PROCESS OWNER:
KEYWORDS
EM Environments Management
TEAM - Environments Management
CMDB Configuration Management Database
Environments Refer to Test Environments only
SLA in hours Refer to working hours (09.00hrs to 17.30hrs)
DISTRIBUTION:
Doc
Number
Modifications
Released version.
Date
Author
Page: 2 of 11
_____
Contents
1
2
3
4
5
6
7
Purpose............................................................................................3
Scope...............................................................................................4
Related Documents..........................................................................6
Tools to be used...............................................................................6
Inputs to process..............................................................................6
Outputs from process.......................................................................6
Process defined in both diagrammatic and textual form.................7
7.1 Process Diagram for all Environment Requests.........................7
7.2 Process Description...................................................................7
8 Responsibilities................................................................................8
9 Measurements to be taken............................................................10
10 Training.........................................................................................10
11 Feedback......................................................................................10
12 Appendix......................................................................................12
Page: 3 of 11
_____
Purpose
Development
DevelopmentTeam1
Team1
(X
(Xdistinct
distinctprojects)
projects)
Development
Developm entTeam
Team22
(Y
(Yddistinct
istinctprojects)
projects)
Environments
Environ ments
Management
Management
Service Management
Third
ThirdParty
Party Vendor
Vendor
(Z
(Zdistinct
distinctprojects)
projects)
VMS
VMSSupport
Support
CIS
CISSupport
Support
Legacy
LegacySupport
Support
Desktop
DesktopSupport
Support
SAP
SAPSupport
Support
Networks
Networks Support
Support&
&the
theSecurity
Securityteam
team
Third
ThirdParty
Party Vendors
Vendors
Scope
Page: 4 of 11
_____
Page: 5 of 11
_____
Related Documents
Title
Document reference
4 Tools to be used
The EM team and its stake holders will utilise the following tools in
providing an environments management service;
1) Test Environments Booking System
2) Help Desk Call Logging Tool
5
Inputs to process
Inputs
Document
Reference
Source Process
Pathways Reference
Handover
Document
TBC
Destination
Process
Testing Strategy
Page: 6 of 11
_____
Page: 7 of 11
_____
Acti
on
Ref
ID
1.0
1.1
1.2
1.3
1.4
1.5
2.0
2.1
2.2
2.3
2.4
2.5
3.0
3.1
3.2
Description
Submit Phase
A request for an environment is instigated or raised via the
relevant call management tool and assigned to the EM team.
The request is reviewed for correctness and validated via phone
calls or by email
If there is no existing environment to satisfy the requirement. The
EM team will negotiate with the architecture (for all new hardware
procurement) and support teams to determine a time scale that
such a requirement can be met, continuously managing the
expectation of the project, providing them with updates as
necessary.
If the requirement can be met with existing environments or
requests for code upgrades the agreed SLA in the next section will
be adhered to.
If there are any details that are required from the Software
Configuration Team these are requested, provided and passed on
to the support team who will be carrying out the requested
upgrade or installation.
Build Phase
VMS Team undertake any tasks that are required to complete a
build
DB Team undertake any tasks that are required to complete a
build
Software Configuration/CMS Team undertake any tasks that are
required to complete a build
Networks Team undertake any tasks that are required to complete
a build
Application Support Team under take any tasks that are required
to complete a build.
Sanity Check Phase
Application Support Team and VMS Support Teams undertake
sanity check tests prior to handing over the environment to the
EM team who will hand it back to the Project accompanied by an
electronic handover sheet.
Development or Test Teams undertake their own sanity check tests
Page: 8 of 11
_____
Acti
on
Ref
ID
Description
4.0
4.1
Responsibilities
Role
Development/
Test Teams
Environment
Management
Senior
Management
Forum
Responsibilities
CM Team
Application
Support Team
VMS Support
Team
DB Team
CMS Team
Networks
Team
9
Measurements to be taken
Collection
Metrics
Stora
Purpose
Responsib
Collected
ge
ility
Environme To establish the EM Team
TBC
nt requests number of
raised per
requests raised
Analysis
Responsib
ility
EM Team
Reporting
Responsib
ility
EM Team
Page: 9 of 11
_____
month
Requests
completed
within the
SLA or not
per month.
EM Team
TBC
EM Team
EM Team
10 Training
Training and guidance in the use of the above mentioned tools and the
underlying above processes will be required for all relevant personnel
both for the EM personnel and their stakeholders as may be necessary.
11 Feedback
In order to ensure the processes are continually meeting the specified
requirements and all inputs and outputs are being considered and
incorporated into the procedure there should be an annual review that
is aimed at complementing any IT Audit findings that may be
undertaken with the IT Department.
The annual review should take the form of a formal workshop with all
major users (including those inputting and receiving outputs from the
process) where they run through the process identifying any
improvements that can be made.
This review will take place during May each year with any
recommendation or changes being incorporated into this process
document and versioned controlled via the front page document
history. This will allow any improvements time to bed before IT Audit
review of the process that is conducted every January.
Over and above the annual review any failures in this process should
be quickly identified to Environment Management and investigated. If
there is a need to change the process then this should be completed in
the same way as the annual review.
Document reference number:
Template available for free from www.testenvironmentsmanagement.com
Page: 10 of 11
_____
Appendix A
Environment Handover Notice for a single
Environment
Document reference number:
Template available for free from www.testenvironmentsmanagement.com
Page: 11 of 11
_____
Environment Name:
Application:
<Env1>
<ApplicationTEM >
Server_Type
Database Server
Database Server
Database Server
Applicatio
UserName
Server_name
Sever1
Server2
Server 3
Version/Upgrade
Password
User_descriptio
n
Date
User_Type
Data Set
Change_made
Date
Details
Interfaces
<Define other interfaced applications or environments>