Вы находитесь на странице: 1из 1

65802 Federal Register / Vol. 71, No.

217 / Thursday, November 9, 2006 / Notices

(866) 208–3676 (toll free). For TTY, call ‘‘eFiling’’ link at http://www.ferc.gov. include gas compression and
(202) 502–8659. Persons unable to file electronically withdrawal facilities, a leaching plant,
should submit an original and 14 copies an electrical substation, raw water
Magalie R. Salas,
of the protest or intervention to the withdrawal and brine disposal facilities,
Secretary. Federal Energy Regulatory Commission, approximately 11.4 miles of pipeline
[FR Doc. E6–18934 Filed 11–8–06; 8:45 am] 888 First Street, NE., Washington, DC and utility corridor, metering facilities
BILLING CODE 6717–01–P 20426. and ancillary equipment.
This filing is accessible online at This notice announces the opening of
http://www.ferc.gov, using the the public comment period that will be
DEPARTMENT OF ENERGY ‘‘eLibrary’’ link and is available for used to gather environmental input from
review in the Commission’s Public the public and interested agencies on
Federal Energy Regulatory Reference Room in Washington, DC. the project. Comments are requested by
Commission There is an ‘‘eSubscription’’ link on the December 4, 2006.
[Docket No. EL07–14–000] Web site that enables subscribers to This notice is being sent to potentially
receive e-mail notification when a affected landowners; Federal, state, and
Wisconsin Public Power Inc., document is added to a subscribed local government agencies; elected
Municipal Wholesale Power Group, docket(s). For assistance with any FERC officials; environmental and public
and Great Lakes Utilities, Online service, please e-mail interest groups; Native American Tribes,
Complainants v. Wisconsin Power & FERCOnlineSupport@ferc.gov, or call other interested parties; local libraries
Light Co., Respondent; Notice of (866) 208–3676 (toll free). For TTY, call and newspapers. State and local
Complaint (202) 502–8659. government representatives are asked to
Comment Date: 5 p.m. eastern time on notify their constituents of this planned
November 2, 2006. November 21, 2006. project and encourage them to comment
Take notice that on November 1, on their areas of concern. If you are a
2006, Wisconsin Public Power Inc., Magalie R. Salas,
landowner receiving this notice, you
Municipal Wholesale Power Group, and Secretary.
may be contacted by a MS HUB
Great Lakes Utilities (collectively, [FR Doc. E6–18926 Filed 11–8–06; 8:45 am] company representative about the
Wisconsin Publics) filed a complaint BILLING CODE 6717–01–P acquisition of an easement to construct,
against Wisconsin Power & Light Co., operate, and maintain the proposed
(WPL) pursuant to section 206 of the facilities. The company would seek to
Federal Power Act (FPA). Wisconsin DEPARTMENT OF ENERGY negotiate a mutually acceptable
Publics states that in Docket Nos. ER06– agreement. However, if the project is
1517 and ER06–1518 WPL has made Federal Energy Regulatory
Commission approved by the Commission, that
filings under section 205 of the FPA to approval conveys with it the right of
change its rates, terms, and conditions [Docket No. CP07–4–000] eminent domain. Therefore, if easement
for service to Wisconsin Publics WPL’s negotiations fail to produce an
PR–1 Tariff and W–3A Tariff, Mississippi Hub, L.L.C.; Notice of
agreement, the natural gas company
respectively. Wisconsin Publics notes Intent To Prepare an Environmental
could initiate condemnation
that it has recently submitted extensive Assessment for the Proposed
proceedings in accordance with state
protests regarding both of those filings, Mississippi Hub Gas Storage Project
law.
and has requested consolidation of and Request for Comments on A fact sheet prepared by the FERC
Docket Nos. ER06–1517 and ER06–1518. Environmental Issues entitled ‘‘An Interstate Natural Gas
Wisconsin Publics states that this November 3, 2006. Facility On My Land? What Do I Need
complaint also seeks an investigation The staff of the Federal Energy To Know?’’ was attached to the project
and refund effective date under section Regulatory Commission (FERC or notice MS HUB provided to
206 of the FPA, and asks that this third Commission) will prepare an landowners. This fact sheet addresses a
proceeding be consolidated with both of environmental assessment (EA) that will number of typically asked questions,
the ER Dockets. discuss the environmental impacts of a including the use of eminent domain
Any person desiring to intervene or to proposal by Mississippi Hub, L.L.C. (MS and how to participate in the
protest this filing must file in HUB) to construct, own, and operate a Commission’s proceedings. It is
accordance with Rules 211 and 214 of new salt cavern natural gas storage available for viewing on the FERC
the Commission’s Rules of Practice and facility in Simpson and Jefferson Davis Internet Web site (http://www.ferc.gov).
Procedure (18 CFR 385.211, 385.214). Counties, Mississippi.1 The proposal
Protests will be considered by the Summary of the Proposed Project
would provide for the injection, storage,
Commission in determining the and withdrawal of natural gas in two MS HUB seeks authority to construct
appropriate action to be taken, but will underground caverns created in the and operate the following:
not serve to make protestants parties to Bond Salt Dome formation using a (1) Natural Gas Handling Facility Site;
the proceeding. Any person wishing to solution mining (leaching) process. Simpson County (approximately 80
become a party must file a notice of Once complete, the project would acres). The facility would include two
intervention or motion to intervene, as provide approximately 12 billion cubic storage caverns; a 29,205 horsepower
appropriate. The Respondent’s answer feet (Bcf) of working gas storage compressor station; separation,
and all interventions, or protests must capacity, capable of injecting 600 dehydration, metering, and appurtenant
be filed on or before the comment date. million cubic feet per day (MMcfd) and facilities; leaching plant; one freshwater
The Respondent’s answer, motions to well; and a non-jurisdictional electrical
sroberts on PROD1PC70 with NOTICES

delivering gas at maximum rates up to


intervene, and protests must be served 1,200 MMcfd. Proposed project facilities substation. Solution mining of the
on the Complainants. caverns would occur over an
The Commission encourages 1 MS HUB’s application was filed with the approximate five-year time span.
electronic submission of protests and Commission under section 7 of the Natural Gas Act (2) Primary Raw Water Withdrawal
interventions in lieu of paper using the and Part 157 of the Commission’s regulations. and Brine Disposal Facility

VerDate Aug<31>2005 16:26 Nov 08, 2006 Jkt 211001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\09NON1.SGM 09NON1

Вам также может понравиться