Академический Документы
Профессиональный Документы
Культура Документы
______________________________________________________________________________________________________________________
Fecha :
25/04/13
Pgina :
Actividad
Vr.Mano de Obra
Vr.Total
M
M
M2
M2
M2
M2
HR
766.00
1,224.00
1,530.00
850.00
6,997.00
0.00
0.00
1,778.00
2,401.00
3,101.00
1,472.00
9,667.00
8,616.00
90,000.00
HR
0.00
120,000.00
M2
3,963.00
5,212.00
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
13,600.00
20,400.00
27,200.00
17,000.00
53,720.00
89,524.00
796.00
796.00
2,040.00
2,040.00
13,947.00
26,891.00
36,199.00
27,874.00
56,032.00
93,377.00
11,421.00
15,796.00
19,040.00
26,040.00
M3
M3
M3
5,780.00
7,225.00
39,108.00
61,780.00
94,725.00
294,438.00
M2
M2
M3
3,273.00
8,500.00
3,400.00
10,387.00
24,303.00
19,877.00
M3
8,507.00
47,273.00
M3
7,562.00
10,820.00
M3
6,188.00
45,715.00
M3
6,800.00
68,099.00
M3
9,071.00
78,838.00
M3
0.00
62,090.00
M
M
M2
680.00
850.00
3,618.00
6,484.00
8,122.00
6,256.00
M2
6,800.00
15,523.00
M2
12,745.00
17,383.00
M3
9,629.00
62,953.00
M3
19,271.00
109,513.00
U.M.
1 PRELIMINARES
1.1 Localizacin y replanteo para redes de acueducto
1.2 Localizacin y replanteo para redes de alcantarillado
1.3 Localizacin y replanteo para estructuras hidrulicas
1.4 Desmonte y limpieza en rastrojo
1.5 Descapote manual (incluye retiro d=5km)
1.6 Descapote mecnico (incluye retiro d=5km)
1.7 Ampliacin y mejoramiento de vas de acceso con
bulldozer
1.8 Control de ros mediante conformacin mecnica de
jarilln (inc. retroexcavadora orugada)
1.9 Acondicionamiento de superficies para
impermeabilizacin con membranas (limpieza con cepillo
metlico y pulidora)
2 EXCAVACIONES
2.1 Excavacin manual en conglomerado h < 1.50m
2.2 Excavacin manual en conglomerado 1.50m < h < 3.0m
2.3 Excavacin manual en conglomerado h > 3.0m
2.4 Excavacin manual en conglomerado hmedo h < 1.50m
2.5 Excavacin manual en roca h<1.5m
2.6 Excavacin manual en roca 1.5m < h < 3.0m
2.7 Excavacin mecnica en conglomerado h < 3.0m
2.8 Excavacin mecnica en conglomerado h > 3.0m
2.9 Excavacin mecnica en conglomerado hmedo h<3.0m
2.10 Excavacin mecnica en conglomerado hmedo
h>3.0m
2.11 Excavacin mecnica en roca h<3.0m
2.12 Excavacin mecnica en roca h>3.0m
2.13 Demolicin de roca con agente demoledor no expansivo
(incluye perforacin con compresor)
2.14 Entibado tipo 1 (formaleta madera 1/7 utilizaciones)
2.15 Entibado tipo 2 (formaleta madera 1/7 utilizaciones)
2.16 Retiro sobrantes de excavacin
3 RELLENOS
3.1 Arena para base de tubera (incluye cargue, acarreo y
compactacin)
3.2 Relleno material seleccionado proveniente de la
excavacin (incluye compactacin c/0.20m)
3.3 Relleno material seleccionado tamao mximo 2"
(incluye cargue, acarreo y compactacin c/0.20m)
3.4 Sub-base triturada tamao mximo 2" (incluye acarreo,
conformacin y compactacin c/0.30m)
3.5 Base triturada tamao mximo 1 1/2" (incluye acarreo,
conformacin y compactacin c/0.10m)
3.6 Afirmado en material seleccionado tamao mximo 2"
(incluye explote, cargue, acarreo y conformacin)
4 DEMOLICIONES
4.1 Corte de pavimento flexible
4.2 Corte de pavimento rigido
4.3 Demolicin de pavimento flexible (incluye retiro de
escombros)
4.4 Demolicin de pavimento rgido (incluye retiro de
escombros)
4.5 Demolicin manual de pisos y andenes (incluye retiro de
escombros)
4.6 Demolicin de tubera en concreto (incluye retiro de
escombros)
4.7 Demolicin de concreto reforzado (incluye retiro de
escombros)
Fecha :
25/04/13
Pgina :
Actividad
Vr.Mano de Obra
Vr.Total
M2
M2
M2
M3
M2
8,500.00
8,500.00
8,500.00
145,717.00
7,650.00
35,517.00
45,845.00
60,978.00
624,328.00
80,363.00
M2
7,650.00
100,389.00
2,765.00
24,292.00
3,366.00
34,839.00
4,329.00
50,992.00
5,057.00
74,150.00
5,693.00
84,754.00
6,057.00
112,635.00
7,586.00
145,744.00
10,114.00
180,768.00
9,925.00
301,362.00
13,233.00
379,924.00
15,875.00
442,639.00
19,825.00
510,169.00
23,800.00
698,633.00
26,442.00
949,960.00
29,750.00
1,019,854.00
34,010.00
1,201,514.00
34,010.00
1,511,168.00
39,675.00
1,636,268.00
39,675.00
1,713,461.00
39,675.00
1,828,848.00
39,675.00
1,993,901.00
47,600.00
2,206,500.00
UN
42,500.00
131,744.00
UN
46,750.00
174,313.00
UN
46,750.00
359,658.00
U.M.
5 PAVIMENTOS
5.1 Carpeta asfltica, e=0.05m (incluye imprimacin)
5.2 Carpeta asfltica, e=0.07m (incluye imprimacin)
5.3 Carpeta asfltica, e=0.10m (incluye imprimacin)
5.4 Pavimento asfltico (mezcla en caliente)
5.5 Pavimento rgido, concreto 3000 PSI elab. en obra
(e=0.15m)
5.6 Pavimento rgido, concreto 3000 PSI elab. en obra
(e=0.20m)
7 DOMICILIARIAS ALCANTARILLADO
7.1 Caja inspeccin 0.50x0.50m, concreto ref. 3000 PSI
elab.en obra, h=0.70m , e=0.07m (inc. excavacin, formaleta
1/3 usos)
7.2 Caja inspeccin 0.70x0.70m, concreto ref. 3000 PSI
elab.en obra, h=0.70m , e=0.07m (inc. excavacin, formaleta
1/3 usos)
7.3 Caja inspeccin 0.90x0.90m, concreto ref. 3000 PSI
elab.en obra, h=0.90m , e=0.10m (inc. excavacin, formaleta
1/3 usos)
Fecha :
25/04/13
Pgina :
Actividad
U.M.
Vr.Mano de Obra
Vr.Total
UN
7,789.00
98,952.00
UN
7,789.00
112,903.00
UN
7,789.00
188,163.00
UN
7,789.00
200,525.00
UN
9,350.00
281,314.00
UN
9,350.00
288,119.00
UN
9,350.00
231,214.00
UN
9,350.00
231,214.00
UN
11,688.00
278,640.00
UN
11,688.00
376,875.00
UN
7,789.00
98,952.00
UN
7,789.00
112,903.00
UN
7,789.00
188,163.00
UN
7,789.00
200,525.00
UN
9,350.00
281,314.00
UN
9,350.00
288,119.00
UN
9,350.00
231,214.00
UN
9,350.00
231,214.00
UN
11,688.00
278,640.00
UN
11,688.00
376,875.00
2,003.00
8,376.00
2,003.00
11,252.00
2,154.00
15,851.00
2,339.00
24,807.00
2,558.00
51,524.00
2,811.00
85,493.00
3,460.00
133,564.00
3,460.00
185,277.00
3,890.00
229,397.00
Fecha :
25/04/13
Pgina :
Actividad
U.M.
Vr.Mano de Obra
Vr.Total
4,668.00
300,430.00
5,341.00
384,873.00
6,238.00
478,762.00
7,473.00
705,286.00
2,003.00
7,328.00
2,003.00
9,763.00
2,154.00
13,614.00
2,339.00
21,136.00
2,558.00
42,739.00
2,811.00
70,904.00
3,460.00
109,402.00
3,460.00
152,571.00
3,890.00
189,451.00
4,668.00
250,636.00
5,341.00
320,550.00
6,238.00
412,083.00
7,473.00
596,390.00
2,154.00
11,404.00
2,339.00
17,457.00
2,558.00
35,418.00
2,811.00
58,462.00
3,460.00
90,400.00
3,460.00
125,706.00
Fecha :
25/04/13
Pgina :
Actividad
U.M.
Vr.Mano de Obra
Vr.Total
3,890.00
155,270.00
4,668.00
205,754.00
5,341.00
260,241.00
6,238.00
340,839.00
7,473.00
485,239.00
2,339.00
14,909.00
2,558.00
29,126.00
2,811.00
47,429.00
3,460.00
73,181.00
3,460.00
101,967.00
3,890.00
128,307.00
4,668.00
171,906.00
5,341.00
222,824.00
6,238.00
281,966.00
7,473.00
395,247.00
1,361.00
4,056.00
1,361.00
3,348.00
1,453.00
6,351.00
1,361.00
3,801.00
1,453.00
4,937.00
1,453.00
7,563.00
1,453.00
9,385.00
2,003.00
14,133.00
Fecha :
25/04/13
Pgina :
Actividad
U.M.
Vr.Mano de Obra
Vr.Total
2,003.00
22,621.00
2,154.00
29,489.00
2,339.00
49,926.00
2,003.00
12,147.00
2,003.00
4,165.00
2,154.00
24,935.00
2,339.00
7,897.00
2,154.00
4,848.00
2,339.00
7,897.00
2,339.00
7,897.00
UN
0.00
17,583.00
UN
0.00
22,573.00
UN
0.00
40,795.00
UN
0.00
78,276.00
UN
0.00
208,887.00
UN
0.00
496,221.00
UN
0.00
1,078,659.00
UN
0.00
1,463,907.00
UN
0.00
15,218.00
UN
0.00
17,370.00
UN
0.00
27,410.00
UN
0.00
55,526.00
UN
0.00
152,152.00
UN
0.00
329,977.00
UN
0.00
706,110.00
UN
0.00
991,078.00
UN
0.00
13,402.00
UN
0.00
18,802.00
UN
0.00
27,034.00
Fecha :
25/04/13
Pgina :
Actividad
U.M.
Vr.Mano de Obra
Vr.Total
8.85 Codo Gran Radio 22.5 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (4")
8.86 Codo Gran Radio 22.5 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (6")
8.87 Codo Gran Radio 22.5 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (8")
8.88 Codo Gran Radio 22.5 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (10")
8.89 Codo Gran Radio 22.5 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (12")
8.90 Codo Gran Radio 11.25 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (2")
8.91 Codo Gran Radio 11.25 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (2 1/2")
8.92 Codo Gran Radio 11.25 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (3")
8.93 Codo Gran Radio 11.25 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (4")
8.94 Codo Gran Radio 11.25 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (6")
8.95 Codo Gran Radio 11.25 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (8")
8.96 Codo Gran Radio 11.25 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (10")
8.97 Codo Gran Radio 11.25 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (12")
8.98 Codo Radio Corto 90 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (2")
8.99 Codo Radio Corto 90 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (3")
8.100 Codo Radio Corto 90 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (4")
8.101 Codo Radio Corto 90 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (6")
8.102 Codo Radio Corto 90 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (8")
8.103 Codo Radio Corto 45 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (3")
8.104 Codo Radio Corto 45 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (4")
8.105 Codo Radio Corto 45 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (6")
8.106 Codo Radio Corto 45 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (8")
8.107 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (2")
8.108 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (3")
8.109 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (4")
8.110 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (6")
8.111 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (8")
8.112 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (10")
8.113 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (12")
8.114 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (14")
8.115 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (16")
8.116 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (18")
8.117 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (20")
8.118 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (24")
UN
0.00
49,527.00
UN
0.00
121,628.00
UN
0.00
256,990.00
UN
0.00
575,195.00
UN
0.00
774,556.00
UN
0.00
13,359.00
UN
0.00
15,353.00
UN
0.00
24,655.00
UN
0.00
47,069.00
UN
0.00
108,819.00
UN
0.00
220,798.00
UN
0.00
470,802.00
UN
0.00
623,192.00
UN
0.00
68,433.00
UN
0.00
98,933.00
UN
0.00
169,094.00
UN
0.00
310,525.00
UN
0.00
605,508.00
UN
0.00
90,500.00
UN
0.00
154,561.00
UN
0.00
310,615.00
UN
0.00
605,508.00
UN
0.00
60,453.00
UN
0.00
88,326.00
UN
0.00
113,946.00
UN
0.00
303,729.00
UN
0.00
567,129.00
UN
0.00
1,046,673.00
UN
0.00
1,221,477.00
UN
0.00
1,701,863.00
UN
0.00
2,673,735.00
UN
0.00
3,076,529.00
UN
0.00
4,013,876.00
UN
0.00
6,458,975.00
Fecha :
25/04/13
Pgina :
Actividad
U.M.
Vr.Mano de Obra
Vr.Total
UN
0.00
73,213.00
UN
0.00
90,646.00
UN
0.00
102,346.00
UN
0.00
234,129.00
UN
0.00
541,609.00
UN
0.00
765,953.00
UN
0.00
943,077.00
UN
0.00
1,355,023.00
UN
0.00
2,010,215.00
UN
0.00
2,678,649.00
UN
0.00
3,876,996.00
UN
0.00
4,382,575.00
UN
0.00
58,133.00
UN
0.00
83,686.00
UN
0.00
129,026.00
UN
0.00
208,609.00
UN
0.00
342,089.00
UN
0.00
609,353.00
UN
0.00
1,009,197.00
UN
0.00
1,277,303.00
UN
0.00
1,678,455.00
UN
0.00
2,147,369.00
UN
0.00
2,952,476.00
UN
0.00
3,825,775.00
UN
0.00
52,333.00
UN
0.00
77,886.00
UN
0.00
102,346.00
UN
0.00
208,609.00
UN
0.00
342,089.00
UN
0.00
609,353.00
UN
0.00
876,957.00
UN
0.00
1,277,303.00
UN
0.00
1,678,455.00
UN
0.00
2,147,369.00
Fecha :
25/04/13
Pgina :
Actividad
U.M.
Vr.Mano de Obra
Vr.Total
8.153 Codo 11.25 en H.D. -Presin Trabajo 250PSIextremo lisos para PVC/AC (20")
8.154 Codo 11.25 en H.D. -Presin Trabajo 250PSIextremo lisos para PVC/AC (24")
8.155 Unin de reparacin PVC -Presin Trabajo 200PSIextremos unin mecnica x liso (2")
8.156 Unin de reparacin PVC -Presin Trabajo 200PSIextremos unin mecnica x liso (3")
8.157 Unin de reparacin PVC -Presin Trabajo 200PSIextremos unin mecnica x liso (4")
8.158 Unin de reparacin PVC -Presin Trabajo 200PSIextremos unin mecnica x liso (6")
8.159 Unin de reparacin PVC -Presin Trabajo 200PSIextremos unin mecnica x liso (8")
8.160 Unin de reparacin PVC -Presin Trabajo 200PSIextremos unin mecnica x liso (10")
8.161 Tee PVC -Presin Trabajo 200PSI- extremos unin
mecanica x liso (2x2x2")
8.162 Tee PVC -Presin Trabajo 200PSI- extremos unin
mecanica x liso (3x2x2")
8.163 Tee PVC -Presin Trabajo 200PSI- extremos unin
mecanica x liso (3x2x3")
8.164 Tee PVC -Presin Trabajo 200PSI- extremos unin
mecanica x liso (3x3x3")
8.165 Tee PVC -Presin Trabajo 200PSI- extremos unin
mecanica x liso (4x2x4")
8.166 Tee HD -Presin Trabajo 250PSI- extremos lisos para
PVC/AC (6x3")
8.167 Tee HD -Presin Trabajo 250PSI- extremos lisos para
PVC/AC (6x4")
8.168 Tee HD -Presin Trabajo 250PSI- extremos lisos para
PVC/AC (6x6")
8.169 Tee HD -Presin Trabajo 250PSI- extremos lisos para
PVC/AC (8x3")
8.170 Tee HD -Presin Trabajo 250PSI- extremos lisos para
PVC/AC (8x4")
8.171 Tee HD -Presin Trabajo 250PSI- extremos lisos para
PVC/AC (8x6")
8.172 Tee HD -Presin Trabajo 250PSI- extremos lisos para
PVC/AC (8x8")
8.173 Tee HD -Presin Trabajo 250PSI- extremos lisos para
PVC/AC (10x2")
8.174 Tee HD -Presin Trabajo 250PSI- extremos lisos para
PVC/AC (10x6")
8.175 Tee HD -Presin Trabajo 250PSI- extremos lisos para
PVC/AC (10x10")
8.176 Tee HD -Presin Trabajo 250PSI- extremos lisos para
PVC/AC (16x6")
8.177 Tee HD -Presin Trabajo 250PSI- extremos lisos para
PVC/AC (16x10")
8.178 Tapn en H.D. -Presin Trabajo 250PSI- para PVC/AC
(2")
8.179 Tapn en H.D. -Presin Trabajo 250PSI- para PVC/AC
(3")
8.180 Tapn en H.D. -Presin Trabajo 250PSI- para PVC/AC
(6")
8.181 Cruceta en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (2x2")
8.182 Cruceta en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (3x2")
8.183 Cruceta en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (3x3")
8.184 Reduccin en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (3x2")
8.185 Reduccin en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (4x2")
8.186 Reduccin en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (4x3")
UN
0.00
2,952,476.00
UN
0.00
3,521,855.00
UN
0.00
15,506.00
UN
0.00
25,493.00
UN
0.00
43,797.00
UN
0.00
100,642.00
UN
0.00
184,851.00
UN
0.00
315,540.00
UN
0.00
24,358.00
UN
0.00
41,102.00
UN
0.00
46,584.00
UN
0.00
54,497.00
UN
0.00
75,488.00
UN
0.00
261,885.00
UN
0.00
307,125.00
UN
0.00
366,285.00
UN
0.00
512,888.00
UN
0.00
584,808.00
UN
0.00
613,808.00
UN
0.00
659,048.00
UN
0.00
665,511.00
UN
0.00
877,791.00
UN
0.00
1,129,511.00
UN
0.00
2,427,223.00
UN
0.00
2,644,143.00
UN
0.00
34,800.00
UN
0.00
35,960.00
UN
0.00
192,560.00
UN
0.00
106,720.00
UN
0.00
119,480.00
UN
0.00
147,320.00
UN
0.00
54,245.00
UN
0.00
62,365.00
UN
0.00
90,205.00
Fecha :
25/04/13
Pgina :
10
Actividad
U.M.
Vr.Mano de Obra
Vr.Total
UN
0.00
178,745.00
UN
0.00
302,649.00
UN
28,056.00
447,811.00
UN
28,056.00
600,076.00
UN
33,660.00
712,232.00
UN
42,075.00
1,185,159.00
UN
56,094.00
1,697,468.00
UN
56,094.00
3,285,813.00
UN
13,090.00
42,634.00
UN
32,725.00
63,085.00
UN
32,725.00
82,805.00
UN
32,725.00
82,805.00
UN
43,629.00
156,802.00
UN
84,150.00
4,638,655.00
UN
84,150.00
5,568,975.00
UN
112,206.00
7,145,166.00
UN
42,075.00
275,062.00
UN
42,075.00
409,622.00
UN
42,075.00
577,579.00
UN
42,075.00
828,139.00
UN
42,075.00
903,215.00
UN
42,075.00
1,092,359.00
UN
130,900.00
1,881,258.00
UN
130,900.00
2,735,946.00
UN
196,350.00
3,493,643.00
UN
196,350.00
4,694,011.00
UN
84,150.00
2,387,867.00
1,361.00
5,005.00
28,056.00
113,003.00
9 DOMICILIARIAS ACUEDUCTO
9.1 Acometida domic. acued. 2x1/2" (inc. sumin. e instal.
manguera 10m, accesorios, registro corte y cajilla)
UN
Fecha :
25/04/13
Pgina :
11
Actividad
U.M.
Vr.Mano de Obra
Vr.Total
UN
28,056.00
113,438.00
UN
28,056.00
116,527.00
UN
28,056.00
117,997.00
UN
28,056.00
121,332.00
UN
33,660.00
147,295.00
UN
33,660.00
214,625.00
M3
59,500.00
452,250.00
M3
95,200.00
543,783.00
M3
95,200.00
556,148.00
M3
34,000.00
450,539.00
M3
34,000.00
481,626.00
M3
95,200.00
589,254.00
M3
95,200.00
617,920.00
M3
95,200.00
669,948.00
M3
95,200.00
589,254.00
M3
95,200.00
617,920.00
M3
95,200.00
669,948.00
M3
191,250.00
771,330.00
M3
229,500.00
863,389.00
M3
306,000.00
961,002.00
M3
357,000.00
1,051,689.00
M3
408,000.00
1,142,377.00
M3
191,250.00
800,695.00
M3
229,500.00
892,754.00
M3
306,000.00
990,367.00
M3
357,000.00
1,081,054.00
M3
408,000.00
1,171,742.00
M3
191,250.00
853,992.00
M3
229,500.00
946,051.00
10 CONCRETOS Y MORTEROS
10.1 Concreto 2000 PSI para solados, elab. en obra (inc.
formaleta 1/4 usos y colocacin)
10.2 Concreto 3000 PSI para placa piso, elab. en obra (inc.
formaleta 1/4 usos y colocacin)
10.3 Concreto impermeab. 3000 PSI para placa piso, elab.
en obra (inc. formaleta 1/4 usos y colocacin)
10.4 Concreto 2500 PSI para atraque de tubera (formaleta
1/3 usos)
10.5 Concreto 3000 PSI para atraque de tubera (formaleta
1/3 usos)
10.6 Concreto 3000 PSI para zapatas, elab. en obra (inc.
formaleta 1/4 usos y colocacin)
10.7 Concreto 3500 PSI para zapatas, elab. en obra (inc.
formaleta 1/4 usos y colocacin)
10.8 Concreto 4000 PSI para zapatas, elab. en obra (inc.
formaleta 1/4 usos y colocacin)
10.9 Concreto 3000 PSI para vigas de cimentacin, elab. en
obra (inc. formaleta 1/4 usos y colocacin)
10.10 Concreto 3500 PSI para vigas de cimentacin, elab.
en obra (inc. formaleta 1/4 usos y colocacin)
10.11 Concreto 4000 PSI para vigas de cimentacin, elab.
en obra (inc. formaleta 1/4 usos y colocacin)
10.12 Concreto 3000 PSI para columnas, elab. en obra,
elevaciones h<3.0m (inc. formaleta 1/4 usos y colocacin)
10.13 Concreto 3000 PSI para columnas, elab. en obra,
elevaciones 3.0<h<6.0 m (inc. formaleta 1/4 usos y
colocacin)
10.14 Concreto 3000 PSI para columnas, elab. en obra,
elevaciones 6.0<h<12.0 m (inc. formaleta 1/4 usos y
colocacin)
10.15 Concreto 3000 PSI para columnas, elab. en obra,
elevaciones 12.0<h<18.0 m (inc. formaleta 1/4 usos y
colocacin)
10.16 Concreto 3000 PSI para columnas, elab. en obra,
elevaciones 18.0<h<24.0 m (inc. formaleta 1/4 usos y
colocacin)
10.17 Concreto 3500 PSI para columnas, elab. en obra,
elevaciones h<3.0m (inc. formaleta 1/4 usos y colocacin)
10.18 Concreto 3500 PSI para columnas, elab. en obra,
elevaciones 3.0<h<6.0 m (inc. formaleta 1/4 usos y
colocacin)
10.19 Concreto 3500 PSI para columnas, elab. en obra,
elevaciones 6.0<h<12.0 m (inc. formaleta 1/4 usos y
colocacin)
10.20 Concreto 3500 PSI para columnas, elab. en obra,
elevaciones 12.0<h<18.0 m (inc. formaleta 1/4 usos y
colocacin)
10.21 Concreto 3500 PSI para columnas, elab. en obra,
elevaciones 18.0<h<24.0 m (inc. formaleta 1/4 usos y
colocacin)
10.22 Concreto 4000 PSI para columnas, elab. en obra,
elevaciones h<3.0m (inc. formaleta 1/4 usos y colocacin)
10.23 Concreto 4000 PSI para columnas, elab. en obra,
elevaciones 3.0<h<6.0 m (inc. formaleta 1/4 usos y
colocacin)
Fecha :
25/04/13
Pgina :
12
Actividad
U.M.
Vr.Mano de Obra
Vr.Total
M3
306,000.00
1,043,664.00
M3
357,000.00
1,134,351.00
M3
408,000.00
1,225,039.00
M3
229,500.00
925,926.00
M3
267,750.00
984,345.00
M3
357,000.00
1,114,226.00
M3
408,000.00
1,204,914.00
M3
459,000.00
1,295,602.00
M3
229,500.00
955,291.00
M3
267,750.00
1,013,710.00
M3
357,000.00
1,143,591.00
M3
408,000.00
1,234,279.00
M3
459,000.00
1,324,967.00
M3
229,500.00
938,593.00
M3
267,750.00
997,012.00
M3
357,000.00
1,126,893.00
M3
408,000.00
1,217,581.00
M3
459,000.00
1,308,269.00
M3
191,250.00
881,533.00
M3
229,500.00
946,352.00
M3
306,000.00
1,075,965.00
M3
357,000.00
1,179,452.00
M3
408,000.00
1,282,940.00
M3
191,250.00
910,898.00
Fecha :
25/04/13
Pgina :
13
Actividad
U.M.
Vr.Mano de Obra
Vr.Total
M3
229,500.00
975,717.00
M3
306,000.00
1,105,330.00
M3
357,000.00
1,208,817.00
M3
408,000.00
1,312,305.00
M3
191,250.00
964,195.00
M3
229,500.00
1,029,014.00
M3
306,000.00
1,158,627.00
M3
357,000.00
1,262,114.00
M3
408,000.00
1,365,602.00
M3
191,250.00
894,200.00
M3
229,500.00
959,019.00
M3
306,000.00
1,088,632.00
M3
357,000.00
1,192,119.00
M3
408,000.00
1,295,607.00
M3
191,250.00
925,606.00
M3
229,500.00
990,425.00
M3
306,000.00
1,120,038.00
M3
357,000.00
1,223,525.00
M3
408,000.00
1,327,013.00
M3
191,250.00
981,354.00
M3
229,500.00
1,046,173.00
M3
306,000.00
1,175,786.00
M3
357,000.00
1,279,273.00
Fecha :
25/04/13
Pgina :
14
Actividad
U.M.
Vr.Mano de Obra
Vr.Total
M3
408,000.00
1,382,761.00
M3
229,500.00
910,522.00
M3
267,750.00
966,840.00
M3
357,000.00
1,083,921.00
M3
408,000.00
1,161,809.00
M3
459,000.00
1,237,736.00
M3
229,500.00
943,627.00
M3
267,750.00
995,646.00
M3
357,000.00
1,112,727.00
M3
408,000.00
1,190,615.00
M3
459,000.00
1,266,542.00
M3
510,000.00
1,339,105.00
M3
229,500.00
962,269.00
M3
267,750.00
1,047,928.00
M3
357,000.00
1,165,009.00
M3
408,000.00
1,242,897.00
M3
459,000.00
1,318,824.00
M3
229,500.00
927,247.00
M3
267,750.00
979,266.00
M3
357,000.00
1,096,347.00
M3
408,000.00
1,174,235.00
M3
459,000.00
1,250,162.00
M3
229,500.00
958,056.00
M3
267,750.00
1,010,075.00
M3
357,000.00
1,127,156.00
Fecha :
25/04/13
Pgina :
15
Actividad
U.M.
Vr.Mano de Obra
Vr.Total
M3
408,000.00
1,205,044.00
M3
459,000.00
1,280,971.00
M3
229,500.00
1,012,741.00
M3
267,750.00
1,064,760.00
M3
357,000.00
1,181,841.00
M3
408,000.00
1,259,729.00
M3
459,000.00
1,335,656.00
M3
76,500.00
344,516.00
M3
168,300.00
573,569.00
M2
3,182.00
11,980.00
M2
M2
M2
M
11,900.00
11,900.00
7,937.00
1,700.00
17,363.00
19,855.00
18,051.00
31,238.00
UN
59,500.00
438,806.00
UN
59,500.00
574,933.00
UN
59,500.00
711,060.00
76,500.00
578,758.00
95,625.00
691,497.00
95,625.00
785,113.00
UN
119,000.00
570,292.00
UN
119,000.00
665,182.00
UN
119,000.00
760,073.00
UN
119,000.00
1,113,692.00
UN
119,000.00
1,208,582.00
UN
119,000.00
1,303,473.00
UN
119,000.00
962,735.00
11 POZOS DE INSPECCION
11.1 Placa Circular Base - Pozo Inspeccin D=1.20m
(concreto f'c = 28MPa reforz. elab. en obra, e=0.20m)
11.2 Placa Circular Base - Pozo Inspeccin D=1.50m
(concreto f'c = 28MPa reforz. elab. en obra, e=0.20m)
11.3 Placa Circular Base - Pozo Inspeccin D=1.80m
(concreto f'c = 28MPa reforz. elab. en obra, e=0.20m)
11.4 Cilindro pozo inspeccin D=1.20m (concreto
impermeab. f'c =28MPa elab. en obra, e=0.20m, incluye
escalera gato var.#6)
11.5 Cilindro pozo inspeccin D=1.50m (concreto
impermeab. f'c =28MPa elab. en obra, e=0.20m, incluye
escalera gato var.#6)
11.6 Cilindro pozo inspeccin D=1.80m (concreto
impermeab. f'c =28MPa elab. en obra, e=0.20m, incluye
escalera gato var.#6)
11.7 Placa cubierta - pozo inspeccin D=1.20m (concreto
f'c=28MPa reforz. elab. obra, e=0.20m, inc. arotapa/base
traf_pesado)
11.8 Placa cubierta - pozo inspeccin D=1.50m (concreto
f'c=28MPa reforz. elab. obra, e=0.20m, inc. arotapa/base
traf_pesado)
11.9 Placa cubierta - pozo inspeccin D=1.80m (concreto
f'c=28MPa reforz. elab. obra, e=0.20m, inc. arotapa/base
traf_pesado)
11.10 Placa cubierta - pozo inspeccin D=1.20m (concreto
f'c=28MPa reforz. elab. obra, e=0.20m, inc. tapa HD sist.
seguridad)
11.11 Placa cubierta - pozo inspeccin D=1.50m (concreto
f'c=28MPa reforz. elab. obra, e=0.20m, inc. tapa HD sist.
seguridad)
11.12 Placa cubierta - pozo inspeccin D=1.80m (concreto
f'c=28MPa reforz. elab. obra, e=0.20m, inc. tapa HD sist.
seguridad)
11.13 Placa cubierta - pozo inspeccin D=1.20m (concreto
f'c=28MPa reforz. elab. obra, e=0.20m, inc. tapa polipropileno
sist. seguridad)
Fecha :
25/04/13
Pgina :
16
Actividad
U.M.
Vr.Mano de Obra
Vr.Total
UN
119,000.00
1,057,625.00
UN
119,000.00
1,152,516.00
UN
8,500.00
140,481.00
UN
8,500.00
176,424.00
UN
11,332.00
251,205.00
UN
17,000.00
328,886.00
42,500.00
277,154.00
56,670.00
397,894.00
56,670.00
504,622.00
93,500.00
713,979.00
UN
1,071,000.00
10,553,642.00
UN
688,500.00
5,674,007.00
UN
42,500.00
756,971.00
229,500.00
959,639.00
229,500.00
1,273,023.00
UN
306,000.00
1,921,801.00
UN
535,500.00
3,301,863.00
UN
841,500.00
5,135,174.00
0.00
943,000.00
81,600.00
292,834.00
M2
23,062.00
94,511.00
M2
M2
0.00
0.00
78,178.00
88,063.00
0.00
29,998.00
M2
15,300.00
49,713.00
HR
4,250.00
8,231.00
12 SUMIDEROS
12.1 Sumidero aguas lluvias en concreto 3000PSI reforzado
elab. obra, e=0.20m, sec 0.5*0.6m, rejilla en perfil U
3x1.1/2x1/4"
12.2 Sumidero aguas lluvias en concreto 3000PSI reforzado
elab. obra,e=0.20m, sec 1.0*1.0m, rejilla en perfil U
3x1.1/2x1/4"
13 CABEZALES DE DESCARGA
13.1 Construccion cabezal descarga concreto reforzado
3500 PSI, muros, cuerpo, aletas y disip.energia e=0.25m, tub.
8" a 20"
13.2 Construccion cabezal descarga concreto reforzado
3500 PSI, muros, cuerpo, aletas y disip.energia e=0.25m, tub.
24" a 39"
13.3 Construccion cabezal descarga concreto reforzado
3500 PSI, muros, cuerpo, aletas y disip.energia e=0.25m, tub.
42" a 60"
14 TANQUE DE ALMACENAMIENTO
14.1 Montaje de andamios para acceso a tanque elevado y
trabajo en altura, h>20m (2 torres x 16 secciones)
14.2 Escalera tipo gato tanq.elev. (parales ang.2+1/2"x1/4",
paso c/0.30m tub3/4", platin.arc.2"x1/4", 6platin.1+1/4"x3/16")
14.3 Suministro y aplicacin de membrana a base de PVC
plastificado y reforz. c/armadura de polister (contacto agua
potable)
MES
15 OBRAS ARQUITECTONICAS
15.1 Muro en ladrillo prensado a la vista tipo Santaf 0.12
15.2 Mdulo en malla eslabonada con tubo galvanizado de
2" c/2.5m, incluye tapas, ngulos y platinas.
15.3 Alfaja en concreto de 3000 PSI, a=0.20m, e=0.07m,
incluye refuerzo long. 2D1/2" + flejes D3/8"
15.4 Teja termoacstica (incluye suministro e instalacin)
Fecha :
25/04/13
Pgina :
17
Actividad
U.M.
HR
Vr.Mano de Obra
Vr.Total
4,250.00
13,461.00
1,020,000.00
9,874,800.00
M3
19,837.00
109,272.00
KG
706.00
3,729.00
KG
988.00
4,045.00
KG
1,083.00
4,173.00
KG
1,190.00
4,353.00
KG
1,321.00
4,572.00
KG
1,488.00
4,851.00
KG
1,581.00
11,626.00
1,994.00
2,657.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
114,750.00
400,510.00
346,919.00
370,904.00
412,574.00
383,694.00
330,914.00
259,115.00
479,236.00
428,477.00
442,485.00
495,578.00
689,032.00
MES
17 ACERO DE REFUERZO
17.1 Acero de refuerzo 60.000 PSI (incluye amarre y
figuracin)
17.2 Acero de refuerzo 60.000 PSI, elevaciones h<3.0m
(incluye amarre y figuracin)
17.3 Acero de refuerzo 60.000 PSI, elevaciones 3.0<h<6.0m
(incluye amarre y figuracin)
17.4 Acero de refuerzo 60.000 PSI, elevaciones
6.0<h<12.0m (incluye amarre y figuracin)
17.5 Acero de refuerzo 60.000 PSI, elevaciones
12.0<h<18.0m (incluye amarre y figuracin)
17.6 Acero de refuerzo 60.000 PSI, elevaciones
18.0<h<24.0m (incluye amarre y figuracin)
17.7 Fabricacin, transporte, montaje y pintura de estructura
metlica en acero estructural ASTM A-36
18 ACTIVIDADES COMPLEMENTARIAS
18.1 Levantamiento topogrfico redes de acueducto y
alcantarillado para actualiz. de catastro (inc. planos rcord y
formatos)
ANALISIS ANIDADOS
Concreto simple 3000 PSI
Concreto simple 2000 PSI
Concreto simple 2500 PSI
Concreto impermeabilizado 3000 PSI
Mortero 1:3 impermeabilizado
Mortero 1:3
Mortero 1:5 para pega
Concreto simple 4000 PSI
Concreto simple 3500 PSI
Concreto impermeabilizado 3500 PSI
Concreto impermeabilizado 4000 PSI
Concreto ciclpeo (60% concreto simple 3000 PSI + 40%
piedra media zonga, incluye colocacin)
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3