Вы находитесь на странице: 1из 2

42376 Federal Register / Vol. 71, No.

143 / Wednesday, July 26, 2006 / Notices

Docket Numbers: ER06–1252–000. service, please e-mail Motions to intervene and protests may
Applicants: E.ON U.S., LLC. FERCOnlineSupport@ferc.gov. or call be filed electronically via the Internet in
Description: E.ON US, LLC on behalf (866) 208–3676 (toll free). For TTY, call lieu of paper. The Commission strongly
of Louisville Gas & Electric Co submits (202) 502–8659. encourages electronic filings. See 18
a request to cancel portions of their CFR 385.2001(a)(1)(iii) and the
Magalie R. Salas,
August 14, 1968 Agreement with instructions on the Commission’s Web
Eastern Kentucky Power Coop & a Secretary. site (http://www.ferc.gov) under the ‘‘e-
request to amend its interconnection [FR Doc. E6–11895 Filed 7–25–06; 8:45 am] Filing’’ link.
agreement with Eastern Kentucky Power BILLING CODE 6717–01–P k. This application is not ready for
Coop. environmental analysis at this time.
Filed Date: July 14, 2006. l. The existing Hyrum City’s
Accession Number: 20060718–0077. DEPARTMENT OF ENERGY Hydropower Project was initially
Comment Date: 5 p.m. Eastern Time constructed in 1930–1931, after
Federal Energy Regulatory receiving an original license on
on Friday, August 4, 2006. Commission November 27, 1929. The project has
Any person desiring to intervene or to
been licensed since that time with one
protest in any of the above proceedings Notice of Application Accepted for
amendment in 1977, and one renewal in
must file in accordance with Rules 211 Filing and Soliciting Motions To
1981. The current license expires on
and 214 of the Commission’s Rules of Intervene and Protest April 30, 2008. The run-of-river, base-
Practice and Procedure (18 CFR 385.211
July 18, 2006. load plant operates on 85-cubic-foot-
and 385.214) on or before 5 p.m. Eastern
Take notice that the following per-second of water diverted by a
time on the specified comment date. It diversion dam located in Blacksmith
is not necessary to separately intervene hydroelectric application has been filed
with the Commission and is available Fork Canyon. The 3,419-foot-by-passed
again in a subdocket related to a reach is not de-watered because the
compliance filing if you have previously for public inspection.
a. Type of Application: A Subsequent flows in the river exceeds the capacity
intervened in the same docket. Protests of the plant, and during low flows,
will be considered by the Commission License. (Minor Project).
b. Project No.: 946–007. Hyrum City operates the plant at less
in determining the appropriate action to than maximum flow to maintain a
c. Date Filed: April 28, 2006.
be taken, but will not serve to make d. Applicant: Hyrum City. continuous flow throughout the river
protestants parties to the proceeding. e. Name of Project: Hyrum City channel for aesthetic enjoyment in the
Anyone filing a motion to intervene or Hydroelectric Project. city park that adjoins the powerhouse.
protest must serve a copy of that f. Location: On the Blacksmith Fork The project includes the following
document on the Applicant. In reference River in Hyrum City, Cache County, constructed facilities: (1) A 15-foot-high,
to filings initiating a new proceeding, Utah. The project affects about 17.03 70-foot-long earth-fill concrete core
interventions or protests submitted on acres of federal lands within the embankment to the north, a 14-foot-
or before the comment deadline need Wasatch Cache National Forest. high, 65-foot-long concrete spillway
not be served on persons other than the g. Filed Pursuant to: Federal Power section, a 15-foot-high, 125-foot-long
Applicant. Act 16 U.S.C. 791(a)–825(r). earth-fill concrete core embankment to
The Commission encourages h. Applicant Contact: Dean Howard, the north which makes the total length
electronic submission of protests and Mayor, Hyrum City 83 West Main of the dam approximately 260-foot-long;
interventions in lieu of paper, using the Street, Hyrum Utah 84319; (435) 245– (2) a 16-foot-high, 8-foot-wide concrete
FERC Online links at http:// 6033, or Ken Tuttle or Mike Wilcox, intake structure with a 20-foot-high, 8-
www.ferc.gov. To facilitate electronic Sunrise Engineering, Inc., 25 East 500 foot-wide trash rack and fish ladder; (3)
service, persons with Internet access North, Fillmore, UT 84631; (435) 743– a 60-inch-diameter concrete penstock
who will eFile a document and/or be 6151. inlet with head gate; (4) a 3,470-foot-
listed as a contact for an intervenor i. FERC Contact: Gaylord Hoisington, long, 48-inch-diameter concrete
must create and validate an (202) 502-6032 or penstock going into a 130-foot-long, 42-
eRegistration account using the gaylord.hoisington@FERC.gov. inch-diameter steel penstock; (5) a 37-
eRegistration link. Select the eFiling j. Deadline for filing motions to acre-foot de-silting pond; (6) a 26-foot-
link to log on and submit the intervene and protests and requests for wide, 39-foot-long, 20-foot-high brick
intervention or protests. cooperating agency status: 60 days from powerhouse; (7) a 400-kilowatt Leffel
Persons unable to file electronically the issuance date of this notice. horizontal shaft scroll case turbine; (8)
should submit an original and 14 copies All documents (original and eight a 100-foot, 2.4-kV underground
of the intervention or protest to the copies) should be filed with: Magalie R. transmission line and; (9) appurtenant
Federal Energy Regulatory Commission, Salas, Secretary, Federal Energy facilities.
888 First St. NE., Washington, DC Regulatory Commission, 888 First The average annual generation of the
20426. Street, NE., Washington, DC 20426. project is approximately 3,083,000
The filings in the above proceedings The Commission’s Rules of Practice kilowatt-hours and there are no
are accessible in the Commission’s require all intervenors filing documents proposed changes to the facilities or the
eLibrary system by clicking on the with the Commission to serve a copy of current mode of operation at this time.
appropriate link in the above list. They that document on each person on the m. A copy of the application is
are also available for review in the official service list for the project. available for review at the Commission
Commission’s Public Reference Room in Further, if an intervenor files comments in the Public Reference Room or may be
Washington, DC. There is an or documents with the Commission viewed on the Commission’s Web site at
sroberts on PROD1PC70 with NOTICES

eSubscription link on the Web site that relating to the merits of an issue that http://www.ferc.gov using the
enables subscribers to receive e-mail may affect the responsibilities of a ‘‘eLibrary’’ link. Enter the docket
notification when a document is added particular resource agency, they must number excluding the last three digits in
to a subscribed dockets(s). For also serve a copy of the document on the docket number field to access the
assistance with any FERC Online that resource agency. document. For assistance, contact FERC

VerDate Aug<31>2005 17:16 Jul 25, 2006 Jkt 208001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\26JYN1.SGM 26JYN1
Federal Register / Vol. 71, No. 143 / Wednesday, July 26, 2006 / Notices 42377

Online Support at d. Applicant: Ronald W. and Kathryn capital letters the title ‘‘COMMENTS’’,
FERCOnlineSupport@ferc.gov or toll- C. Denney. ‘‘RECOMMENDATIONS FOR TERMS
free at 1–866–208–3676, or for TTY, e. Name of Project: Coiner Mill AND CONDITIONS’’, ‘‘PROTEST’’, OR
(202) 502–8659. A copy is also available Project. ‘‘MOTION TO INTERVENE’’, as
for inspection and reproduction at the f. Location: The project is located on applicable, and the Project Number of
address in item h above. the South River in Augusta County, the particular application to which the
You may also register online at http:// Virginia. filing refers (P–8412–003). All
www.ferc.gov/docs-filing/ g. Filed Pursuant to: Federal Power documents (original and eight copies)
esubscription.asp to be notified via e- Act, 16 U.S.C. 791a–825r. should be filed with: Ms. Magalie R.
mail of new filings and issuances h. Applicant Contact: Mr. Ronald W. Salas, Secretary, Federal Energy
related to this or other pending projects. Denney, Route 1, P.O. Box 18, Regulatory Commission, 888 First
For assistance, contact FERC Online Waynesboro, VA 22980, (703) 944–6191. Street, NE., Washington DC 20426. A
Support. i. FERC Contact: Henry Woo, (202) copy of any motion to intervene must
n. Anyone may submit a protest or a 502–8872. also be served upon each representative
motion to intervene in accordance with j. Deadline for filing comments and or of the Applicant specified in the
the requirements of Rules of Practice motions: August 21, 2006. particular application.
and Procedure, 18 CFR 385.210, k. Description of Application: Ronald p. Agency Comments: Federal, state,
385.211, and 385.214. In determining W. and Kathryn C. Denney propose to and local agencies are invited to file
the appropriate action to take, the surrender the exemption from licensing comments on the described application.
Commission will consider all protests for the Coiner Mill Project. As part of A copy of the application may be
filed, but only those who file a motion their request, Ronald W. and Kathryn C. obtained by agencies directly from the
to intervene in accordance with the Denney propose to decommission the Applicant. If an agency does not file
Commission’s Rules may become a project and sell the electrical equipment comments within the time specified for
party to the proceeding. Any protests or and turbines. filing comments, it will be presumed to
motions to intervene must be received l. Location of the Application: This have no comments. One copy of an
on or before the specified deadline date filing is available for review and agency’s comments must also be sent to
for the particular application. reproduction at the Commission in the the Applicant’s representatives.
All filings must (1) bear in all capital Public Reference Room, Room 2A, 888 q. Comments, protests, and
letters the title ‘‘PROTEST’’ or First Street, NE., Washington, DC 20426. interventions may be filed electronically
‘‘MOTION TO INTERVENE;’’ (2) set The filing may also be viewed on the via the Internet in lieu of paper. See, 18
forth in the heading the name of the Commission’s Web site at http:// CFR 385.2001(a)(1)(iii) and the
applicant and the project number of the www.ferc.gov using the ‘‘eLibrary’’ link. instructions on the Commission’s Web
application to which the filing Enter the docket number, P–8412, in the site at http://www.ferc.gov under the ‘‘e-
responds; (3) furnish the name, address, docket number field to access the Filing’’ link.
and telephone number of the person document. You may also register online
at http://www.ferc.gov/docs-filing/ Magalie R. Salas,
protesting or intervening; and (4) Secretary.
otherwise comply with the requirements esubscription.asp to be notified via e-
mail of new filings and issuances [FR Doc. E6–11889 Filed 7–25–06; 8:45 am]
of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the related to this or other pending projects. BILLING CODE 6717–01–P

application directly from the applicant. For assistance, call toll-free 1–866–208–
A copy of any protest or motion to 3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, DEPARTMENT OF ENERGY
intervene must be served upon each
representative of the applicant specified call (202) 502–8659. A copy is also
Federal Energy Regulatory
in the particular application. available for inspection and Commission
reproduction at the address in item (h)
Magalie R. Salas, above. [Docket Nos. ER06–301–000; ER06–301–
Secretary. m. Individuals desiring to be included 001]
[FR Doc. E6–11880 Filed 7–25–06; 8:45 am] on the Commission’s mailing list should
so indicate by writing to the Secretary Xcel Energy Services Inc.; Notice
BILLING CODE 6717–01–P
of the Commission. Extending Deadline for Post-Technical
n. Comments, Protests, or Motions to Conference Comments
DEPARTMENT OF ENERGY Intervene: Anyone may submit July 19, 2006.
comments, a protest, or a motion to A technical conference was convened
Federal Energy Regulatory intervene in accordance with the on Monday, June 12, 2006, from 10 a.m.
Commission requirements of Rules of Practice and to 11:30 p.m. at the offices of the
Procedure, 18 CFR 385.210, .211, .214. Federal Energy Regulatory Commission,
Notice of Application for Surrender of In determining the appropriate action to
5MW Exemption and Soliciting 888 First Street, NE., Washington, DC
take, the Commission will consider all 20426. The technical conference
Comments, Motions To Intervene, and protests or other comments filed, but
Protests addressed, among other things, the two
only those who file a motion to issues related to Xcel Energy Services
July 19, 2006. intervene in accordance with the Inc.’s (XES) proposed Service Schedules
Take notice that the following Commission’s Rules may become a H and I, as discussed in the
hydroelectric application has been filed party to the proceeding. Any comments, Commission’s order issued on May 5,
protests, or motions to intervene must
sroberts on PROD1PC70 with NOTICES

with the Commission and is available 2006.1 Prior to the technical conference,
for public inspection: be received on or before the specified a notice was issued on May 31, 2006,
a. Application Type: Surrender of comment date for the particular that set forth two questions; namely,
5MW Exemption. application.
b. Project No.: 8412–003. o. Filing and Service of Responsive 1 Xcel Energy Services Inc., 115 FERC ¶ 61,148

c. Date Filed: June 20, 2006. Documents: Any filings must bear in all (2006).

VerDate Aug<31>2005 17:16 Jul 25, 2006 Jkt 208001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\26JYN1.SGM 26JYN1

Вам также может понравиться