Assumed data
Angle of Shearing resistance, = 30
Coefficient of friction between soil and concrete, = 0.5
Active Earth Pressure, Ca = (1-sin)/(1+sin) = 0.33
Passive Earth pressure, Cp = (1+sin)/(1-sin) = 3
Depth of excavation for Basement @ Plot.51 = 4 M
Depth of excavation for boundary wall footing = 1 M
Level difference of Natural Ground between Plots 50 & 51 = 0.5 M
Total depth of excavation = 5.5 M
Therefore Total height of wall = 5.5 M
Weight of saturated soil = 16 KN/M3
Preliminary Proportions
Approximate Thickness of Footing Base slab = 0.08h = 0.08x5.5 = 450mm
Assume the Thickness of wall = 300mm
Width of Base slab = 1.5(Ca/3)1/2h = 1.5(0.33/3) 1/2x5.5 = 2.75M
Width of Heel Slab including stem = 2.75/1.5 = 1.85M
Width of Toe Slab = 2.75-1.85 = 0.9M
Stability against Overturning
Force due to active pressure, Pa = Ca**h2/2 = 0.33*16*5.52/2 = 79.86 KN (per M length
of wall)
Overturning Moment Mo = Pa*h/3 = 79.86*5.5/3 = 146.5 KNM
Line of action of Resultant of Vertical forces (considering 1 M Length of wall)
Force (KN)
W1 = 16*1.85*(5.5-0.45) = 149.5
W2 = 25*0.3*(5.5-0.45) = 37.9
W3 = 25*2.75*0.45 = 30.93
W4 = 25*0.2*0.4 = 2
W5 = 18*0.2*1.4 = 5.04
W=225.37
67.73
42.53
3.3
8.32
Mw = 260.18
Therefore Provide T16 @ 100 (Each Face) as Vertical Reinf for a height of 3 M from
base slab, for another 2.5M provide T16 @ 150 and
Provide T12 @ 200 as Horizontal Reinforcement.