Вы находитесь на странице: 1из 2

Federal Register / Vol. 71, No.

135 / Friday, July 14, 2006 / Notices 40091

Comment Date: 5 p.m. Eastern Time protests on persons other than the public participated in the meetings.
on July 28, 2006. Applicant. These scoping meetings were used to
The Commission encourages define the issues and alternatives
Magalie R. Salas,
electronic submission of protests and addressed in Public Service’s
Secretary. interventions in lieu of paper using the application.
[FR Doc. E6–11179 Filed 7–13–06; 8:45 am] ‘‘eFiling’’ link at http://www.ferc.gov. Based on comments received, since
BILLING CODE 6717–01–P Persons unable to file electronically the scoping meeting, Commission staff
should submit an original and 14 copies has determined that licensing the Santee
of the protest or intervention to the Cooper Hydroelectric Project could
DEPARTMENT OF ENERGY Federal Energy Regulatory Commission, constitute a major federal action
888 First Street, NE., Washington, DC significantly affecting the quality of the
Federal Energy Regulatory
20426. human environment. Therefore, staff
Commission
This filing is accessible on-line at intends to prepare an Environmental
[Docket No. RP06–427–000] http://www.ferc.gov, using the Impact Statement (EIS) for the project.
‘‘eLibrary’’ link and is available for The staff’s EIS will objectively
Williston Basin Interstate Pipeline review in the Commission’s Public consider both site-specific and
Company; Notice of Tariff Filing Reference Room in Washington, DC. cumulative environmental impacts of
There is an ‘‘eSubscription’’ link on the the project and reasonable alternatives,
July 7, 2006.
Web site that enables subscribers to and will include economic and
Take notice that on July 5, 2006, engineering analyses.
receive e-mail notification when a
Williston Basin Interstate Pipeline A draft EIS will be issued and
document is added to a subscribed
Company (Williston Basin) tendered for circulated for review by all interested
docket(s). For assistance with any FERC
filing as part of its FERC Gas Tariff, parties. All comments filed on the draft
Online service, please e-mail
Second Revised Volume No. 1, the EIS will be analyzed by the staff and
FERCOnlineSupport@ferc.gov, or call
following tariff sheets, to become considered in the final EIS. The staff’s
(866) 208–3676 (toll free). For TTY, call
effective August 4, 2006: conclusions and recommendations will
(202) 502–8659.
Second Revised Sheet No. 504 be available for the consideration of the
Second Revised Sheet No. 530 Magalie R. Salas, Commission in reaching its final
Second Revised Sheet No. 604 Secretary. licensing decision.
Third Revised Sheet No. 628 [FR Doc. E6–11177 Filed 7–13–06; 8:45 am] This notice informs all interested
Third Revised Sheet No. 629 individuals, organizations, and agencies
BILLING CODE 6717–01–P
Third Revised Sheet No. 653
Second Revised Sheet No. 686
with environmental expertise and
Original Sheet No. 686A concerns, that: (1) The Commission staff
Third Revised Sheet No. 727 DEPARTMENT OF ENERGY has decided to prepare an EIS; and (2)
Fifth Revised Sheet No. 738 the scoping conducted on the Santee
Federal Energy Regulatory Cooper Hydroelectric Project by
Williston Basin states that this filing Commission Commission staff and comments filed
seeks to revise Williston Basin’s Form of
[Project No. 199–205] with the Commission on the application
Service Agreements to clarify that a
will be taken into account in the EIS.
specific date or triggering event may be South Carolina Public Service Any questions regarding this notice
used as the date when service begins Authority; Notice of Intent To Prepare may be directed to Monte Terhaar at
under the agreement. Further, if a an Environmental Impact Statement (202) 502–6035, or via e-mail at
triggering event is used as the Effective monte.terhaar@ferc.gov.
Date, the Termination Date of the July 7, 2006.
agreement may be based on a specific On March 15, 2004, the South Magalie R. Salas,
length of time starting at the Effective Carolina Public Service Authority Secretary.
Date. (Public Service) filed an application for [FR Doc. E6–11181 Filed 7–13–06; 8:45 am]
Any person desiring to intervene or to a new license for the continued BILLING CODE 6717–01–P
protest this filing must file in operation of the 134.52-megawatt Santee
accordance with Rules 211 and 214 of Cooper Hydroelectric Project (FERC No.
the Commission’s Rules of Practice and 199–205). The project is located on the DEPARTMENT OF ENERGY
Procedure (18 CFR 385.211 and Santee and Cooper Rivers in Berkeley,
385.214). Protests will be considered by Calhoun, Clarendon, Orangeburg, and Federal Energy Regulatory
the Commission in determining the Sumter Counties, South Carolina. The Commission
appropriate action to be taken, but will project does not occupy any Federal
not serve to make protestants parties to lands. Notice of Application Ready for
the proceeding. Any person wishing to In accordance with the National Environmental Analysis and Soliciting
become a party must file a notice of Environmental Policy Act (NEPA) and Comments, Recommendations, Terms
intervention or motion to intervene, as the Commission’s regulations, and Conditions, and Prescriptions
appropriate. Such notices, motions, or Commission staff held public scoping July 6, 2006.
protests must be filed in accordance meetings for the Santee Cooper Take notice that the following
with the provisions of section 154.210 Hydroelectric Project on May 17, 2005, hydroelectric application has been filed
of the Commission’s regulations (18 CFR in Moncks Corner, South Carolina, and with the Commission and is available
154.210). Anyone filing an intervention on May 18, 2005, in Manning, South for public inspection.
jlentini on PROD1PC65 with NOTICES

or protest must serve a copy of that Carolina. Additionally, Commission a. Type of Application: New Major
document on the Applicant. Anyone staff held an agency scoping meeting on License.
filing an intervention or protest on or May 19, 2005, in Moncks Corner, South b. Project No: 11910–002.
before the intervention or protest date Carolina. Commission staff, state, c. Date Filed: August 31, 2004.
need not serve motions to intervene or Federal, and local agencies, and the d. Applicant: Symbiotics, LLC.

VerDate Aug<31>2005 17:44 Jul 13, 2006 Jkt 208001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\14JYN1.SGM 14JYN1
40092 Federal Register / Vol. 71, No. 135 / Friday, July 14, 2006 / Notices

e. Name of Project: Applegate Dam generation is estimated to be 44,300,000 intent may be filed in response to this
Hydroelectric Project. kilowatt-hours. notice.
f. Location: On the Applegate River, m. A copy of the application is o. Procedural schedule and final
near the town of Medford, Jackson available for review at the Commission amendments: Revisions to the schedule
County, Oregon. The proposed project in the Public Reference Room or may be will be made as appropriate. The
would be located at the existing viewed on the Commission’s Web site at schedule given in the April 10, 2006
Applegate dam and reservoir, which are http://www.ferc.gov using the
Notice of Application Accepted for
owned and operated by the Department ‘‘eLibrary’’ link. Enter the docket
Filing is revised as follows:
of the Army, Corps of Engineers. The number excluding the last three digits in
proposed project boundary would the docket number field to access the Notice that application is ready for
include approximately 8.3 acres of U.S. document. For assistance, contact FERC environmental analysis (EA): July 2006.
lands. Online Support at Notice of the availability of the EA:
g. Filed Pursuant to: Federal Power FERCOnlineSupport@ferc.gov or toll- January 2007.
Act, 16 U.S.C. 791 (a)–825(r). free at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available Ready for Commission’s decision on
h. Applicant Contact: Brent L. Smith,
Northwest Power Services, Inc. P.O. Box for inspection and reproduction at the the application: April 2007.
535, Rigby, Idaho 83442, (208)745–0834. address in item h above. Magalie R. Salas,
i. FERC Contact: Tim Looney, 202– You may also register online at http:// Secretary.
502–6096, timothy.looney@ferc.gov. www.ferc.gov/docs-filing/ [FR Doc. E6–11169 Filed 7–13–06; 8:45 am]
j. Deadline for filing comments, esubscription.asp to be notified via e-
BILLING CODE 6717–01–P
recommendations, terms and mail of new filings and issuances
conditions, and prescriptions is 60 days related to this or other pending projects.
from the issuance of this notice; reply For assistance, contact FERC Online
DEPARTMENT OF ENERGY
comments are due 105 days from the Support.
issuance date of this notice. All filings must (1) bear in all capital Federal Energy Regulatory
All documents (original and eight letters the title ‘‘COMMENTS’’, ‘‘REPLY Commission
copies) should be filed with: Magalie R. COMMENTS’’,
Salas, Secretary, Federal Energy ‘‘RECOMMENDATIONS,’’ ‘‘TERMS
Regulatory Commission, 888 First AND CONDITIONS,’’ or [Docket No. PR05–17–002]
Street, NE., Washington, DC 20426. ‘‘PRESCRIPTIONS;’’ (2) set forth in the
Duke Energy Guadalupe Pipeline, Inc.;
The Commission’s Rules of Practice heading the name of the applicant and
the project number of the application to Notice of Staff Panel
require all intervenors filing documents
with the Commission to serve a copy of which the filing responds; (3) furnish July 7, 2006.
that document on each person on the the name, address, and telephone
official service list for the project. number of the person submitting the Take notice that the Commission will
Further, if an intervenor files comments filing; and (4) otherwise comply with conduct a staff panel on Wednesday,
or documents with the Commission the requirements of 18 CFR 385.2001 July 26, 2006, at 10 a.m. Eastern Time,
relating to the merits of an issue that through 385.2005. All comments, in a room to be designated at the Federal
may affect the responsibilities of a recommendations, terms and conditions Energy Regulatory Commission, 888
particular resource agency, they must or prescriptions must set forth their First Street, NE., Washington, DC 20426.
also serve a copy of the document on evidentiary basis and otherwise comply The staff panel will give the parties an
that resource agency. with the requirements of 18 CFR 4.34(b). opportunity to raise all issues
Comments, recommendations, terms Agencies may obtain copies of the concerning whether Guadalupe’s
and conditions, and prescriptions may application directly from the applicant. proposed base rates are fair and
be filed electronically via the Internet in Each filing must be accompanied by equitable, including not only issues
lieu of paper. The Commission strongly proof of service on all persons listed on concerning Guadalupe’s proposed base
encourages electronic filings. See 18 the service list prepared by the rates but also issues concerning its
CFR 385.2001(a)(1)(iii) and the Commission in this proceeding, in
proposed fuel retention percentage.
instructions on the Commission’s Web accordance with 18 CFR 4.34(b), and
site (http://www.ferc.gov) under the ‘‘e- 385.2010. FERC conferences are accessible
Filing’’ link. You may also register online at http:// under section 508 of the Rehabilitation
k. This application has been accepted www.ferc.gov/docs-filing/ Act of 1973. For accessibility
and is now ready for environmental esubscription.asp to be notified via e- accommodations please send an e-mail
analysis. mail of new filings and issuances to accessibility@ferc.gov or call toll free
l. The Applicant proposes to utilize related to this or other pending projects. (866) 208–3372 (voice) or 202–208–1659
the existing Applegate Dam, Applegate For assistance, contact FERC Online (TTY), or send a FAX to 202–208–2106
Reservoir, outlet works, and spillway, Support. with the required accommodations.
owned and operated by the Department n. Public notice of the filing of the All interested parties and staff are
of the Army, Corps of Engineers. The initial development application, which permitted to attend. For further
Applicant proposes to construct a has already been given, established the information please contact Eric
powerhouse with an installed capacity due date for filing competing Winterbauer at (202) 502–8329 or e-mail
of 10 megawatts at the area downstream applications or notices of intent. Under
eric.winterbauer@ferc.gov.
from the dam. The Applicant also the Commission’s regulations, any
jlentini on PROD1PC65 with NOTICES

proposes to construct a new 15-mile- competing development application Magalie R. Salas,


long, 69-kilovolt overhead power must be filed in response to and in Secretary.
transmission line to connect the compliance with public notice of the [FR Doc. E6–11182 Filed 7–13–06; 8:45 am]
powerhouse with a substation located at initial development application. No
BILLING CODE 6717–01–P
Ruch, Oregon. The average annual competing applications or notices of

VerDate Aug<31>2005 17:44 Jul 13, 2006 Jkt 208001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\14JYN1.SGM 14JYN1

Вам также может понравиться