov
Parks, General Management Plan, AGENCY or e-mail. The www.regulations.gov
Middle and South Forks of the Kings Web site is an ‘‘anonymous access’’
River and North Forks of the Kern [Docket# EPA–RO4–SFUND–2006–0863; system, which means EPA will not
River, General Management Plan, FRL–8243–6] know your identity or contact
Tulare and Fresno Counties, CA, Wait information unless you provide it in the
Industrial Metal Alloy Superfund Site;
jlentini on PROD1PC65 with NOTICES

Period Ends: 12/18/2006, Contact: body of your comment. If you send an


Winston-Salem, Forsyth County, North
Susan Spain 202–245–4692. e-mail comment directly to EPA without
Carolina; Notice of Settlement
EIS No. 20060469, Draft EIS, FHW, 00, going through www.regulations.gov
U.S. 301 Project Development, AGENCY: Environmental Protection your e-mail address will be
Transportation Improvements from Agency (EPA). automatically captured and included as

VerDate Aug<31>2005 16:31 Nov 16, 2006 Jkt 211001 PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 E:\FR\FM\17NON1.SGM 17NON1

Вам также может понравиться