Вы находитесь на странице: 1из 3

51786

Proposed Rules Federal Register


Vol. 71, No. 169

Thursday, August 31, 2006

This section of the FEDERAL REGISTER Safety and Safeguards, U.S. Nuclear during the normal application and use of this
contains notices to the public of the proposed Regulatory Commission, Washington, technology.
issuance of rules and regulations. The DC 20555–0001, telephone (301) 415– The petitioner offered the following
purpose of these notices is to give interested 7900, e-mail: tmt@nrc.gov. rationale in support of the petition: (1)
persons an opportunity to participate in the
rule making prior to the adoption of the final SUPPLEMENTARY INFORMATION: The ‘‘environmental and quality of life
rules. benefits’’ derived from the application
The Petition of this technology are ‘‘currently
On October 15, 2003, (68 FR 59346), enjoyed by the citizens of Japan.’’ The
NUCLEAR REGULATORY the NRC published a notice of receipt of petitioner stated that this technology is
COMMISSION a petition for rulemaking filed by proposed for license in China as a way
Terrence O. Hee, Ion Technology. The to reduce air pollution; (2)
10 CFR Part 40 Implementation of these devices can
petitioner requested that the NRC
[Docket No. PRM–40–29] amend its regulations in 10 CFR 40.13, reduce the cost of air emissions
‘‘Unimportant quantities of source pollution control to U.S. industry over
Terrence O. Hee, Ion Technology; material,’’ to exempt end users from the cost of current methods, thus
Denial of Petition for Rulemaking NRC’s regulatory requirements to the enhancing the ability of industry to
extent that such person receives, meet strict air emission standards; (3)
AGENCY: U.S. Nuclear Regulatory Workers involved with the devices will
Commission. possesses, uses or transfers, any
patented catalytic device containing be protected from the low levels of
ACTION: Denial of petition for radiation exposure by a metal housing
thorium.
rulemaking. encasing the thorium-bearing material;
The petitioner stated that the device
(4) The devices are manufactured in
SUMMARY: The U.S. Nuclear Regulatory is part of a ‘‘new technology for the
Japan, so no U.S. workers will have
Commission (NRC) is denying a petition reduction of air pollution chemicals’’
direct contact with the thorium-bearing
for rulemaking (PRM–40–29) submitted produced by mobile and industrial
material; and (5) The long-term effect on
by Terrence O. Hee, Ion Technology. combustion processes and that granting
the environment would be ‘‘reduced
The petitioner requested that the NRC his petition would contribute to the
emissions of air pollutants from mobile
amend its regulations regarding reduction in air pollution. Mr. Hee also
and stationary combustion sources.’’
unimportant quantities of source identified his monetary interest, as his
The petitioner also stated that the
material to exempt end users of a company has secured distribution rights
device ‘‘could also lead to a reduction
catalytic device containing thorium for this patented catalytic device in the
in the volume of hydrocarbon fuels
from the NRC’s licensing requirements. United States.
used.’’ In addition, the petitioner
ADDRESSES: Publicly available The petitioner asserts that there are explained that the public is protected by
documents related to this petition may potentially millions of users for this housings shielding the radiation-
be viewed electronically on the public device, and that obtaining ‘‘an emitting material, and that the housings
computers located at the NRC’s Public individual license for each application are designed not to be ‘‘readily
Document Room (PDR), O1–F21, One would prove to be burdensome for the disassembled by the curious.’’
White Flint North, 11555 Rockville state agencies issuing the individual The petitioner stated the product will
Pike, Rockville, Maryland. The PDR licenses and to those wishing to use the have warning labels which instruct
reproduction contractor will copy devices.’’ The petitioner requested an users in the proper disposal method,
documents for a fee. Selected exemption in 10 CFR 40.13(c) for his which is only by return of the product
documents, including comments, may product, a catalytic device containing to the distributor. The petitioner
be viewed and downloaded thorium. Thorium is a type of source anticipated that these labels would
electronically via the NRC rulemaking material licensed by the NRC. The prevent long-term negative effects on
Web site at: http://ruleforum.llnl.gov. exemptions in 10 CFR 40.13(c) apply to the environment. The petitioner noted
The NRC maintains an Agencywide the end user, who is exempt from the that disposal instructions would also be
Document Access and Management licensing requirements set forth in in the ‘‘Material Safety Data Sheet’’
System (ADAMS), which provides text section 62 of the Atomic Energy Act. delivered with each device. The
and image files of NRC’s public The petitioner suggested the following petitioner projects the product to have
documents. These documents may be language be added to 10 CFR 40.13(c) a 30-year life cycle, and expected no
accessed through the NRC’s Public for the requested exemption: short-term negative effects on the
Electronic Reading Room on the Internet Any patented catalyst used in the environment from disposal of the
at http://www.nrc.gov/reading-rm/ treatment of fuel, gas or air streams for devices. The petitioner believes that the
adams.html. If you do not have access combustion processes, or other processes product is a safe and cost-effective
to ADAMS or if there are problems in provided that the thorium content does not method for contributing to the reduction
accessing the documents located in exceed 6 percent by weight. The weight of air pollution chemicals in the air in
erjones on PROD1PC72 with PROPOSALS

ADAMS, contact the NRC PDR percentage to be calculated for either a


the United States and claims that it
Reference staff at: 1–800–397–4209, homogeneous mixture or as a coating on a
substrate base, with the base and the coating poses no adverse risk to the public or to
301–415–4737, or by e-mail to: workers involved in installing or
pdr@nrc.gov. being considered the same as a homogeneous
mixture, and the finished product is removing the devices.
FOR FURTHER INFORMATION CONTACT: constructed in a manner that will prevent the The petitioner stated that Honda
Torre Taylor, Office of Nuclear Material exposure of the public to any radiation Motor Company is currently installing

VerDate Aug<31>2005 12:18 Aug 30, 2006 Jkt 208001 PO 00000 Frm 00001 Fmt 4702 Sfmt 4702 E:\FR\FM\31AUP1.SGM 31AUP1
Federal Register / Vol. 71, No. 169 / Thursday, August 31, 2006 / Proposed Rules 51787

the technology as a factory-installed descriptions and drawings that clearly proposed amendment to the regulations
device on their diesel-powered vehicles, illustrate the components of the that limited the exemption to ‘‘Any
and claims use of this technology in product, materials of construction, patented catalyst * * *’’ It is not NRC’s
Japan has demonstrated a reduction of dimensions, assembly methods, source practice to authorize exemptions that
air pollution chemicals and a reduction containment and shielding, operation of are limited to a certain patented device/
in fuel consumption. The petitioner the product and tamper resistance. NRC product. If NRC determined that a
submitted test data showing reductions also needs to review prototype testing catalytic device containing thorium was
of soot emissions after installation of the that demonstrates the integrity of the appropriate for distribution to persons
device on diesel bus engines on the product during normal use and likely exempt from licensing and regulatory
Okayama Bus Line company and a accident conditions (physical testing, requirements, the exemption would
Caterpillar/Mitsubishi diesel-powered engineering analysis, or operational authorize distribution of such a device/
shovel. The petitioner also submitted history). A quality assurance program is product, regardless of the manufacturer
data showing reductions in nitrogen also needed to ensure that the product or patent status. Therefore, anyone that
oxides, carbon monoxide, and will be manufactured and distributed in developed a catalytic device that met
hydrocarbons for a 1989 gasoline-fueled accordance with the information the required criteria and any technical
Mercedes Benz, and similar data for a provided in the application. and licensing requirements for the
1998 Mitsubishi van. The petitioner also This information was not provided by exemption would be authorized to
presented ‘‘fuel usage reduction the petitioner, or was not of sufficient distribute that device/product.
examples’’ comparing various makes detail for NRC to conduct a thorough Because the petitioner is requesting
and models of vehicles before and after evaluation. For example, while the an amendment to add an exemption in
installation of the catalytic device. petitioner provided a description and 10 CFR 40.13(c), an environmental
The petitioner believes that the drawings of the catalytic device, NRC report is required in accordance with 10
proposed change to the Commission’s could not determine the exact materials CFR 51.68. Section 51.68,
regulations to allow the use of catalytic of construction, assembly methods, ‘‘Environmental report—rulemaking,’’
devices containing thorium in the source containment and shielding, requires petitioners for rulemaking
United States is appropriate because it operation of the product and tamper requesting amendments of certain parts
will benefit citizens by increasing the resistance features. Prototype testing, of the regulations concerning
efficiency of combustion processes, both methodology and results, was not exemptions from licensing and
reducing the use of hydrocarbon fuels, submitted. Additionally, the petition regulatory requirements of any device,
and lowering air pollutant emissions. did not include any information commodity or other product containing
The petitioner concludes that this regarding a quality assurance program. source material to submit with the
technology poses no hazard to users or The petition did not contain support petition a separate ‘‘Petitioner’s
the public. for all uses of the device requested in Environmental Report.’’ The purpose of
the petition (i.e., buses and industrial an environmental review is to identify
Public Comments on the Petition facilities). NRC could not determine the and evaluate the potential
The notice of receipt of the petition actual isotope of thorium or the amount environmental impacts associated with
for rulemaking invited interested of thorium to be used in the device, as a request. NRC’s evaluation relies on
persons to submit comments. The different percentages by weight information provided by the petitioner,
comment period closed on December concentrations were given in different as well as staff’s own independent
29, 2003. NRC did not receive any sections of the information provided. assessment. As part of the
comments on the petition. The petitioner provided statements on environmental review, several issues are
the benefit of catalytic converting evaluated: (1) Why is the action
Reasons for Denial devices to substantially reduce air proposed and what need will it meet; (2)
The petition is being denied because pollution chemicals. However, there How can the need be met; and (3) What
the petitioner did not submit was no data to support the results aspects of the environment would be
information of sufficient scope and provided. Additionally, there was not impacted? Alternatives to a proposed
depth for NRC to find that authorizing enough detailed information to support action are also evaluated. Radiological
this exemption would adequately the claim that the metal housing and non-radiological impacts, as well as
ensure protection of public health and enclosure which prevents access to direct, indirect, and cumulative impacts
safety and the environment. radioactive material is sufficient are part of this environmental review.
The NRC staff evaluated the technical protection from radiation exposure. Staff requested an environmental report
merits of the petition for: (1) The There were statements that the device is from the petitioner by letter dated May
appropriateness of this product for designed for a 30 year working life, with 12, 2004. The environmental report was
distribution to persons exempt from no repair. However, information was submitted by the petitioner in January
licensing and regulatory requirements; provided regarding 5, 10, and 15 year 2005.
(2) Whether public health and safety maintenance cycles with no description This report failed to include detailed
would be adequately protected; and (3) of what the maintenance involves. information related to: (1) Testing
The potential environmental impacts. The petitioner provided a description conditions and supporting data to
After reviewing the petition, NRC has of the worst case scenario for an evaluate the short-term and long-term
determined that there are unresolved accident condition but did not include impacts and benefits of the device; (2)
questions related to technical aspects of a description of other possible accident Supporting data for accident analysis,
the device, safety, and the potential conditions during installation and such as accident rates, device failure
impact to the environment. These normal use. There was a summary of rates and modes; (3) Supporting data for
erjones on PROD1PC72 with PROPOSALS

questions would have to be resolved radiological impacts under normal and assumptions, such as market
before the petition could be granted. accident conditions, but there was no penetration and recovery rate; and (4)
To fully evaluate a product designed description of how this information was Data to support how the product would
for distribution to persons exempt from obtained. be more effective or efficient than
licensing and regulatory requirements, As part of the petitioner’s request, the alternative products. NRC must be able
NRC needs for its review detailed petitioner included language for the to independently assess the data

VerDate Aug<31>2005 12:18 Aug 30, 2006 Jkt 208001 PO 00000 Frm 00002 Fmt 4702 Sfmt 4702 E:\FR\FM\31AUP1.SGM 31AUP1
51788 Federal Register / Vol. 71, No. 169 / Thursday, August 31, 2006 / Proposed Rules

submitted in support of a petition. NRC prohibited from entering into, transiting zone is necessary to provide for the
was not able to do this with the through, or anchoring within this safety safety of the participants, crew,
information submitted. zone unless authorized by the Captain spectators, sponsor vessels, and other
The petitioner also stated that there of the Port, or his designated on-scene users of the waterway.
would be label warnings on the device representative. This event involves powerboats racing
that instruct any person who handles, DATES: Comments and related material along a circular track in the Lake
uses or comes in contact with the must reach the Coast Guard on or before Moovalya region of the Colorado River.
product to dispose of it only by October 2, 2006. The size of the boats varies from 11 to
returning it to the distributor for safe ADDRESSES: You may mail comments 21 feet. Approximately sixty to eighty
disposal. Products that are distributed and related material to U.S. Coast Guard boats will participate in this event. The
under an exemption must meet health Sector San Diego, Waterways sponsor has provided two (2) water
and safety requirements without any Management, 2710 N. Harbor Drive, San rescue and three (3) patrol vessels to
regulatory requirements on the end user. Diego, CA 92101–1064. Waterways patrol this event.
Therefore, the petition must address the Management maintains the public
environmental aspects of disposal of the Discussion of Proposed Rule
docket for this rulemaking. Comments
catalytic device presuming that none of and material received from the public, The proposed temporary safety zone
the devices would be returned to the as well as documents indicated in this would be comprised of the following
distributor for disposal. preamble as being available in the area: that portion of the navigable
In summary, the petitioner did not docket, will become part of this docket waterway of Lake Moovalya from
submit information of sufficient scope and will be available for inspection or Headgate Dam to 0.5 nautical miles
and depth for NRC to determine the copying at Waterways Management north of Blue Water Marina, Parker,
adequacy of this product to be between 8 a.m. and 3 p.m., Monday Arizona.
distributed to persons exempt from through Friday, except Federal holidays. The Coast Guard proposes to establish
licensing and regulatory requirements. one (1) safety zone that will be enforced
FOR FURTHER INFORMATION CONTACT:
NRC could not ensure that the public from 6 a.m. to 6 p.m. from November 24,
Lieutenant Junior Grade José Caballero,
health and safety, and the environment, 2006 through November 26, 2006. This
USCG, c/o U.S. Coast Guard Captain of
would be protected based on the safety zone is necessary to provide for
the Port, at (619) 278–7277.
information submitted in support of the the safety of the crews, spectators, and
SUPPLEMENTARY INFORMATION:
petition. participants of the Blue Water Casino
For the reasons cited in this Request for Comments and Resort Thanksgiving Regatta and to
document, the NRC denies this petition. protect other vessels and users of the
We encourage you to participate in
Dated at Rockville, Maryland, this 18th day this rulemaking by submitting waterway. Persons and vessels will be
of August, 2006. comments and related material. If you prohibited from entering into, transiting
For the Nuclear Regulatory Commission. do so, please include your name and through, or anchoring within this safety
Luis A. Reyes, address, identify the docket number for zone unless authorized by the Captain
Executive Director for Operations. this rulemaking COTP San Diego 06– of the Port, or his designated on-scene
055, indicate the specific section of this representative.
[FR Doc. 06–7284 Filed 8–30–06; 8:45 am]
document to which each comment U.S. Coast Guard personnel will
BILLING CODE 7590–01–P
applies, and give the reason for each enforce this safety zone. The Coast
comment. Please submit all comments Guard may be assisted by other Federal,
and related material in an unbound State, or local agencies, including the
DEPARTMENT OF HOMELAND Coast Guard Auxiliary. Section 165.23
SECURITY format, no larger than 81⁄2 by 11 inches,
suitable for copying. If you would like of Title 33, Code of Federal Regulations,
to know they reached us, please enclose prohibits any unauthorized person or
Coast Guard vessel from entering or remaining in a
a stamped, self-addressed postcard or
envelope. We will consider all safety zone. Vessels or persons violating
33 CFR Part 165 this section will be subject to both
comments and material received during
[COTP San Diego 06–055] the comment period. We may change criminal and civil penalties.
RIN 1625–AA00 this proposed rule in view of them. Regulatory Evaluation
Public Meeting This proposed rule is not a
Safety Zone; Blue Water Resort and ‘‘significant regulatory action’’ under
Casino 60th Thanksgiving Regatta, We do not now plan to hold a public
meeting. But you may submit a request section 3(f) of Executive Order 12866,
Colorado River, Parker, AZ Regulatory Planning and Review, and
for a meeting by writing to Waterways
AGENCY: Coast Guard, DHS. Management at the address under does not require an assessment of
ACTION: Notice of proposed rulemaking. ADDRESSES explaining why one would potential costs and benefits under
be beneficial. If we determine that one section 6(a)(3) of that Order. The Office
SUMMARY: The Coast Guard proposes to would aid this rulemaking, we will hold of Management and Budget has not
establish a temporary safety zone within one at a time and place announced by reviewed it under that Order.
the Lake Moovalya Region on the a later notice in the Federal Register. We expect the economic impact of
navigable waters of the Colorado River this proposed rule to be so minimal that
in Parker, Arizona for the Blue Water Background and Purpose a full Regulatory Evaluation is
erjones on PROD1PC72 with PROPOSALS

Resort and Casino 60th Thanksgiving The Southern California Speedboat unnecessary.
Regatta. This temporary safety zone is Club is sponsoring the Blue Water This determination is based on the
necessary to provide for the safety of the Casino and Resort 60th Thanksgiving size and location of the safety zone.
participants, crew, spectators, sponsor Regatta, which is held on the Lake Commercial vessels will not be
vessels of the race, and general users of Moovalya region on the Colorado River hindered by the safety zone.
the waterway. Persons and vessels are in Parker, AZ. This temporary safety Recreational vessels will not be allowed

VerDate Aug<31>2005 12:18 Aug 30, 2006 Jkt 208001 PO 00000 Frm 00003 Fmt 4702 Sfmt 4702 E:\FR\FM\31AUP1.SGM 31AUP1