Вы находитесь на странице: 1из 3

Federal Register / Vol. 71, No.

152 / Tuesday, August 8, 2006 / Notices 45093

repair stations are required to report any Type of Request: Revision of a Management and Budget (OMB) to
malfunctions and defects to the currently approved collection. renew an information collection. We
Administrator. OMB Control Number: 2120–0045. published a Federal Register Notice
ADDRESSES: Send comments to the FAA Forms(s): AC Form 5200–7. with a 60-day public comment period
at the following address: Ms. Carla Affected Public: An estimated 7,133 on this information collection on May
Mauney, Room 1033, Federal Aviation Respondents. 18, 2006. We are required to publish
Administration, Information Systems Abstract: Wildlife strike data are this notice in the Federal Register by
and Technology Services Staff, ABA–20, collected to develop standards and the Paperwork Reduction Act of 1995.
800 Independence Ave., SW., monitor hazards to aviation. Data
DATES: Please submit comments by
Washington, DC 20591. identify wildlife strike control
September 7, 2006.
Comments are invited on: Whether requirements and provide in service
ADDRESSES: You may send comments
the proposed collection of information data on aircraft component failure. The
FAA form 5200–7, Bird/Other Wildlife within 30 days to the Office of
is necessary for the proper performance Information and Regulatory Affairs,
of the functions of the Department, Strike Report, is most often completed
by the pilot in charge of an aircraft Office of Management and Budget, 725
including whether the information will 17th Street, NW., Washington, DC
have practical utility; the accuracy of involved in wildlife collision or by Air
Traffic Control Tower personnel, or 20503, Attention DOT Desk Officer. You
the Department’s estimates of the are asked to comment on any aspect of
burden of the proposed information other airline or airport personnel who
have knowledge of the incident. this information collection, including:
collection; ways to enhance the quality, (1) Whether the proposed collection is
utility and clarity of the information to Estimated Annual Burden Hours: An
estimated 592 hours annually. necessary for the FHWA’s performance;
be collected; and ways to minimize the (2) the accuracy of the estimated
burden of the collection of information ADDRESSES: Send comments to the
Office of Information and Regulatory burden; (3) ways for the FHWA to
on respondents, including the use of enhance the quality, usefulness, and
automated collection techniques or Affairs, Office of Management and
Budget, 725 17th Street, NW., clarity of the collected information; and
other forms of information technology. (4) ways that the burden could be
Washington, DC 20503, Attention: FAA
Issued in Washington, DC, on August 2, minimized, including the use of
2006. Desk Officer.
Comments are invited on: Whether electronic technology, without reducing
Carla Mauney, the quality of the collected information.
the proposed collection of information
FAA Information Collection Clearance
is necessary for the proper performance All comments should include the
Officer, Information Systems and Technology Docket number FHWA–2006–25524.
Services Staff, ABA–20. of the functions of the Department,
including whether the information will FOR FURTHER INFORMATION CONTACT: For
[FR Doc. 06–6765 Filed 8–7–06; 8:45 am] questions concerning the National
have practical utility; the accuracy of
BILLING CODE 4910–13–M
the Department’s estimates of the Historic Covered Bridge Program, please
burden of the proposed information contact Dr. Edgar P. Small, Office of
collection; ways to enhance the quality, Bridge Technology, HIBT–30, at (202)
DEPARTMENT OF TRANSPORTATION 366–4622, FAX (202) 366–3077, or e-
utility, and clarity of the information to
Federal Aviation Administration be collected; and ways to minimize the mail edgar.small@dot.gov; and Mr.
burden of the collection of information Everett Mattias, Office of Bridge
Agency Information Collection Activity on respondents, including the use of Technology, HIBT–30, at (202) 366–
Under OMB Review automated collection techniques or 6712, FAX (202) 366–3077, or e-mail
other forms of information technology. everett.mattias@dot.gov. For legal
AGENCY: Federal Aviation questions, please contact Mr. Robert
Administration (FAA), DOT. Issued in Washington, DC, on August 2,
2006.
Black, Office of the Chief Counsel, (202)
ACTION: Notice. 366–1359, robert.black@fhwa.dot.gov;
Carla Mauney,
SUMMARY: The FAA invites public
Federal Highway Administration,
FAA Information Collection Clearance Department of Transportation, 400
comments about our intention to request Officer, Information Systems and Technology
the Office of Management and Budget’s Services Staff, ABA–20.
Seventh Street, SW., Washington, DC
(OMB) revision of a current information 20590. Office hours are from 7:45 a.m.
[FR Doc. 06–6766 Filed 8–7–06; 8:45 am]
collection. The Federal Register Notice to 4:15 p.m., e.t. Monday through
BILLING CODE 4910–13–M
with a 60-day comment period soliciting Friday, except Federal holidays.
comments on the following collection of SUPPLEMENTARY INFORMATION:
information was published on March DEPARTMENT OF TRANSPORTATION Title: National Historic Covered
15, 2006, Vol. 71, No. 50, page 13446. Bridge Preservation Program.
Wildlife strike data are collected to Federal Highway Administration OMB Control Number: 2125–0609.
develop standards and monitor hazards Frequency: Annual.
[Docket No. FHWA–2006–25524] Respondents: The 50 State DOTs,
to aviation. Data identify wildlife strike
Puerto Rico and the District of
control requirements and provide in Agency Information Collection Columbia.
service data on aircraft component Activities: Request for Comments for
failure. New Information Collection Background
DATES: Please submit comments by AGENCY: Federal Highway Covered bridges are unique structures
September 7, 2006. Administration (FHWA), DOT. embodying character, functionality and
FOR FURTHER INFORMATION CONTACT: ACTION: Notice and request for historical prominence. The National
jlentini on PROD1PC65 with NOTICES

Carla Mauney at Carla.Mauney@faa.gov. comments. Historic Covered Bridge Preservation


SUPPLEMENTARY INFORMATION: Program has been established to find
SUMMARY: The FHWA has forwarded the comprehensive and proven means of
Federal Aviation Administration (FAA) information collection request described maintaining the ability of these vestiges
Title: Bird/Other Wildlife Strike. in this notice to the Office of of our bridge-building heritage to

VerDate Aug<31>2005 20:06 Aug 07, 2006 Jkt 208001 PO 00000 Frm 00100 Fmt 4703 Sfmt 4703 E:\FR\FM\08AUN1.SGM 08AUN1
45094 Federal Register / Vol. 71, No. 152 / Tuesday, August 8, 2006 / Notices

continue to serve current and future preserve the Nation’s historic covered • Scheduled start and completion
generations. The program was originally bridges, which are listed or eligible for date for the project (month and year);
established under section 1224 of TEA– listing on the National Register of and
21 and continued under Section 1804 of Historic Places. The FHWA will award • Contact information for the State
SAFETEA–LU. The legislation grants based on applications received DOT, Local Agency (if applicable),
authorizes $10 million annually to be and funds available through FHWA Division Office, and State
appropriated for each fiscal year accompanying appropriations Historic Preservation Officer.
between FY 2006 and FY 2009. The legislation. As indicated above, the FHWA has
program is established to provide grants developed a template for the application
Information Proposed for Collection and the application may be made based
to States for rehabilitation, repair and
preservation of historic covered bridges Information recommended under on this template provided by the FHWA
and to enable the Secretary of TEA–21 and proposed for the current including this information. This
Transportation to perform research and program includes the following: template is available through the FHWA
initiate education programs on historic • State’s Priority Ranking; Division Offices and through the FHWA
covered bridges. • National Bridge Inventory (NBI) Office of Bridge Technology and is
Projects eligible for grants include Structure Number; available at the following URL: http://
rehabilitation and repair together with • Bridge Name; www.fhwa.dot.gov/bridge. The template
preservation through: Installation of fire • Description of Location; is not required but rather is provided for
protection systems, including a • Congressional District and convenience of the applicants.
fireproofing or fire detection system and Representative; Burden Hours for Information
sprinklers, installation of a system to • Year Built; Collection
prevent vandalism and arson, or • Whether the structure is on or
relocation of a bridge to a preservation eligible for listing on the National Burden hour’s estimates and
site. The statute requires that, to the Register of Historic Places and discussions are provided for each item
maximum extent practicable, grant description of the qualities that qualify presented and required within the
projects are carried out in the most the bridge for the National Register; application submittal process.
historically appropriate manner, • Structure description (e.g., number • State’s Priority Ranking; 30 minutes
preserve the existing structure of the Æ The priority ranking will be
of spans, length, width, design type,
historic covered bridge, and provide for performed by the submitting
description of decking, beams/stringers,
the replacement of wooden components agency. Given that a small number
sides and roof, wood species, wood
with wooden components, unless the of applications will be submitted by
preservation system in use, builder,
use of wood is impracticable for safety an individual State, the
traffic carried, etc.);
prioritization process will be
reasons. • General plan and elevation;
Research and education activities limited and 30 minutes is
• Description of previous repair work
include the collection and conservatively assumed to include
(description, year, etc.);
dissemination of information on historic any potential discussion
• Description of proposed work • NBI Structure Number 5 minutes
covered bridges; conducting educational including wood preservative system,
programs relating to the history and Æ Projects submitted must be legally
fire protection, vandalism and arson defined as a ‘bridge’ and must be
construction techniques of historic prevention systems to be used;
covered bridges; conducting research on located on a public road. With this
• Indication of whether the State has constraint, each structure will
the history of historic covered bridges; a historic bridge inventory/management
and conducting research on, and study already have an NBI Structure
plan accepted by the State Historic Number assigned
techniques for, protecting historic Preservation Officer (SHPO). A
covered bridges from rot, fire, natural • Bridge Name; 5 minutes
programmatic agreement for historic Æ A description of the bridge may be
disasters, or weight-related damage. bridges with the SHPO, FHWA and the included in the NBI database;
Guidelines and Administration Advisory Counsel on Historic however, this may or may not be
Preservation (ACHP) may substitute; the commonly referenced name
To administer this program for fiscal
• Description of whether the SHPO used locally. A burden of 5 minutes
years 2006 through 2009, the FHWA
has reviewed and certified this project is assumed to permit the applicant
will collect information necessary to
is warranted in accordance with the to review the NBI record and any
evaluate and rank projects. The
SHPO’s statewide historic preservation additional documentation to isolate
information collection was developed
plan; how it benefits statewide the common bridge name
considering public input 1 and is
intended to only address the project
preservation efforts; how it enhances • Description of Location 10 minutes
cultural tourism or enhances the Æ The location is already included in
funding allotted through the program.
history/economic development of the the NBI database. A burden of 10
Research funding will be administered
community; and other benefits upon minutes is provided assuming that
separately through the FHWA Office of
successful completion of this project; the applicant will elaborate on the
Infrastructure Research and
• Amount of State or local location information
Development (R&D) at the Turner
Fairbank Highway Research Center, who
government matching funds or other • Congressional District and
resources (donated materials or labor Representative; 5 minutes
will also administer the research and
may qualify); Æ The location of the bridge will be
education activities. The FHWA Office
• A statement addressing when the known from the information in the
of Bridge Technology will administer
project is complete, will the bridge meet NBI database. A 5-minute burden is
the grant program to assist the States in
jlentini on PROD1PC65 with NOTICES

the current State or AASHTO standards specified assuming that the


their efforts to rehabilitate, repair or
for the roadway classification that it applicant will have to cross
1 Implementation Guidance for the National carries; reference the location with
Historic Covered Bridge Preservation Program, • Plan for documentation of the Congressional district maps. This
August 23, 2000; 65 FR 51401. bridge and the work performed; time would be negligible if the State

VerDate Aug<31>2005 20:06 Aug 07, 2006 Jkt 208001 PO 00000 Frm 00101 Fmt 4703 Sfmt 4703 E:\FR\FM\08AUN1.SGM 08AUN1
Federal Register / Vol. 71, No. 152 / Tuesday, August 8, 2006 / Notices 45095

has employed a GIS system State Historic Preservation Officer other processes that are performed
including the infrastructure (SHPO). A programmatic agreement independent of this program,
information and the political for historic bridges with the SHPO, including preliminary engineering
boundaries FHWA and the Advisory Counsel and the STIP process. The available
• Year Built 5 minutes on Historic Preservation (ACHP) information must be synthesized on
Æ The year built is already recorded may substitute; 5 minutes the application, which takes a
in the National Bridge Inventory Æ This item is readily obtained nominal amount of time
• Whether the structure is on or eligible through contact with the State • Contact information for the State
for listing on the National Register Historic Preservation Officer DOT, Local Agency (if applicable),
of Historic Places and description of • Description of whether the SHPO has FHWA Division Office, and State
the qualities that qualify the bridge reviewed and certified this project Historic Preservation Officer: 5
for the National Register. 15 is warranted in accordance with the minutes
minutes SHPO’s statewide historic Æ This requires providing a list of
Æ The NBI record indicated whether preservation plan; how it benefits contacts and involves a nominal
the structure is located on or statewide preservation efforts; how amount of time
eligible for the National Register of it enhances cultural tourism or The total amount of time estimated to
Historic Places. The 15-minute enhances the history/economic complete the application is 31⁄2 hours. It
burden is assumed to allow the development of the community; is estimated that FHWA will receive 30
applicant to describe the qualities and other benefits upon successful reports giving us a total of 105 burden
that qualify the bridge for the completion of this project; 45 hours.
National Register minutes Electronic Access: Internet users may
• Structure description (e.g., number of Æ This information is readily access all comments received by the
spans, length, width, design type, obtained through contact with the U.S. DOT Dockets, Room PL–401, by
description of decking, beams/ State Historic Preservation Officer. using the universal resource locator
stringers, sides and roof, wood A total of 45 minutes includes time (URL): http://dms.dot.gov, 24 hours
species, wood preservation system for the State Historic Preservation each day, 365 days each year. Please
in use, builder, traffic carried, etc.) Officer to review the project, in follow the instructions online for more
15 minutes relation to the statewide information and help.
Æ Most of this information will be preservation efforts, to articulate the
included within the NBI database or benefits, and to document the Authority : The Paperwork Reduction Act
on the inspection reports. 15 of 1995; 44 U.S.C. Chapter 35, as amended;
findings
and 49 CFR 1.48.
minutes is assumed for the • Amount of State or local government
applicant to synthesize information matching funds or other resources Issued on: August 1, 2006.
• General plan and elevation—5 (donated materials or labor may James R. Kabel,
minutes qualify); 5 minutes Chief, Management Programs and Analysis
Æ This information is available for Æ A nominal amount of time is Division.
structures that have been placed on required to document the matching [FR Doc. E6–12793 Filed 8–7–06; 8:45 am]
the National Register of Historic funds and amounts BILLING CODE 4910–22–P
Places or for those, which are • When the project is complete, will
eligible and have applications the bridge meet the current State or
complete. This information is also AASHTO standards for the roadway DEPARTMENT OF TRANSPORTATION
available for projects that have classification that it carries; 5
completed conceptual and minutes Federal Motor Carrier Safety
preliminary engineering and design Æ A nominal amount of time is Administration
• Description of previous repair work required to ascertain and identify [Docket No. FMCSA–2006–24932]
(description, year, etc.); 15 minutes whether the bridge will meet the
Æ This information is available from standards for the roadway Commercial Driver’s License
bridge inspection reports and bridge classification as any exception to Standards; Application for Exemption;
files located within the State the standard will be identified Volvo Trucks North America, Inc.
Transportation Agency. Time through the preliminary
estimated is intended for synthesis engineering process and already AGENCY: Federal Motor Carrier Safety
of information from other sources documented Administration (FMCSA), DOT.
• Description of proposed work • Plan for documentation of the bridge ACTION: Notice of application for
including wood preservative and the work performed. 15 exemption; request for comments.
system, fire protection, vandalism minutes
and arson prevention systems to be Æ A plan for documentation is SUMMARY: FMCSA announces that Volvo
used; 15 minutes encouraged. Typically, each State Trucks North America, Inc. (Volvo) has
Æ This information will be Transportation Agency will already applied for an exemption from the
established by the need when have a process in place to document Federal requirement for drivers of
identified and the details will be work performed. Applicants are commercial motor vehicles (CMVs) to
identified through the conceptual encouraged to identify any hold a commercial driver’s license
and preliminary engineering additional requirements warranted (CDL). Volvo requests that the
process, which is done for these historical structures and to exemption cover seven Swedish
independently. A 15-minute burden articulate the overall plan within engineers and technicians who will test-
jlentini on PROD1PC65 with NOTICES

is assumed to synthesize the the application drive CMVs for Volvo within the United
existing information • Scheduled start and completion date States. All seven Volvo employees hold
• Indication of whether the State has a for the project (month and year)— a valid Swedish CDL. Volvo states the
historic bridge inventory/ 5 minutes exemption is needed to support a Volvo
management plan accepted by the Æ This will be determined through field test to meet future air quality

VerDate Aug<31>2005 20:06 Aug 07, 2006 Jkt 208001 PO 00000 Frm 00102 Fmt 4703 Sfmt 4703 E:\FR\FM\08AUN1.SGM 08AUN1

Вам также может понравиться