Federal Register / Vol. 71, No.

209 / Monday, October 30, 2006 / Notices 63297

DEPARTMENT OF ENERGY constructed by Inland Portland Cement government dam; or (4) if applicable,
Company in 1909. The District entered has involved or would involve any
Federal Energy Regulatory into an agreement with Inland to construction subsequent to 1935 that
Commission purchase the project in 1957 and filed may have increased or would increase
an application for a license. The Federal the project’s head or generating
Notice of Petition for Declaratory Order Power Commission issued the license capacity, or have otherwise significantly
Disclaiming Jurisdiction Over the for Project No. 2225 on November 25, modified the project’s pre-1935 design
Sullivan Creek Project, and Soliciting 1958. The District proposed to operate or operation.
Comments, Protests, and/or Motions the project as a storage project l. Locations of the application: Copies
To Intervene benefiting downstream generation of this filing are on file with the
October 20, 2006.
projects (other than the Sullivan Creek Commission and are available for public
plant) on the Pend Oreille River and the inspection. This filing may be viewed
Take notice that the following
Columbia Rivers. The project consists of on the Web at http://www.ferc.gov using
application has been filed with the
Sullivan Lake and dam, Mill Pond and the ‘‘eLibrary’’ link, select ‘‘Docket#’’
Commission and is available for public
dam, Mill Pond Historic Site, a flume and follow the instructions. For
inspection:
and canal, a forebay, a horseshoe- assistance, please contact FERC Online
a. Application Type: Petition for
shaped tunnel power conduit, and a Support at
Declaratory Order.
powerhouse. Sullivan Lake has 31,000 FERCOnlineSupport@ferc.gov or toll-
b. Docket No: DI07–1–000 and P–
acre-feet of active storage capacity. free at (866) 208–3676, or TTY, contact
2225.
Sullivan Lake Dam is a 58-foot-long by (202) 502–8659.
c. Date Filed: October 5, 2006.
29-foot-high concrete gravity dam. Mill m. Individuals desiring to be included
d. Applicant: Public Utility District
Pond has a 1,962 acre-foot capacity. Mill on the Commission’s mailing list should
No. 1 of Pend Oreille County,
Pond Dam is a 134-foot-long by 55-foot- so indicate by writing to the Secretary
Washington (District).
high concrete gravity dam. Sullivan of the Commission.
e. Name of Project: Sullivan Creek
Lake stores and releases about 31,000
Power Project. n. Comments, Protests, And/Or
acre-feet of water annually, in
f. Location: The Sullivan Creek Power Motions to Intervene—Anyone may
accordance with the Pacific Northwest
Project is located on Sullivan Lake, submit comments, a protest, and/or a
Coordination Agreement and its license.
Outlet Creek and Sullivan Creek, a motion to intervene in accordance with
The District gave notice in 2003 that it
tributary of Pend Oreille River, in the the requirements of Rules of Practice
did not intend to seek a new license
vicinity of the town of Metaline Falls, and Procedure, 18 CFR 385.210, .211,
when the current license expires on
Pend Oreille County, Washington, and .214. In determining the appropriate
October 1, 2008.
occupies lands of the United States This petition requests the action to take, the Commission will
within the Colville National Forest. The Commission to confirm that the consider all protests or other comments
project is not located on Tribal lands. Sullivan Creek Project is not necessary filed, but only those who file a motion
g. Filed Pursuant to: Section 23(b)(1) or appropriate for any downstream unit to intervene in accordance with the
of the Federal Power Act, 16 U.S.C. of development, because it is not Commission’s Rules may become a
817(b). directly connected to and has only party to the proceeding. Any comments,
h. Applicant Contact: James B. Vasile, immaterial effects on downstream protests, or motions to intervene must
Davis Wright Tremaine LLP, 1500 K generation, and is therefore not required be received on or before the specified
Street, NW., Suite 450, Washington, DC to be licensed pursuant to Section comment date for the particular
20005. Telephone: (202) 508–6662; 23(b)(1) of the Federal Power Act. The application.
FAX: (202) 508–6699; e-mail: petition also requests the Commission o. Filing and Service of Responsive
jimvasile@dwt.com. determine that the existing license is Documents—any filings must bear in all
i. FERC Contact: Any questions on null and void, since the Commission capital letters the title ‘‘COMMENTS’’,
this notice should be addressed to lacked jurisdiction to issue a voluntary ‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO
Henry G. Ecton (202) 502–8768, or license under Section 4(e) in this INTERVENE’’, as applicable, and the
E-mail: henry.ecton@ferc.gov. circumstance. In the alternative, if it is Docket Number of the particular
j. Deadline for filing comments, determined that the District currently application to which the filing refers. A
protests, and/or motions: November 20, possesses a voluntary license, the copy of any motion to intervene must
2006. petition requests the Commissions to also be served upon each representative
All documents (original and eight confirm that the District is not required of the applicant specified in the
copies) should be filed with: Secretary, to file a surrender application or seek particular application.
Federal Energy Regulatory Commission, any other Commission authorization p. Agency Comments—Federal, state,
888 First Street, NE., Washington, DC upon the expiration of its license. and local agencies are invited to file
20426. Comments, protests, and/or When a Petition for Declaratory Order comments on the described application.
interventions may be filed electronically is filed with the Federal Energy A copy of the application may be
via the Internet in lieu of paper. Any Regulatory Commission, the Federal obtained by agencies directly from the
questions, please contact the Secretary’s Power Act requires the Commission to applicant. If an agency does not file
Office. See 18 CFR 385.2001(a)(1)(iii) investigate and determine if the comments within the time specified for
and the instructions on the interests of interstate or foreign filing comments, it will be presumed to
Commission’s Web site at: http:// commerce would be affected by the have no comments. One copy of an
www.ferc.gov project. The Commission also agency’s comments must also be sent to
Please include the docket number determines whether or not the project:
sroberts on PROD1PC70 with NOTICES

the applicant’s representatives.


(DI07–1–000) on any protests, (1) Would be located on a navigable
comments or motions filed. waterway; (2) would occupy or affect Magalie R. Salas,
k. Previous Commission Actions and public lands or reservations of the Secretary.
Proposal of Petition: The existing United States; (3) would utilize surplus [FR Doc. E6–18115 Filed 10–27–06; 8:45 am]
Sullivan Creek Power Project was water or water power from a BILLING CODE 6717–01–P

VerDate Aug<31>2005 02:16 Oct 28, 2006 Jkt 211001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\30OCN1.SGM 30OCN1