61044 Federal Register / Vol. 71, No.

200 / Tuesday, October 17, 2006 / Notices

remove the outdated restriction on sales to a subscribed dockets(s). For proposed facilities. The pipeline
to Illinois Power Co. assistance with any FERC Online company would seek to negotiate a
Filed Date: 10/04/2006. service, please e-mail mutually acceptable agreement.
Accession Number: 20061006–0009. FERCOnlineSupport@ferc.gov. or call However, if the project is approved by
Comment Date: 5 p.m. Eastern Time (866) 208–3676 (toll free). For TTY, call the Commission, that approval conveys
on Wednesday, October 25, 2006. (202) 502–8659. with it the right of eminent domain.
Docket Numbers: ER07–14–000. Therefore, if easement negotiations fail
Magalie R. Salas,
Applicants: Southwest Power Pool, to produce an agreement, the pipeline
Secretary.
Inc. company could initiate condemnation
[FR Doc. E6–17173 Filed 10–16–06; 8:45 am] proceedings in accordance with state
Description: Southwest Power Pool,
Inc submits notices of cancellation for BILLING CODE 6717–01–P law.
Network Operating Agreements. A fact sheet prepared by the FERC
Filed Date: 10/04/2006. entitled ‘‘An Interstate Natural Gas
DEPARTMENT OF ENERGY Facility On My Land? What Do I Need
Accession Number: 20061006–0008.
Comment Date: 5 p.m. Eastern Time To Know?’’ was attached to the project
Federal Energy Regulatory
on Wednesday, October 25, 2006. notice Panhandle provided to
Commission
landowners. This fact sheet addresses a
Any person desiring to intervene or to
[Docket No. CP06–428–000] number of typically asked questions,
protest in any of the above proceedings
including the use of eminent domain
must file in accordance with Rules 211 Panhandle Eastern Pipeline Company, and how to participate in the
and 214 of the Commission’s Rules of LP; Notice of Intent To Prepare an Commission’s proceedings. It is
Practice and Procedure (18 CFR 385.211 Environmental Assessment for the available for viewing on the FERC
and § 385.214) on or before 5 p.m. Proposed Tuscola East Project and Internet Web site (http://www.ferc.gov).
Eastern time on the specified comment Request for Comments on
date. It is not necessary to separately Environmental Issues and Notice of Summary of the Proposed Project
intervene again in a subdocket related to Scoping Meeting Due to the age of Panhandle’s existing
a compliance filing if you have line and the Department of
previously intervened in the same October 11, 2006.
Transportation’s Integrity Management
docket. Protests will be considered by The staff of the Federal Energy
Plan regulations, Panhandle reduced the
the Commission in determining the Regulatory Commission (FERC or
operating pressure on one line by 20
appropriate action to be taken, but will Commission) will prepare an
percent in 2004. Additional measures to
not serve to make protestants parties to environmental assessment (EA) that will
mitigate risk for High Consequence
the proceeding. Anyone filing a motion discuss the environmental impacts of
Areas must be implemented by end of
to intervene or protest must serve a copy Panhandle Eastern Pipeline Company,
2011. Panhandle’s project purpose is to
of that document on the Applicant. In LP’s (Panhandle) planned Tuscola East
restore long-haul transportation capacity
reference to filings initiating a new Project located in Douglas County,
from Tuscola heading east to Michigan
proceeding, interventions or protests Illinois and Parke, Marion, Boone, and
by replacing the existing diameter
submitted on or before the comment Hamilton Counties, Indiana.1 This
pipeline with larger diameter pipeline.
deadline need not be served on persons notice announces the opening of the
In general, these facilities would consist
other than the Applicant. scoping process we will use to gather
of replacing about 31.3 miles of pipeline
The Commission encourages input from the public and interested
consisting of three segments and
electronic submission of protests and agencies on the project. Your input will
abandoning in place or by removal the
interventions in lieu of paper, using the help the Commission staff determine
existing 29.4 miles of pipelines that
FERC Online links at http:// which issues need to be evaluated in the
correspond with the new replacement
www.ferc.gov. To facilitate electronic EA. Please note that the scoping period
lines. Specifically, the project includes:
service, persons with Internet access will close on November 13, 2006. • Tuscola 100-Line (Douglas County,
who will eFile a document and/or be Comments may be submitted in
IL)—Replacing 6.7 miles of existing 100-
listed as a contact for an intervenor written form or presented verbally at the
Line 20-inch diameter pipeline with 36-
must create and validate an public meeting detailed below. Further
inch diameter pipeline, designating the
eRegistration account using the details on how to submit written
new pipeline as the 500-Line, and
eRegistration link. Select the eFiling comments are provided in the public
installing a new pig launcher/receiver;
link to log on and submit the participation section of this notice. In • Tuscola 200-Line (Douglas County,
intervention or protests. lieu of sending written comments, you IL)—Replacing 1.9 miles of the existing
Persons unable to file electronically are invited to attend the public scoping 200-Line 36-inch diameter pipeline with
should submit an original and 14 copies meeting that is scheduled as follows: 20-inch diameter pipeline (the 1.9 miles
of the intervention or protest to the Tuscola East Project of 36-inch pipeline replaced would be
Federal Energy Regulatory Commission, used for the new 500-Line);
Tuesday—October 24, 2006, 7 p.m.
888 First St. NE., Washington, DC • Montezuma 100-Line (Parke
(EST), VFW in Noblesville, 654 S 9th
20426. County, IN)—Replacing 6.6 miles of the
Street, Noblesville IN 46060. (317) 770–
The filings in the above proceedings existing 100-Line 20-inch diameter
3954.
are accessible in the Commission’s pipeline with 36-inch diameter
If you are a landowner receiving this
eLibrary system by clicking on the pipeline, designating the new pipeline
notice, you may be contacted by a
appropriate link in the above list. They as the 500-Line, and installing a new pig
pipeline company representative about
are also available for review in the launcher/receiver; and
sroberts on PROD1PC70 with NOTICES

the acquisition of an easement to


Commission’s Public Reference Room in • Zionsville 200-Line (Marion, Boone,
construct, operate, and maintain the
Washington, DC There is an and Hamilton Counties, IN)—Replacing
eSubscription link on the Web site that 1 Panhandle’s application was filed with the 18.0 miles of the existing 200-Line 24-
enables subscribers to receive e-mail Commission under section 7 of the Natural Gas Act inch diameter pipeline with 30-inch
notification when a document is added and Part 157 of the Commission’s regulations. diameter pipeline, designating the new

VerDate Aug<31>2005 06:27 Oct 17, 2006 Jkt 211001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\17OCN1.SGM 17OCN1
Federal Register / Vol. 71, No. 200 / Tuesday, October 17, 2006 / Notices 61045

pipeline as the 500-Line, and installing comments received are considered Public Participation
a new pig launcher/receiver. during the preparation of the EA. State You can make a difference by
The majority of all segments to be and local government representatives providing us with your specific
replaced would be abandoned by are encouraged to notify their comments or concerns about the project.
removal, and at stream, wetland, constituents of this proposed action and By becoming a commentor, your
pipeline crossovers, and uncased road encourage them to comment on their concerns will be addressed in the EA
crossing the pipeline would be areas of concern. and considered by the Commission. You
abandoned in place. Also 16 taps would In the EA, we 3 will discuss impacts should focus on the potential
be disconnected from the 100 and 200- that could occur as a result of the environmental effects of the proposal,
Lines and reconnection to the nearest construction and operation of the alternatives to the proposal (including
adjacent lines would be required in proposed project under these general
order to continue providing service. The alternative locations and/or routes), and
headings: measures to avoid or lessen
general locations of the project facilities • Geology and soils.
are shown in Appendix 1.2 • Land use. environmental impact. The more
• Water resources, fisheries, and specific your comments, the more useful
Land Requirements for Construction wetlands. they will be. Please carefully follow
Panhandle proposes to use a 125-foot • Cultural resources. these instructions to ensure that your
wide right-of-way, which would overlap • Vegetation and wildlife. comments are received in time and
its existing permanent right-of-way. • Air quality and noise. properly recorded:
However, a temporary construction • Endangered and threatened species. • Send an original and two copies of
right-of-way may be required. • Hazardous waste. your letter to: Magalie R. Salas,
Panhandle would first install the new • Public safety. Secretary, Federal Energy Regulatory
500-Line along each segment, and then We will also evaluate possible Commission, 888 First St., NE., Room
remove the 100- and 200-Lines from alternatives to the proposed project or 1A, Washington, DC 20426.
their respective rights-of-way. The new portions of the project, and make • Label one copy of the comments for
500-Line would be installed within the recommendations on how to lessen or the attention of Gas Branch 2.
existing rights-of-way of each segment avoid impacts on the various resource • Reference Docket No. CP06–428–
with a 25-foot offset from the existing areas. 000.
mainlines. Construction of the proposed Our independent analysis of the • Mail your comments so that they
facilities would require about 546.6 issues will be in the EA. Depending on will be received in Washington, DC on
acres of land. Following construction, the comments received during the or before November 13, 2006.
about 204.8 acres would be maintained scoping process, the EA may be Please note that the Commission
as permanent easement or aboveground published and mailed to Federal, state, strongly encourages electronic filing of
facility sites as part of Panhandle’s and local agencies, public interest any comments or interventions or
existing permanent rights-of-way. No groups, interested individuals, affected protests to this proceeding. See 18 CFR
additional permanent rights-of-way landowners, newspapers, libraries, and 385.2001(a)(1)(iii) and the instructions
would be required because the proposed the Commission’s official service list for on the Commission’s Web site at http://
project would be operated within this proceeding. A comment period will www.ferc.gov under the ‘‘e-Filing’’ link
existing Panhandle rights-of-way. The be allotted for review if the EA is and the link to the User’s Guide. Before
remaining 341.8 acres of land would be published. We will consider all you can file comments you will need to
restored and allowed to revert to its comments on the EA before we make create a free account which can be
former use. our recommendations to the created on-line.
Commission. We may mail the EA for comment. If
The EA Process To ensure your comments are you are interested in receiving it, please
The National Environmental Policy considered, please carefully follow the return the Information Request
Act (NEPA) requires the Commission to instructions in the public participation (Appendix 2). If you do not return the
take into account the environmental section below. Information Request, you will be taken
impacts that could result from an action off the mailing list.
Currently Identified Environmental
whenever it considers the issuance of a
Issues Becoming an Intervenor
Certificate of Public Convenience and
Necessity. NEPA also requires us to We have already identified several In addition to involvement in the EA
discover and address concerns the issues that we think deserve attention scoping process, you may want to
public may have about proposals. This based on a preliminary review of the become an official party to the
process is referred to as ‘‘scoping’’. The proposed facilities and the proceeding, or ‘‘intervenor’’. To become
main goal of the scoping process is to environmental information provided by an intervenor you must file a motion to
focus the analysis in the EA on the Panhandle. This preliminary list of intervene according to Rule 214 of the
important environmental issues. By this issues may be changed based on your Commission’s Rules of Practice and
Notice of Intent, the Commission staff comments and our analysis. Procedure (18 CFR 385.214). Intervenors
requests public comments on the scope Project-related impact on: have the right to seek rehearing of the
of the issues to address in the EA. All • Threatened and Endangered Commission’s decision. Motions to
Species; Intervene should be electronically
2 The appendices referenced in this notice are not • Noise impacts from construction submitted using the commission’s
being printed in the Federal Register. Copies of all activities and operations eFiling system at http://www.ferc.gov.
appendices, other than Appendix 1 (maps), are • Pipeline Safety and reliability; and
Persons without Internet access should
sroberts on PROD1PC70 with NOTICES

available on the Commission’s Web site at the • Residences or structures within 50


‘‘eLibrary’’ link or from the Commission’s Public send an original and 14 copies of their
Reference Room, 888 First Street, NE., Washington, feet of the construction work space.
motion to the Secretary of the
DC 20426, or call (202) 502–8371. For instructions
on connecting to eLibrary, refer to the last page of 3 ’’We’’, ‘‘us’’, and ‘‘our’’ refer to the Commission at the address indicated
this notice. Copies of the appendices were sent to environmental staff of the Office of Energy Projects previously. Persons filing Motions to
all those receiving this notice in the mail. (OEP). Intervene on or before the comment

VerDate Aug<31>2005 06:27 Oct 17, 2006 Jkt 211001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\17OCN1.SGM 17OCN1
61046 Federal Register / Vol. 71, No. 200 / Tuesday, October 17, 2006 / Notices

deadline indicated above must send a EventCalendar/EventsList.aspx along Lincoln People’s Utility District
copy of the motion to the Applicant. All with other related information. (CLPUD), has identified at least nine
filings, including late interventions, potential interconnections between the
Magalie R. Salas,
submitted after the comment deadline existing CLPUD near shore substations
must be served on the Applicant and all Secretary. on the power distribution grid and
other intervenors identified on the [FR Doc. E6–17199 Filed 10–16–06; 8:45 am] possible ‘‘wave energy park’’ locations
Commission’s service list for this BILLING CODE 6717–01–P off the coast of Lincoln County. A
proceeding. Persons on the service list Bonneville Power Administration (BPA)
with email addresses may be served substation in Toledo, Oregon can
electronically; others must be served a DEPARTMENT OF ENERGY distribute power beyond the county on
hard copy of the filing. Federal Energy Regulatory the electrical grid. Lincoln County’s
Affected landowners and parties with Commission project will comply with all
environmental concerns may be granted interconnection requirements as
intervenor status upon showing good Notice of Application Accepted for specified by CLPUD and BPA. In
cause by stating that they have a clear Filing and Soliciting Motions to addition, there are potentially other
and direct interest in this proceeding Intervene, Protests, and Comments connections including utilizing an
which would not be adequately existing outfall for a major power user
represented by any other parties. You do October 11, 2006. and possible interconnections with
not need intervenor status to have your Take notice that the following Pacific Power in the northern portion of
environmental comments considered. hydroelectric application has been filed Lincoln County.
with the Commission and is available Such wave parks have the potential of
Environmental Mailing List for public inspection: generating up to 20 megawatts (MW) of
An effort is being made to send this a. Type of Application: Preliminary power or more. Multiple sites would be
notice to all individuals, organizations, Permit. beneficial to the immediate area and to
and government entities interested in b. Project No: 12727–000. the Pacific Northwest in supplementing
and/or potentially affected by the c. Date filed: August 17, 2006. the region’s hydropower capacity and in
proposed project. This includes all d. Applicant: Lincoln County, Oregon. providing generation to the west of the
e. Name of Project: Lincoln County
landowners who are potential right-of- Cascade Mountain Range, thereby
Wave Energy Project.
way grantors, whose property may be f. Location: The project would be easing congestion on the east-west
used temporarily for project purposes, located in the Pacific Ocean in Lincoln transmission grid in region. While
or who own homes within distances County, Oregon. recognizing that wave energy will be an
defined in the Commission’s regulations g. Filed Pursuant to: Federal Power intermittent energy source, and mindful
of certain aboveground facilities. Act, 16 U.S.C. 791(a)–825(r). of integration needs, waves are far less
h. Applicant Contacts: Mr. Wayne intermittent than wind energy and are
Additional Information
Belmont, Lincoln County, Oregon, 225 predictable many hours ahead of their
Additional information about the W, Olive Street, Room 110, Newport, occurrence.
project is available from the OR 97365, phone: (541)–265–4108. Lincoln County will examine all the
Commission’s Office of External Affairs, i. FERC Contact: Robert Bell, (202) available wave power technologies for
at 1–866–208-FERC or on the FERC 502–6062. each location within the project
Internet Web site (http://www.ferc.gov) j. Deadline for filing comments, boundary. Lincoln County will work
using the eLibrary link. Click on the protests, and motions to intervene: 60 closely with Oregon State University as
eLibrary link, click on ‘‘General Search’’ days from the issuance date of this a leader in wave power development.
and enter the docket number excluding notice. All the alternative Wave Energy
the last three digits in the Docket The Commission’s Rules of Practice Conversion (WEC) devices capable of
Number field. Be sure you have selected and Procedure require all intervenors generating commercially viable energy
an appropriate date range. For filing documents with the Commission will be explored.
assistance, please contact FERC Online to serve a copy of that document on Lincoln County will seek investment
Support at FercOnlineSupport@ferc.gov each person in the official service list of available economic development
or toll free at 1–866–208–3676, or for for the project. Further, if an intervenor dollars to locate businesses to both
TTY, contact (202)502–8659. The files comments or documents with the support wave parks off our county
eLibrary link also provides access to the Commission relating to the merits of an shores and to create and test new
texts of formal documents issued by the issue that may affect the responsibilities technologies. The Port of Newport has
Commission, such as orders, notices, of a particular resource agency, they two deep-draft terminals for support
and rulemakings. must also serve a copy of the document vessels servicing the wave power parks.
In addition, the Commission now on that resource agency. Adequate industrial lands adjacent to
offers a free service called eSubscription k. Description of project: Oregon’s those terminals, with full infrastructure
which allows you to keep track of all offshore conditions present the most improvements including water, sewer,
formal issuances and submittals in optimal wave environment for and highways, are available to develop
specific dockets. This can reduce the extracting potential useful energy local wave park technology,
amount of time you spend researching according to the Electrical Power manufacturing, maintenance and repair
proceedings by automatically providing Research Institute (EPRI). The wave businesses. Oregon State University,
you with notification of these filings, energy project would be bounded on the which has launched an initiative to
document summaries and direct links to north and south by a 3-mile-long line, create the U.S. Ocean Wave Energy
sroberts on PROD1PC70 with NOTICES

the documents. Go to http:// on the east by the shoreline defined by Research, Development and
www.ferc.gov/esubscribenow.htm. the border of Lincoln County, and on Demonstration Center, maintains the
Finally, public meetings or site visits the west by a parallel line 3 miles Hatfield Marine Science Center on
will be posted on the Commission’s offshore. Within this area Lincoln Yaquina Bay in Newport, which could
calendar located at http://www.ferc.gov/ County together with the Central become a primary center for creating

VerDate Aug<31>2005 06:27 Oct 17, 2006 Jkt 211001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\17OCN1.SGM 17OCN1

Вам также может понравиться