Вы находитесь на странице: 1из 6

VT

VT
VT
VT
VT
VT
VT
VT

4
10
10
10
10
10
20
20

CD
CDS
CDL
CDS
CDL
CDH
CDS
CDL

S
C
C
C
C

S
S
S
C

16
16
16
16
10
10
10
16
16
10
16
25
10
6
6
16
16
6
16
25
6
16
25
6
6
16
16
16
16
16
25
10
10
25
10
25
10

2
2
2
2
2
2
2
2
2
1
1
1
2
2
2
2
2
1
1
1
1
1
1
1
1
2
2
2
2
1
1
2
1
1
5
5
5

16
16
16
25
25
10
10
10

2
2
2
2
2
2
2
2

ANP17.12.2009,Rev.113.01.2010

3
3
3
3
3
3

VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
N
N
N
N
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
FA
FA
FA
FA
FA
FA

20
20
20
20
20
20
20
20
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
80
80
80
80
80
80
80
130
130
1306
1306
1309
180
180
250
250
2508
2508
159
161
184
184
192
192

Typ
CDS
CDL
CDS
CDL
CDH
B
B
B
CDS
CDL
CDS
CDL
CDS
CDL
CDH
CDM
B
B
B
CDL
CDL
B
B
CDL
CDL
CDL
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
CDL
B
B
B

Anleitung-Nr.

16
16
25
25
10
10
16
25
10
10
16
16
25
25
10
10
10
16
25
10
16
10
16
6
10
16
6
10
16
25
10
16
10
16
10
10
16
6
10
6
10
6
6
6
6
6
8

2
2
2
2
2
3
3
1
2
2
2
2
2
2
2
2
3
3
3
2
2
3
3
2
2
2
3
3
3
3
4
4
4
4
4
4
4
4
4
4
4
3
1
2
3
4
4

CT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT

Typ
193
B
50T CDS
50T CDL
50T CDS
50T CDL
50T CDS
50T CDL
50M CDS
50M CDL
50M CDS
50M CDL
50M CDS
50M CDL
50X CDS
50X CDL
50X CDS
50X CDL
50X CDS
50X CDL
100T CDL
100T CDL
100T CDL
100T
B
100T
B
100T
B
100T BT
100T BT
100M CDL
100M CDL
100M
B
100M
B
100M
B
100X CDL
100X CDL
100X
B
100X
B
100X
B
100T CFL
100M CFL
100X CFL
150S CD
150S CD
150S CD
150S
B
150S
B
150S
B
150S
B

Anleitung-Nr.

6
10
10
16
16
25
25
10
10
16
16
25
25
10
10
16
16
25
25
6
10
16
10
16
25
10
16
10
16
10
16
25
10
16
10
16
25
16
16
16
6
10
16
6
10
16
25

4
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

Industrie-Gestelle

Anleitung-Nr.

C
C
S
S
S
C
C
C
C

Industrie-Gestelle

Typ
4
CDS
4
CDL
10
CDS
10
CDL
20
CDL
20
CDS
20
CDL
20
CDS
20
CDL
20
BC
20
BC
20
BC
40
CDL
40
CDS
40
CDL
40
CDS
40
CDL
40
BC
40
BC
40
BC
80
BC
80
BC
80
BC
159
BC
161
BC
50T CDL
50M CDL
50X CDL
100M CDL
100M BC
100M BC
100X CDL
100X BC
100X BC
150L
BC
150L
BC
250L
BC
Optional

Industrie-Gestelle

Food-Gestelle
Industrie-Gestelle

VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
VT
FA
FA
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT

NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
NF
NF
NT
NT
NT

150S
150S
150L
150L
150L
150L
150L
150L
150L
150L
150L
150X
150X
150X
250S
250S
250S
250S
250S
250S
250S
250M
250M
250M
250L
250L
250L
250L
250L
350S
350S
350S
350S
350M
350M
350M
350M
350L
350L
350L
350L
350
350
500T
500M
500X

Typ
BT
BT
CD
CD
CD
B
B
B
B
BT
BT
B
B
B
CD
CD
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B

Anleitung-Nr.

10
16
6
10
16
6
10
16
25
10
16
10
16
25
6
10
6
7
10
16
25
10
16
25
6
7
10
16
25
6
10
16
25
6
10
16
25
6
10
16
25
6
10
10
10
10

3
3
3
3
3
3
3
3
3
3
3
3
3
3
2
2
5
5
5
5
5
5
5
5
5
5
5
5
5
4
4
4
4
4
4
4
4
4
4
4
4
4
4
5
5
5

TransportundAufrichtungsanleitungbersichtPWT

Instructions for transport and setting up


of gasketed plate heat exchangers (PHE)
DANGER

DANGER

ATTENTION
Damage to
connection nozzles!
Never aach slinging
equipment to the
connection nozzles.

Damage to the heat


exchanger plates!
Danger to life
if the load slips!
Always transport the
PHE horizontally.
Never transport the PHE
using the tensioning bolts.

Never transport the


PHE using a li-truck.
Always transport the
PHE suspended.

Danger to life if incorrect


slinging equipment is used!
Never use steel hawsers
or chains.
Use only undamaged
round slings.

Setting up the PHE


Use two undamaged round slings
of sucient strength.
1. Place the round slings around
both top pairs of tensioning nuts
of the PHE [a] and aach these
to the crane hook.
2. Tilt the PHE through its centre
of gravity [b] using liing gear.

3. Lower the PHE slowly


to the oor [c] and set down
in the correct position.

Suspended transport of the PHE


Lifting

3. Li the PHE slowly, until the


round slings are equally tensioned
and the PHE is suspended almost
horizontally.
Lowering
4. Lower the PHE slowly to prevent
any impact when it is set down.

1. Aach a round sling to the xed plate


around the top outer pairs of tensioning
nuts [d] where the tensioning nuts project
insuciently, the round sling must be placed
completely around the base plate.

2. Aach another round sling to the


removable plate above the beam
and around the top outer pairs
of tensioning nuts [e].
 Please note: When two round slings
are used, these must be of dierent lengths!
GEA Heat Exchangers
Karl-Schiller-Strae 1-3 31157 Sarstedt Germany
Phone +49 5066 601-0 Fax +49 5066 601-104
info@gea-ecoflex.com www.gea-phe.com

Instructions for transport and setting up


of gasketed plate heat exchangers (PHE)
DANGER

DANGER

II

ATTENTION
Damage to
connection nozzles!
Never aach slinging
equipment to the
connection nozzles.

Damage to the heat


exchanger plates!
Danger to life
if the load slips!
Always transport the
PHE horizontally.
Never transport the PHE
using the tensioning bolts.

Never transport the


PHE using a li-truck.
Always transport the
PHE suspended.

Danger to life if incorrect


slinging equipment is used!
Never use steel hawsers
or chains.
Use only undamaged
round slings.

Setting up the PHE


Use two undamaged round slings
of sucient strength.
1. Place the round slings around
both top pairs of tensioning nuts
of the PHE [a] and aach these
to the crane hook.
2. Tilt the PHE through its centre
of gravity [b] using liing gear.

3. Lower the PHE slowly


to the oor [c] and set down
in the correct position.

Suspended transport of the PHE


Attaching the round slings

Lifting

1. Aach a round sling of sucient


length or two round slings of equal
length around the top outer pairs
of tensioning nuts [d] on both
sides of the PHE.

2. Li the PHE slowly, until the


round slings are equally tensioned
and the PHE is suspended almost
horizontally.
Lowering
3. Lower the PHE slowly to prevent
any impact when it is set down.

GEA Heat Exchangers


Karl-Schiller-Strae 1-3 31157 Sarstedt Germany
Phone +49 5066 601-0 Fax +49 5066 601-104
info@gea-ecoflex.com www.gea-phe.com

Instructions for transport and setting up


of gasketed plate heat exchangers (PHE)
DANGER

DANGER

III

ATTENTION
Damage to
connection nozzles!
Never aach slinging
equipment to the
connection nozzles.

Damage to the heat


exchanger plates!
Danger to life
if the load slips!
Always transport the
PHE horizontally.
Never transport the PHE
using the tensioning bolts.

Never transport the


PHE using a li-truck.
Always transport the
PHE suspended.

Danger to life if incorrect


slinging equipment is used!
Never use steel hawsers
or chains.
Use only undamaged
round slings.

Setting up the PHE


Use two undamaged round slings
of sucient strength.
1. Place the round slings around
both top pairs of tensioning nuts
of the PHE [a] and aach these
to the crane hook.
2. Tilt the PHE through its centre
of gravity [b] using liing gear.

3. Lower the PHE slowly


to the oor [c] and set down
in the correct position.

Suspended transport of the PHE


Lifting
3. Li the PHE slowly, until the
round slings are equally tensioned
and the PHE is suspended almost
horizontally.
Absenken

4. Lower the PHE slowly to prevent


any impact when it is set down.

1. Aach a round sling to both shackle


2. Aach another round sling above
the beam and around the top outer
holes in the xed plate [d] with shackles.
pairs of tensioning nuts [e] on the
removable plate.
 Please note: When two round slings
are used, these must be of dierent lengths!
GEA Heat Exchangers
Karl-Schiller-Strae 1-3 31157 Sarstedt Germany
Phone +49 5066 601-0 Fax +49 5066 601-104
info@gea-ecoflex.com www.gea-phe.com

Instructions for transport and setting up


of gasketed plate heat exchangers (PHE)
DANGER

DANGER

IV

ATTENTION
Damage to
connection nozzles!
Never aach slinging
equipment to the
connection nozzles.

Damage to the heat


exchanger plates!
Danger to life
if the load slips!
Always transport the
PHE horizontally.
Never transport the PHE
using the tensioning bolts.

Never transport the


PHE using a li-truck.
Always transport the
PHE suspended.

Danger to life if incorrect


slinging equipment is used!
Never use steel hawsers or
chains when seing up the PHE.
Use only undamaged
round slings.

Setting up the PHE


Use two undamaged round slings
of sucient strength.
1. Place the round slings around
both top pairs of tensioning nuts
of the PHE [a] and aach these
to the crane hook.
2. Tilt the PHE through its centre
of gravity [b] using liing gear.

3. Lower the PHE slowly


to the oor [c] and set down
in the correct position.

Suspended transport of the PHE


Attaching the sling gears

Lifting

1. Aach a round sling to each


transport lug [d], using shackles.
(Chains and steel hawsers are allowed
only if these have no direct contact
with the PHE. Otherwise the PHE
may be damaged.)

2. Li the PHE slowly, until the


round slings are equally tensioned
and the PHE is suspended almost
horizontally.
Lowering
3. Lower the PHE slowly to prevent
any impact when it is set down.

GEA Heat Exchangers


Karl-Schiller-Strae 1-3 31157 Sarstedt Germany
Phone +49 5066 601-0 Fax +49 5066 601-104
info@gea-ecoflex.com www.gea-phe.com

Instructions for transport and setting up


of gasketed plate heat exchangers (PHE)
DANGER

DANGER

ATTENTION
Damage to
connection nozzles!
Never aach slinging
equipment to the
connection nozzles.

Damage to the heat


exchanger plates!
Danger to life
if the load slips!
Always transport the
PHE horizontally.
Never transport the PHE
using the tensioning bolts.

Never transport the


PHE using a li-truck.
Always transport the
PHE suspended.

Danger to life if incorrect


slinging equipment is used!
Never use steel hawsers or
chains when seing up the PHE.
Use only undamaged
round slings.

Setting up the PHE


Use two undamaged round slings
of sucient strength.
1. Place the round slings around
both top pairs of tensioning nuts
of the PHE [a] and aach these
to the crane hook.
2. Tilt the PHE through its centre
of gravity [b] using liing gear.

3. Lower the PHE slowly


to the oor [c] and set down
in the correct position.

Suspended transport of the PHE


d

Attaching the round slings

Lifting

1. Aach a round sling to the hole


in the plate that is bolted to the
fixed plate [d], using a shackle.
(Chains and steel hawsers are
allowed only if these have no direct
contact with the PHE. Otherwise
the PHE may be damaged.)

3. Li the PHE slowly, until the


round slings are equally tensioned
and the PHE is suspended almost
horizontally.

2. Aach another round sling to the


hole in the plate that is bolted
to the strut [e], using a shackle.
 Please note:
When two round slings (chains or
steel hawsers) are used, these must
be of dierent lengths!

Lowering
4. Lower the PHE slowly to prevent
any impact when it is set down.

GEA Heat Exchangers


Karl-Schiller-Strae 1-3 31157 Sarstedt Germany
Phone +49 5066 601-0 Fax +49 5066 601-104
info@gea-ecoflex.com www.gea-phe.com

Вам также может понравиться